Federal contract award

FA524025P0009

A PORTABLE CONTAINER USED TO MANUFACTURE OR REPAIR HYDRAULIC HOSES/LINES. MUST HAVE ELECTRIC CAPABILITIES, HYDRAULIC CRIMPERS, HYDRAULIC HOSE CUTTING CAPABILITIES, HOSE RACKS TO STORE HYDRAULIC HOSES, AND BINS TO STORE ALL THE HYDRAULIC FITTINGS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA5240 36 CONS LGC
NAICS332439 — Other Metal Container Manufacturing
PSC8145 — Specialized Shipping and Storage Containers
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$27.9K
Current contract value$27.9K
Potential contract value / ceiling$27.9K
Start dateDec 3, 2024
Current end dateMay 12, 2025
Potential end dateMay 12, 2025
Latest award activityMay 11, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 11, 2025P00002$0A PORTABLE CONTAINER USED TO MANUFACTURE OR REPAIR HYDRAULIC HOSES/LINES. MUST HAVE ELECTRIC CAPABILITIES, HYDRAULIC CRIMPERS, HYDRAULIC HOSE CUTTING CAPABILITIES, HOSE RACKS TO STORE HYDRAULIC HOSES, AND BINS TO STORE ALL THE HYDRAULIC FITTINGS.
Apr 10, 2025P00001$-1.0KA PORTABLE CONTAINER USED TO MANUFACTURE OR REPAIR HYDRAULIC HOSES/LINES. MUST HAVE ELECTRIC CAPABILITIES, HYDRAULIC CRIMPERS, HYDRAULIC HOSE CUTTING CAPABILITIES, HOSE RACKS TO STORE HYDRAULIC HOSES, AND BINS TO STORE ALL THE HYDRAULIC FITTINGS.
Dec 9, 20240$28.9KA PORTABLE CONTAINER USED TO MANUFACTURE OR REPAIR HYDRAULIC HOSES/LINES. MUST HAVE ELECTRIC CAPABILITIES, HYDRAULIC CRIMPERS, HYDRAULIC HOSE CUTTING CAPABILITIES, HOSE RACKS TO STORE HYDRAULIC HOSES, AND BINS TO STORE ALL THE HYDRAULIC FITTINGS.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.