Federal contract award

FA491125P0069

THE CONTRACTOR SHALL PROVIDE ALL NEEDED PARTICULARS REQUIRED TO DESIGN FOR DEMOLITION OF FAILED CULVERT SYSTEM, RE-BUILDING AND INSTALL OF NEW CULVERT SYSTEM, AND ASSOCIATED PAVEMENT STRUCTURE ON TAXIWAY S2 AT PRINCE SULTAN AIR BASE (PSAB), KSA.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA4911 378 ECONS
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCZ2LB — REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$243.2K
Current contract value$243.2K
Potential contract value / ceiling$243.2K
Start dateMay 30, 2025
Current end dateDec 6, 2025
Potential end dateDec 6, 2025
Latest award activityNov 20, 2025
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Nov 20, 2025P00003$0THE CONTRACTOR SHALL PROVIDE ALL NEEDED PARTICULARS REQUIRED TO DESIGN FOR DEMOLITION OF FAILED CULVERT SYSTEM, RE-BUILDING AND INSTALL OF NEW CULVERT SYSTEM, AND ASSOCIATED PAVEMENT STRUCTURE ON TAXIWAY S2 AT PRINCE SULTAN AIR BASE (PSAB), KSA.
Oct 24, 2025P00002$0THE CONTRACTOR SHALL PROVIDE ALL NEEDED PARTICULARS REQUIRED TO DESIGN FOR DEMOLITION OF FAILED CULVERT SYSTEM, RE-BUILDING AND INSTALL OF NEW CULVERT SYSTEM, AND ASSOCIATED PAVEMENT STRUCTURE ON TAXIWAY S2 AT PRINCE SULTAN AIR BASE (PSAB), KSA.
May 21, 20250$243.2KTHE CONTRACTOR SHALL PROVIDE ALL NEEDED PARTICULARS REQUIRED TO DESIGN FOR DEMOLITION OF FAILED CULVERT SYSTEM, RE-BUILDING AND INSTALL OF NEW CULVERT SYSTEM, AND ASSOCIATED PAVEMENT STRUCTURE ON TAXIWAY S2 AT PRINCE SULTAN AIR BASE (PSAB), KSA.