Federal contract award
FA485523C0010
REPLACE HVAC AT BLDG 22 LOCATED ON CANNON AFB, NM
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | FA4855 27 SOCONS LGC |
| NAICS | 238220 — Plumbing, Heating, and Air-Conditioning Contractors |
| PSC | Z2AA — REPAIR OR ALTERATION OF OFFICE BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | 8(A) SOLE SOURCE |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $2.0M |
| Current contract value | $2.0M |
| Potential contract value / ceiling | $2.0M |
| Start date | Aug 7, 2023 |
| Current end date | Jun 1, 2026 |
| Potential end date | Jun 1, 2026 |
| Latest award activity | May 29, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 29, 2026 | P00006 | $0 | THE SCOPE OF WORK INCLUDES A DESIGN-BUILD EFFORT FOR THE REPAIR-BY-REPLACEMENT OF MULTIPLE HVAC AND ELECTRICAL COMPONENTS AT B22, AIRCRAFT MAINTENANCE FABRICATION FACILITY, CANNON AFB. STAMPED AND SEALED, ISSUED FOR CONSTRUCTION DRAWINGS FOR ALL WORK |
| Apr 17, 2025 | P00005 | $0 | THE SCOPE OF WORK INCLUDES A DESIGN-BUILD EFFORT FOR THE REPAIR-BY-REPLACEMENT OF MULTIPLE HVAC AND ELECTRICAL COMPONENTS AT B22, AIRCRAFT MAINTENANCE FABRICATION FACILITY, CANNON AFB. STAMPED AND SEALED, ISSUED FOR CONSTRUCTION DRAWINGS FOR ALL WORK |
| Mar 12, 2025 | P00004 | $0 | THE SCOPE OF WORK INCLUDES A DESIGN-BUILD EFFORT FOR THE REPAIR-BY-REPLACEMENT OF MULTIPLE HVAC AND ELECTRICAL COMPONENTS AT B22, AIRCRAFT MAINTENANCE FABRICATION FACILITY, CANNON AFB. STAMPED AND SEALED, ISSUED FOR CONSTRUCTION DRAWINGS FOR ALL WORK |
| Jun 24, 2024 | P00003 | $0 | THE SCOPE OF WORK INCLUDES A DESIGN-BUILD EFFORT FOR THE REPAIR-BY-REPLACEMENT OF MULTIPLE HVAC AND ELECTRICAL COMPONENTS AT B22, AIRCRAFT MAINTENANCE FABRICATION FACILITY, CANNON AFB. STAMPED AND SEALED, ISSUED FOR CONSTRUCTION DRAWINGS FOR ALL WORK |
| Apr 10, 2024 | P00002 | $0 | THE SCOPE OF WORK INCLUDES A DESIGN-BUILD EFFORT FOR THE REPAIR-BY-REPLACEMENT OF MULTIPLE HVAC AND ELECTRICAL COMPONENTS AT B22, AIRCRAFT MAINTENANCE FABRICATION FACILITY, CANNON AFB. STAMPED AND SEALED, ISSUED FOR CONSTRUCTION DRAWINGS FOR ALL WORK |
| Nov 27, 2023 | P00001 | $0 | PERIOD OF PERFORMANCE ADJUSTMENT. |
| Jul 21, 2023 | 0 | $2.0M | REPLACE HVAC AT BLDG 22 LOCATED ON CANNON AFB, NM |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.