Federal contract award
FA466425C0007
THE CONTRACTOR SHALL PROVIDE DESIGN-BUILD SERVICES TO THE 452D CIVIL ENGINEER SQUADRON (CES) AT MARCH AIR RESERVE BASE (MARB), CALIFORNIA FOR PROJECT PDPG250111, ADD SPLIT HVAC SYSTEMS AT B395.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | FA4664 452 MSG PK |
| NAICS | 238220 — Plumbing, Heating, and Air-Conditioning Contractors |
| PSC | J045 — Maintenance, Repair and Rebuilding of Equipment: Plumbing, Heating, and Waste Disposal Equipment |
| Parent award / vehicle | Not reported |
| Set-aside | 8(A) SOLE SOURCE |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $315.1K |
| Current contract value | $315.1K |
| Potential contract value / ceiling | $315.1K |
| Start date | Sep 22, 2025 |
| Current end date | Jul 18, 2026 |
| Potential end date | Jul 18, 2026 |
| Latest award activity | May 26, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 26, 2026 | P00002 | $0 | THE CONTRACTOR SHALL PROVIDE DESIGN-BUILD SERVICES TO THE 452D CIVIL ENGINEER SQUADRON (CES) AT MARCH AIR RESERVE BASE (MARB), CALIFORNIA FOR PROJECT PDPG250111, ADD SPLIT HVAC SYSTEMS AT B395. |
| Mar 27, 2026 | P00001 | $0 | THE CONTRACTOR SHALL PROVIDE DESIGN-BUILD SERVICES TO THE 452D CIVIL ENGINEER SQUADRON (CES) AT MARCH AIR RESERVE BASE (MARB), CALIFORNIA FOR PROJECT PDPG250111, ADD SPLIT HVAC SYSTEMS AT B395. |
| Sep 22, 2025 | 0 | $315.1K | THE CONTRACTOR SHALL PROVIDE DESIGN-BUILD SERVICES TO THE 452D CIVIL ENGINEER SQUADRON (CES) AT MARCH AIR RESERVE BASE (MARB), CALIFORNIA FOR PROJECT PDPG250111, ADD SPLIT HVAC SYSTEMS AT B395. |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.