Federal contract award
FA466125P0064
ENGINEER, FURNISH, INSTALL AND TEST (EFIT) INSIDE PLANT (ISP) FIBER OPTIC CABLE FOR BLDG. 7312, NETWORK SWITCHES CATALYST C9300 FIBER SWITCHES, AND ASSOCIATED TERMINATION EQUIPMENT, CONDUITS TO CONNECT EXISTING MAINTENANCE HOLE/CONDUIT SYSTEM.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | FA4661 7 CONS CD |
| NAICS | 334210 — Telephone Apparatus Manufacturing |
| PSC | N059 — Installation of Equipment: Electrical and Electronic Equipment Components |
| Parent award / vehicle | Not reported |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $306.9K |
| Current contract value | $306.9K |
| Potential contract value / ceiling | $306.9K |
| Start date | Jul 18, 2025 |
| Current end date | Nov 21, 2025 |
| Potential end date | Nov 21, 2025 |
| Latest award activity | Nov 12, 2025 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Nov 12, 2025 | P00002 | $-129.9K | ENGINEER, FURNISH, INSTALL AND TEST (EFIT) INSIDE PLANT (ISP) FIBER OPTIC CABLE FOR BLDG. 7312, NETWORK SWITCHES CATALYST C9300 FIBER SWITCHES, AND ASSOCIATED TERMINATION EQUIPMENT, CONDUITS TO CONNECT EXISTING MAINTENANCE HOLE/CONDUIT SYSTEM. |
| Oct 22, 2025 | P00001 | $0 | ENGINEER, FURNISH, INSTALL AND TEST (EFIT) INSIDE PLANT (ISP) FIBER OPTIC CABLE FOR BLDG. 7312, NETWORK SWITCHES CATALYST C9300 FIBER SWITCHES, AND ASSOCIATED TERMINATION EQUIPMENT, CONDUITS TO CONNECT EXISTING MAINTENANCE HOLE/CONDUIT SYSTEM. |
| Jul 22, 2025 | 0 | $436.8K | ENGINEER, FURNISH, INSTALL AND TEST (EFIT) INSIDE PLANT (ISP) FIBER OPTIC CABLE FOR BLDG. 7312, NETWORK SWITCHES CATALYST C9300 FIBER SWITCHES, AND ASSOCIATED TERMINATION EQUIPMENT, CONDUITS TO CONNECT EXISTING MAINTENANCE HOLE/CONDUIT SYSTEM. |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.