Federal contract award

FA557024C0004

CONTRACTOR TO ENGINEER, FURNISH, INSTALL, TEST AND PLACE INTO FULL SERVICE AN INTEGRATED COMMAND AND CONTROL DISPATCH SYSTEM AT THE RAF FAIRFORD COMMAND POST WITH THE LATEST GEO-DIVERSE/GEO-REDUNDANT IP-BASED DISPATCH SYSTEM.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA5570 501 CSW RCO
NAICS541512 — Computer Systems Design Services
PSC5830 — Intercommunication and Public Address Systems, Except Airborne
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$501.6K
Current contract value$501.6K
Potential contract value / ceiling$501.6K
Start dateOct 1, 2024
Current end dateAug 31, 2026
Potential end dateAug 31, 2026
Latest award activityApr 13, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 13, 2026P00006$0CONTRACTOR TO ENGINEER, FURNISH, INSTALL, TEST AND PLACE INTO FULL SERVICE AN INTEGRATED COMMAND AND CONTROL DISPATCH SYSTEM AT THE RAF FAIRFORD COMMAND POST WITH THE LATEST GEO-DIVERSE/GEO-REDUNDANT IP-BASED DISPATCH SYSTEM.
Oct 23, 2025P00005$0CONTRACTOR TO ENGINEER, FURNISH, INSTALL, TEST AND PLACE INTO FULL SERVICE AN INTEGRATED COMMAND AND CONTROL DISPATCH SYSTEM AT THE RAF FAIRFORD COMMAND POST WITH THE LATEST GEO-DIVERSE/GEO-REDUNDANT IP-BASED DISPATCH SYSTEM.
Aug 5, 2025P00004$0CONTRACTOR TO ENGINEER, FURNISH, INSTALL, TEST AND PLACE INTO FULL SERVICE AN INTEGRATED COMMAND AND CONTROL DISPATCH SYSTEM AT THE RAF FAIRFORD COMMAND POST WITH THE LATEST GEO-DIVERSE/GEO-REDUNDANT IP-BASED DISPATCH SYSTEM.
Jun 19, 2025P00003$30.2KCONTRACTOR TO ENGINEER, FURNISH, INSTALL, TEST AND PLACE INTO FULL SERVICE AN INTEGRATED COMMAND AND CONTROL DISPATCH SYSTEM AT THE RAF FAIRFORD COMMAND POST WITH THE LATEST GEO-DIVERSE/GEO-REDUNDANT IP-BASED DISPATCH SYSTEM.
Feb 7, 2025P00002$0CONTRACTOR TO ENGINEER, FURNISH, INSTALL, TEST AND PLACE INTO FULL SERVICE AN INTEGRATED COMMAND AND CONTROL DISPATCH SYSTEM AT THE RAF FAIRFORD COMMAND POST WITH THE LATEST GEO-DIVERSE/GEO-REDUNDANT IP-BASED DISPATCH SYSTEM.
Sep 26, 2024P00001$135.4KCONTRACTOR TO ENGINEER, FURNISH, INSTALL, TEST AND PLACE INTO FULL SERVICE AN INTEGRATED COMMAND AND CONTROL DISPATCH SYSTEM AT THE RAF FAIRFORD COMMAND POST WITH THE LATEST GEO-DIVERSE/GEO-REDUNDANT IP-BASED DISPATCH SYSTEM.
Sep 3, 20240$336.0KCONTRACTOR TO ENGINEER, FURNISH, INSTALL, TEST AND PLACE INTO FULL SERVICE AN INTEGRATED COMMAND AND CONTROL DISPATCH SYSTEM AT THE RAF FAIRFORD COMMAND POST WITH THE LATEST GEO-DIVERSE/GEO-REDUNDANT IP-BASED DISPATCH SYSTEM.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.