Federal contract award
FA485524C0011
DESIGN-BUILD PROJECT TO RENOVATE BUILDING 106. WORK SHALL CONFORM TO CONTRACT DOCUMENTS, SPECIFICATIONS AND FEDERAL, STATE, AND LOCAL REQUIREMENTS IN ACCORDANCE WITH STATEMENT OF OBJECTIVES RENOVATE B106 DATED 01 MAR 24.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | FA4855 27 SOCONS LGC |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | C219 — Other Architect and Engineering Services |
| Parent award / vehicle | Not reported |
| Set-aside | 8(A) SOLE SOURCE |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $891.9K |
| Current contract value | $891.9K |
| Potential contract value / ceiling | $891.9K |
| Start date | Aug 21, 2024 |
| Current end date | Dec 28, 2026 |
| Potential end date | Dec 28, 2026 |
| Latest award activity | May 6, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 6, 2026 | P00007 | $59.5K | DESIGN-BUILD PROJECT TO RENOVATE BUILDING 106. WORK SHALL CONFORM TO CONTRACT DOCUMENTS, SPECIFICATIONS AND FEDERAL, STATE, AND LOCAL REQUIREMENTS IN ACCORDANCE WITH STATEMENT OF OBJECTIVES RENOVATE B106 DATED 01 MAR 24. |
| Jan 26, 2026 | P00005 | $0 | DESIGN-BUILD PROJECT TO RENOVATE BUILDING 106. WORK SHALL CONFORM TO CONTRACT DOCUMENTS, SPECIFICATIONS AND FEDERAL, STATE, AND LOCAL REQUIREMENTS IN ACCORDANCE WITH STATEMENT OF OBJECTIVES RENOVATE B106 DATED 01 MAR 24. |
| Oct 16, 2025 | P00004 | $0 | DESIGN-BUILD PROJECT TO RENOVATE BUILDING 106. WORK SHALL CONFORM TO CONTRACT DOCUMENTS, SPECIFICATIONS AND FEDERAL, STATE, AND LOCAL REQUIREMENTS IN ACCORDANCE WITH STATEMENT OF OBJECTIVES RENOVATE B106 DATED 01 MAR 24. |
| Jun 26, 2025 | P00003 | $0 | DESIGN-BUILD PROJECT TO RENOVATE BUILDING 106. WORK SHALL CONFORM TO CONTRACT DOCUMENTS, SPECIFICATIONS AND FEDERAL, STATE, AND LOCAL REQUIREMENTS IN ACCORDANCE WITH STATEMENT OF OBJECTIVES RENOVATE B106 DATED 01 MAR 24. |
| Mar 12, 2025 | P00002 | $0 | DESIGN-BUILD PROJECT TO RENOVATE BUILDING 106. WORK SHALL CONFORM TO CONTRACT DOCUMENTS, SPECIFICATIONS AND FEDERAL, STATE, AND LOCAL REQUIREMENTS IN ACCORDANCE WITH STATEMENT OF OBJECTIVES RENOVATE B106 DATED 01 MAR 24. |
| Jan 8, 2025 | P00001 | $0 | DESIGN-BUILD PROJECT TO RENOVATE BUILDING 106. WORK SHALL CONFORM TO CONTRACT DOCUMENTS, SPECIFICATIONS AND FEDERAL, STATE, AND LOCAL REQUIREMENTS IN ACCORDANCE WITH STATEMENT OF OBJECTIVES RENOVATE B106 DATED 01 MAR 24. |
| Aug 15, 2024 | 0 | $832.4K | DESIGN-BUILD PROJECT TO RENOVATE BUILDING 106. WORK SHALL CONFORM TO CONTRACT DOCUMENTS, SPECIFICATIONS AND FEDERAL, STATE, AND LOCAL REQUIREMENTS IN ACCORDANCE WITH STATEMENT OF OBJECTIVES RENOVATE B106 DATED 01 MAR 24. |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2026-12-28 (64 days from calculation)
- +35 points
- 1 historical awards in this buyer and category group
- +0 points
- 7 recorded award transactions
- +10 points
- Latest award action: 2026-05-06
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.