Federal contract award

FA461325F0012

PROVIDE TEMPORARY ENGINEERING SERVICES AT 90TH CIVIL ENGINEER SQUADRON IN SUPPORT OF THE SENTINEL MISSION THROUGHOUT THE SENTINEL BEDDOWN.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA4613 90 CONS PK
NAICS541512 — Computer Systems Design Services
PSCR499 — Other Professional Services
Parent award / vehicleGS35F320AA
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$897.1K
Current contract value$971.2K
Potential contract value / ceiling$3.2M
Start dateNov 19, 2024
Current end dateNov 17, 2026
Potential end dateNov 17, 2029
Latest award activityApr 16, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 16, 2026P00006$181.7KPROVIDE TEMPORARY ENGINEERING SERVICES AT 90TH CIVIL ENGINEER SQUADRON IN SUPPORT OF THE SENTINEL MISSION THROUGHOUT THE SENTINEL BEDDOWN.
Dec 18, 2025P00005$181.7KPROVIDE TEMPORARY ENGINEERING SERVICES AT 90TH CIVIL ENGINEER SQUADRON IN SUPPORT OF THE SENTINEL MISSION THROUGHOUT THE SENTINEL BEDDOWN.
Nov 14, 2025P00004$45.4KPROVIDE TEMPORARY ENGINEERING SERVICES AT 90TH CIVIL ENGINEER SQUADRON IN SUPPORT OF THE SENTINEL MISSION THROUGHOUT THE SENTINEL BEDDOWN.
Sep 9, 2025P00003$-220.4KPROVIDE TEMPORARY ENGINEERING SERVICES AT 90TH CIVIL ENGINEER SQUADRON IN SUPPORT OF THE SENTINEL MISSION THROUGHOUT THE SENTINEL BEDDOWN.
May 15, 2025P00002$323.2KPROVIDE TEMPORARY ENGINEERING SERVICES AT 90TH CIVIL ENGINEER SQUADRON IN SUPPORT OF THE SENTINEL MISSION THROUGHOUT THE SENTINEL BEDDOWN.
Nov 27, 2024P00001$0PROVIDE TEMPORARY ENGINEERING SERVICES AT 90TH CIVIL ENGINEER SQUADRON IN SUPPORT OF THE SENTINEL MISSION THROUGHOUT THE SENTINEL BEDDOWN.
Nov 19, 20240$323.2KPROVIDE TEMPORARY ENGINEERING SERVICES AT 90TH CIVIL ENGINEER SQUADRON IN SUPPORT OF THE SENTINEL MISSION THROUGHOUT THE SENTINEL BEDDOWN.

Estimated positioning window

Nov 17, 2028 – May 17, 2029

Recompete signal:
30/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 30/100. Available recorded signals: 25 points.

Contract end 2029-11-17 (1119 days from calculation)
+5 points
1 historical awards in this buyer and category group
+0 points
7 recorded award transactions
+10 points
Latest award action: 2026-04-16
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.