Federal contract award

FA480324C0041

THE PURPOSE OF THIS REQUIREMENT IS TO DESIGN AND REPLACE THE EXISTING ROOF ON BUILDING 1832 AND ACCOMPLISH OTHER SPECIFIED TASK IN ACCORDANCE WITH THE (REVISED) STATEMENT OF WORK DATED 25 SEPTEMBER 2024 AND CORRESPONDING DRAWINGS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA4803 20 CONS LGCA
NAICS236220 — Commercial and Institutional Building Construction
PSCZ2JZ — REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
Parent award / vehicleNot reported
Set-aside8(A) SOLE SOURCE
Pricing typeFIRM FIXED PRICE
Obligations$749.0K
Current contract value$749.0K
Potential contract value / ceiling$749.0K
Start dateNov 4, 2024
Current end dateMay 13, 2026
Potential end dateMay 13, 2026
Latest award activityApr 30, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 30, 2026P00003$0THE PURPOSE OF THIS REQUIREMENT IS TO DESIGN AND REPLACE THE EXISTING ROOF ON BUILDING 1832 AND ACCOMPLISH OTHER SPECIFIED TASK IN ACCORDANCE WITH THE (REVISED) STATEMENT OF WORK DATED 25 SEPTEMBER 2024 AND CORRESPONDING DRAWINGS.
Mar 27, 2026P00002$0THE PURPOSE OF THIS REQUIREMENT IS TO DESIGN AND REPLACE THE EXISTING ROOF ON BUILDING 1832 AND ACCOMPLISH OTHER SPECIFIED TASK IN ACCORDANCE WITH THE (REVISED) STATEMENT OF WORK DATED 25 SEPTEMBER 2024 AND CORRESPONDING DRAWINGS.
Oct 16, 2024P00001$0THE PURPOSE OF THIS REQUIREMENT IS TO DESIGN AND REPLACE THE EXISTING ROOF ON BUILDING 1832 AND ACCOMPLISH OTHER SPECIFIED TASK IN ACCORDANCE WITH THE (REVISED) STATEMENT OF WORK DATED 25 SEPTEMBER 2024 AND CORRESPONDING DRAWINGS.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.