Federal contract award

FA460026P0015

THE CONTRACTOR SHALL REPLACE THE EXISTING PIPING, VALVES, LIFT STATION PUMPS, CONTROLS AND CONTROL WIRING/CONDUIT, AND ASSOCIATED COMPONENTS IN THE B433 LIFT STATION AND ADJACENT EQUIPMENT MANHOLE.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA4600 55 CONS PKP
NAICS237110 — Water and Sewer Line and Related Structures Construction
PSCZ2ND — REPAIR OR ALTERATION OF SEWAGE AND WASTE FACILITIES
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$228.1K
Current contract value$228.1K
Potential contract value / ceiling$228.1K
Start dateJan 27, 2026
Current end dateJun 19, 2026
Potential end dateJun 19, 2026
Latest award activityJun 3, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 3, 2026P00003$0THE CONTRACTOR SHALL REPLACE THE EXISTING PIPING, VALVES, LIFT STATION PUMPS, CONTROLS AND CONTROL WIRING/CONDUIT, AND ASSOCIATED COMPONENTS IN THE B433 LIFT STATION AND ADJACENT EQUIPMENT MANHOLE.
May 7, 2026P00002$8.2KTHE CONTRACTOR SHALL REPLACE THE EXISTING PIPING, VALVES, LIFT STATION PUMPS, CONTROLS AND CONTROL WIRING/CONDUIT, AND ASSOCIATED COMPONENTS IN THE B433 LIFT STATION AND ADJACENT EQUIPMENT MANHOLE.
Apr 30, 2026P00001$0THE CONTRACTOR SHALL REPLACE THE EXISTING PIPING, VALVES, LIFT STATION PUMPS, CONTROLS AND CONTROL WIRING/CONDUIT, AND ASSOCIATED COMPONENTS IN THE B433 LIFT STATION AND ADJACENT EQUIPMENT MANHOLE.
Jan 27, 20260$219.9KTHE CONTRACTOR SHALL REPLACE THE EXISTING PIPING, VALVES, LIFT STATION PUMPS, CONTROLS AND CONTROL WIRING/CONDUIT, AND ASSOCIATED COMPONENTS IN THE B433 LIFT STATION AND ADJACENT EQUIPMENT MANHOLE.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.