Federal contract award

FA486123F0296

A/E REQUIREMENT TO DEVELOP AND PROVIDE A 15% FACILITY SUSTAINMENT, RESTORATION, MODERNIZATION (FSRM) PLANNING CHARRETTE REPORT (PCR) TO REPAIR THE INSTALLATION ACCESS CONTROL POINT (IACP), THE LARGE VEHICLE INSPECTION FACILITY

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA4861 99 CONS LGC
NAICS541330 — Engineering Services
PSCC211 — Architect - Engineer Services (including landscaping, interior layout, and designing)
Parent award / vehicleFA486122D0004
Set-asideSMALL BUSINESS SET ASIDE - PARTIAL
Pricing typeFIRM FIXED PRICE
Obligations$384.1K
Current contract value$384.1K
Potential contract value / ceiling$384.1K
Start dateAug 1, 2023
Current end dateJan 30, 2026
Potential end dateJan 30, 2026
Latest award activityDec 17, 2025
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Dec 17, 2025P00004$0THIS IS AN A/E REQUIREMENT TO DEVELOP AND PROVIDE A 15% FACILITY SUSTAINMENT, RESTORATION, MODERNIZATION (FSRM) PLANNING CHARRETTE REPORT (PCR) TO REPAIR THE INSTALLATION ACCESS CONTROL POINT (IACP), THE LARGE VEHICLE INSPECTION FACILITY (LVIF), AND
Jul 22, 2025P00002$0THIS IS AN A/E REQUIREMENT TO DEVELOP AND PROVIDE A 15% FACILITY SUSTAINMENT, RESTORATION, MODERNIZATION (FSRM) PLANNING CHARRETTE REPORT (PCR) TO REPAIR THE INSTALLATION ACCESS CONTROL POINT (IACP), THE LARGE VEHICLE INSPECTION FACILITY (LVIF), AND
Apr 21, 2025P00001$0THIS IS AN A/E REQUIREMENT TO DEVELOP AND PROVIDE A 15% FACILITY SUSTAINMENT, RESTORATION, MODERNIZATION (FSRM) PLANNING CHARRETTE REPORT (PCR) TO REPAIR THE INSTALLATION ACCESS CONTROL POINT (IACP), THE LARGE VEHICLE INSPECTION FACILITY (LVIF), AND

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.