Federal contract award

FA542225C0017

DESIGN/BUILD HAZMAT STORAGE IAW SOW. INCLUDES CONCRETE SLAB, STEEL COVER, FENCING. STRICT ADHERENCE TO UNIFIED FACILITIES CRITERIA. CONTRACTOR MANAGES ALL: MATERIALS, SITE WORK, QC, SAFETY. GOVT OVERSIGHT AS-BUILT DRAWINGS AND WARRANTY REQUIRED.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA5422 406 AEW CONS
NAICS238990 — All Other Specialty Trade Contractors
PSCY1PZ — CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$236.8K
Current contract value$236.8K
Potential contract value / ceiling$236.8K
Start dateAug 26, 2025
Current end dateMay 11, 2026
Potential end dateMay 11, 2026
Latest award activityDec 12, 2025
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Dec 12, 2025P00002$0DESIGN/BUILD HAZMAT STORAGE IAW SOW. INCLUDES CONCRETE SLAB, STEEL COVER, FENCING. STRICT ADHERENCE TO UNIFIED FACILITIES CRITERIA. CONTRACTOR MANAGES ALL: MATERIALS, SITE WORK, QC, SAFETY. GOVT OVERSIGHT; AS-BUILT DRAWINGS AND WARRANTY REQUIRED.
Dec 11, 2025P00001$0DESIGN/BUILD HAZMAT STORAGE IAW SOW. INCLUDES CONCRETE SLAB, STEEL COVER, FENCING. STRICT ADHERENCE TO UNIFIED FACILITIES CRITERIA. CONTRACTOR MANAGES ALL: MATERIALS, SITE WORK, QC, SAFETY. GOVT OVERSIGHT; AS-BUILT DRAWINGS AND WARRANTY REQUIRED.
Aug 26, 20250$236.8KDESIGN/BUILD HAZMAT STORAGE IAW SOW. INCLUDES CONCRETE SLAB, STEEL COVER, FENCING. STRICT ADHERENCE TO UNIFIED FACILITIES CRITERIA. CONTRACTOR MANAGES ALL: MATERIALS, SITE WORK, QC, SAFETY. GOVT OVERSIGHT AS-BUILT DRAWINGS AND WARRANTY REQUIRED.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.