Federal contract award

FA489725C0004

REPAIR DESERT STREET, PHASES 5 TO 8, IN ACCORDANCE WITH THE SCOPE OF WORK, SPECIFICATIONS, AND DRAWINGS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA4897 366 CONS PKP
NAICS237310 — Highway, Street, and Bridge Construction
PSCZ2LB — REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$4.1M
Current contract value$4.1M
Potential contract value / ceiling$4.1M
Start dateJul 28, 2025
Current end dateJul 15, 2026
Potential end dateJul 15, 2026
Latest award activityJun 1, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 8 of 8 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 1, 2026P00007$50.6KREPAIR DESERT STREET,PHASES 5 TO 8, IAW THE SCOPE OF WORK, SPECIFICATIONS, AND DRAWINGS. THE PURPOSE OF THIS MOD IS TO ADD $50,557 AND 26 WORKING DAYS TO THE POP TO FOR THE ADDITION/CHANGES TO CATCH BASIN, SEEPAGE BED, SIDEWALK, PED RAMPS AND GUTTER.
Mar 25, 2026P00006$0PERIOD OF PERFORMANCE EXTENSION CONTRACTING OFFICER EMAIL: YAN.HAMPP@US.AF.MIL PURSUANT TO FAR 52.243-4(C), CONTRACT FA489725C0004 IS HEREBY MODIFIED TO ADD 50 DAYS TO THE PERIOD OF PERFORMANCE BOTH ARE NO COST TO THE GOVERNMENT.
Jan 8, 2026P00005$50.6KREPAIR DESERT STREET, PHASES 5 TO 8, IN ACCORDANCE WITH THE SCOPE OF WORK, SPECIFICATIONS, AND DRAWINGS.
Oct 9, 2025P00004$0REPAIR DESERT STREET, PHASES 5 TO 8, IN ACCORDANCE WITH THE SCOPE OF WORK, SPECIFICATIONS, AND DRAWINGS.
Sep 30, 2025P00003$608.7KREPAIR DESERT STREET, PHASES 5 TO 8, IN ACCORDANCE WITH THE SCOPE OF WORK, SPECIFICATIONS, AND DRAWINGS.
Aug 27, 2025P00002$1.2MREPAIR DESERT STREET, PHASES 5 TO 8, IN ACCORDANCE WITH THE SCOPE OF WORK, SPECIFICATIONS, AND DRAWINGS.
Jul 14, 2025P00001$0REPAIR DESERT STREET, PHASES 5 TO 8, IN ACCORDANCE WITH THE SCOPE OF WORK, SPECIFICATIONS, AND DRAWINGS.
Jun 27, 20250$2.2MREPAIR DESERT STREET, PHASES 5 TO 8, IN ACCORDANCE WITH THE SCOPE OF WORK, SPECIFICATIONS, AND DRAWINGS.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.