Federal contract award

FA485525C0018

THIS PROJECT INCLUDES BUT IS NOT LIMITED TO REPLACING THE EXISTING GRASS WITH A NEW SYNTHETIC TURF SYSTEM AT TWO SOFTBALL FIELDS ON CANNON AFB. INSTALL A NEW REGULATION SOFTBALL FIELD TURF SYSTEM (APPROX. 85,500 SF PER FIELD).

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA4855 27 SOCONS LGC
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCZ2PA — REPAIR OR ALTERATION OF RECREATION FACILITIES (NON-BUILDING)
Parent award / vehicleNot reported
Set-aside8(A) SOLE SOURCE
Pricing typeFIRM FIXED PRICE
Obligations$2.7M
Current contract value$2.7M
Potential contract value / ceiling$2.7M
Start dateOct 1, 2025
Current end dateJul 31, 2026
Potential end dateJul 31, 2026
Latest award activityJun 2, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 8 of 8 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 2, 2026P00007$0THIS PROJECT INCLUDES BUT IS NOT LIMITED TO REPLACING THE EXISTING GRASS WITH A NEW SYNTHETIC TURF SYSTEM AT TWO SOFTBALL FIELDS ON CANNON AFB. INSTALL A NEW REGULATION SOFTBALL FIELD TURF SYSTEM (APPROX. 85,500 SF PER FIELD).
May 20, 2026P00006$0THIS PROJECT INCLUDES BUT IS NOT LIMITED TO REPLACING THE EXISTING GRASS WITH A NEW SYNTHETIC TURF SYSTEM AT TWO SOFTBALL FIELDS ON CANNON AFB. INSTALL A NEW REGULATION SOFTBALL FIELD TURF SYSTEM (APPROX. 85,500 SF PER FIELD).
May 18, 2026P00005$0THIS PROJECT INCLUDES BUT IS NOT LIMITED TO REPLACING THE EXISTING GRASS WITH A NEW SYNTHETIC TURF SYSTEM AT TWO SOFTBALL FIELDS ON CANNON AFB. INSTALL A NEW REGULATION SOFTBALL FIELD TURF SYSTEM (APPROX. 85,500 SF PER FIELD).
May 15, 2026P00004$0THIS PROJECT INCLUDES BUT IS NOT LIMITED TO REPLACING THE EXISTING GRASS WITH A NEW SYNTHETIC TURF SYSTEM AT TWO SOFTBALL FIELDS ON CANNON AFB. INSTALL A NEW REGULATION SOFTBALL FIELD TURF SYSTEM (APPROX. 85,500 SF PER FIELD).
May 7, 2026P00003$0THIS PROJECT INCLUDES BUT IS NOT LIMITED TO REPLACING THE EXISTING GRASS WITH A NEW SYNTHETIC TURF SYSTEM AT TWO SOFTBALL FIELDS ON CANNON AFB. INSTALL A NEW REGULATION SOFTBALL FIELD TURF SYSTEM (APPROX. 85,500 SF PER FIELD).
Apr 27, 2026P00002$1.3MTHIS PROJECT INCLUDES BUT IS NOT LIMITED TO REPLACING THE EXISTING GRASS WITH A NEW SYNTHETIC TURF SYSTEM AT TWO SOFTBALL FIELDS ON CANNON AFB. INSTALL A NEW REGULATION SOFTBALL FIELD TURF SYSTEM (APPROX. 85,500 SF PER FIELD).
Oct 14, 2025P00001$0THIS PROJECT INCLUDES BUT IS NOT LIMITED TO REPLACING THE EXISTING GRASS WITH A NEW SYNTHETIC TURF SYSTEM AT TWO SOFTBALL FIELDS ON CANNON AFB. INSTALL A NEW REGULATION SOFTBALL FIELD TURF SYSTEM (APPROX. 85,500 SF PER FIELD).
Sep 30, 20250$1.5MTHIS PROJECT INCLUDES BUT IS NOT LIMITED TO REPLACING THE EXISTING GRASS WITH A NEW SYNTHETIC TURF SYSTEM AT TWO SOFTBALL FIELDS ON CANNON AFB. INSTALL A NEW REGULATION SOFTBALL FIELD TURF SYSTEM (APPROX. 85,500 SF PER FIELD).

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.