Federal contract award

FA491125C0006

THE CONTRACTOR SHALL PROVIDE ALL ENGINEERING, SUPERVISION, LABOR, MATERIALS, EQUIPMENT, TOOLS, SUPPLIES AND INCIDENTALS REQUIRED TO DESIGN, BUILD, INSTALL, AND COMMISSION ONE (1) STEM-WALLED PEB (PRE-ENGINEERED BUILDING) FOR PSAB.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA4911 378 ECONS
NAICS236220 — Commercial and Institutional Building Construction
PSCY1AZ — CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$1.6M
Current contract value$1.6M
Potential contract value / ceiling$1.6M
Start dateMar 3, 2025
Current end dateSep 30, 2026
Potential end dateSep 30, 2026
Latest award activityFeb 10, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Feb 10, 2026P00003$0THE CONTRACTOR SHALL PROVIDE ALL ENGINEERING, SUPERVISION, LABOR, MATERIALS, EQUIPMENT, TOOLS, SUPPLIES AND INCIDENTALS REQUIRED TO DESIGN, BUILD, INSTALL, AND COMMISSION ONE (1) STEM-WALLED PEB (PRE-ENGINEERED BUILDING) FOR PSAB.
Dec 30, 2025P00002$0THE CONTRACTOR SHALL PROVIDE ALL ENGINEERING, SUPERVISION, LABOR, MATERIALS, EQUIPMENT, TOOLS, SUPPLIES AND INCIDENTALS REQUIRED TO DESIGN, BUILD, INSTALL, AND COMMISSION ONE (1) STEM-WALLED PEB (PRE-ENGINEERED BUILDING) FOR PSAB.
Aug 13, 2025P00001$-41.3KTHE CONTRACTOR SHALL PROVIDE ALL ENGINEERING, SUPERVISION, LABOR, MATERIALS, EQUIPMENT, TOOLS, SUPPLIES AND INCIDENTALS REQUIRED TO DESIGN, BUILD, INSTALL, AND COMMISSION ONE (1) STEM-WALLED PEB (PRE-ENGINEERED BUILDING) FOR PSAB.
Feb 25, 20250$1.6MTHE CONTRACTOR SHALL PROVIDE ALL ENGINEERING, SUPERVISION, LABOR, MATERIALS, EQUIPMENT, TOOLS, SUPPLIES AND INCIDENTALS REQUIRED TO DESIGN, BUILD, INSTALL, AND COMMISSION ONE (1) STEM-WALLED PEB (PRE-ENGINEERED BUILDING) FOR PSAB.