Federal contract award

FA480125P0022

TRAFFIC LIGHTING REPAIR, GOLDFEIN AV - WT #15692413 REMOVE AND DISPOSE THE EXISTING TRAFFIC CONTROL CABINETS AND WIRING. INSTALL ALL NEW WIRING FROM THE NEW CABINETS TO THE SIGNAL HEADS, CAMERAS, AND PEDESTRIAN BUTTONS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA4801 49 CONS PK
NAICS238210 — Electrical Contractors and Other Wiring Installation Contractors
PSCN059 — Installation of Equipment: Electrical and Electronic Equipment Components
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$148.8K
Current contract value$148.8K
Potential contract value / ceiling$148.8K
Start dateMar 31, 2025
Current end dateDec 15, 2025
Potential end dateDec 15, 2025
Latest award activityNov 24, 2025
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Nov 24, 2025P00003$0TRAFFIC LIGHTING REPAIR, GOLDFEIN AV - WT #15692413 REMOVE AND DISPOSE THE EXISTING TRAFFIC CONTROL CABINETS AND WIRING. INSTALL ALL NEW WIRING FROM THE NEW CABINETS TO THE SIGNAL HEADS, CAMERAS, AND PEDESTRIAN BUTTONS.
Oct 21, 2025P00002$0TRAFFIC LIGHTING REPAIR, GOLDFEIN AV - WT #15692413 REMOVE AND DISPOSE THE EXISTING TRAFFIC CONTROL CABINETS AND WIRING. INSTALL ALL NEW WIRING FROM THE NEW CABINETS TO THE SIGNAL HEADS, CAMERAS, AND PEDESTRIAN BUTTONS.
Sep 18, 2025P00001$0TRAFFIC LIGHTING REPAIR, GOLDFEIN AV - WT #15692413 REMOVE AND DISPOSE THE EXISTING TRAFFIC CONTROL CABINETS AND WIRING. INSTALL ALL NEW WIRING FROM THE NEW CABINETS TO THE SIGNAL HEADS, CAMERAS, AND PEDESTRIAN BUTTONS.
Apr 3, 20250$148.8KTRAFFIC LIGHTING REPAIR, GOLDFEIN AV - WT #15692413 REMOVE AND DISPOSE THE EXISTING TRAFFIC CONTROL CABINETS AND WIRING. INSTALL ALL NEW WIRING FROM THE NEW CABINETS TO THE SIGNAL HEADS, CAMERAS, AND PEDESTRIAN BUTTONS.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.