Federal contract award

FA561323P0129

FIBER INSTALLATION

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA5613 700 CONS PK
NAICS335921 — Fiber Optic Cable Manufacturing
PSC7G21 — Digital network communications hardware, software, and other equipment used within the core data centers and work areas, connecting end users to the organization's Local Area Network (LAN). Wide Area Network (WAN) digital transmission equipment, supporting hardware and software directly connecting data centers, offices and third parties. Includes 1) external digital network transport equipment (Outside Plant) physical communications infrastructure connecting to LAN/WAN end points 2) copper and fiber communications systems, and 3) cellular infrastructure such as towers, repeaters, switching systems dedicated for cellular communication. Products and tools that enable or distribute voice services through on-premise digital equipment including PBX, VoIP, voicemail and handsets.
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$246.7K
Current contract value$246.7K
Potential contract value / ceiling$246.7K
Start dateSep 15, 2023
Current end dateMar 31, 2026
Potential end dateMar 31, 2026
Latest award activityDec 2, 2025
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 11 of 11 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Dec 2, 2025P00010$0F3YCFA3041AW01 PURCHASE AND INSTALL OF FOC BETWEEN MULTIPLE BUILDINGS AT RAMSTEIN AB GER. THE CONTRACTOR SHALL PERFORM ALL LABOR, MATERIALS, TOOLS, AND EXPERTISE NECESSARY TO COMPLETE THE REQUIREMENT IN ACCORDANCE WITH THE PROPOSAL DATED 15 AUG 2023.
Sep 19, 2025P00009$0F3YCFA3041AW01 PURCHASE AND INSTALL OF FOC BETWEEN MULTIPLE BUILDINGS AT RAMSTEIN AB GER. THE CONTRACTOR SHALL PERFORM ALL LABOR, MATERIALS, TOOLS, AND EXPERTISE NECESSARY TO COMPLETE THE REQUIREMENT IN ACCORDANCE WITH THE PROPOSAL DATED 15 AUG 2023.
Jul 11, 2025P00008$36.3KF3YCFA3041AW01 PURCHASE AND INSTALL OF FOC BETWEEN MULTIPLE BUILDINGS AT RAMSTEIN AB GER. THE CONTRACTOR SHALL PERFORM ALL LABOR, MATERIALS, TOOLS, AND EXPERTISE NECESSARY TO COMPLETE THE REQUIREMENT IN ACCORDANCE WITH THE PROPOSAL DATED 15 AUG 2023.
May 17, 2025P00007$0F3YCFA3041AW01 PURCHASE AND INSTALL OF FOC BETWEEN MULTIPLE BUILDINGS AT RAMSTEIN AB GER. THE CONTRACTOR SHALL PERFORM ALL LABOR, MATERIALS, TOOLS, AND EXPERTISE NECESSARY TO COMPLETE THE REQUIREMENT IN ACCORDANCE WITH THE PROPOSAL DATED 15 AUG 2023.
Apr 16, 2025P00006$0F3YCFA3041AW01 PURCHASE AND INSTALL OF FOC BETWEEN MULTIPLE BUILDINGS AT RAMSTEIN AB GER. THE CONTRACTOR SHALL PERFORM ALL LABOR, MATERIALS, TOOLS, AND EXPERTISE NECESSARY TO COMPLETE THE REQUIREMENT IN ACCORDANCE WITH THE PROPOSAL DATED 15 AUG 2023.
Mar 24, 2025P00005$0F3YCFA3041AW01 PURCHASE AND INSTALL OF FOC BETWEEN MULTIPLE BUILDINGS AT RAMSTEIN AB GER. THE CONTRACTOR SHALL PERFORM ALL LABOR, MATERIALS, TOOLS, AND EXPERTISE NECESSARY TO COMPLETE THE REQUIREMENT IN ACCORDANCE WITH THE PROPOSAL DATED 15 AUG 2023.
Feb 25, 2025P00004$0F3YCFA3041AW01 PURCHASE AND INSTALL OF FOC BETWEEN MULTIPLE BUILDINGS AT RAMSTEIN AB GER. THE CONTRACTOR SHALL PERFORM ALL LABOR, MATERIALS, TOOLS, AND EXPERTISE NECESSARY TO COMPLETE THE REQUIREMENT IN ACCORDANCE WITH THE PROPOSAL DATED 15 AUG 2023.
Jan 4, 2025P00003$0F3YCFA3041AW01 PURCHASE AND INSTALL OF FOC BETWEEN MULTIPLE BUILDINGS AT RAMSTEIN AB GER. THE CONTRACTOR SHALL PERFORM ALL LABOR, MATERIALS, TOOLS, AND EXPERTISE NECESSARY TO COMPLETE THE REQUIREMENT IN ACCORDANCE WITH THE PROPOSAL DATED 15 AUG 2023.
Sep 6, 2024P00002$0F3YCFA3041AW01 PURCHASE AND INSTALL OF FOC BETWEEN MULTIPLE BUILDINGS AT RAMSTEIN AB GER. THE CONTRACTOR SHALL PERFORM ALL LABOR, MATERIALS, TOOLS, AND EXPERTISE NECESSARY TO COMPLETE THE REQUIREMENT IN ACCORDANCE WITH THE PROPOSAL DATED 15 AUG 2023.
Aug 13, 2024P00001$30.4KF3YCFA3041AW01 PURCHASE AND INSTALL OF FOC BETWEEN MULTIPLE BUILDINGS AT RAMSTEIN AB GER. THE CONTRACTOR SHALL PERFORM ALL LABOR, MATERIALS, TOOLS, AND EXPERTISE NECESSARY TO COMPLETE THE REQUIREMENT IN ACCORDANCE WITH THE PROPOSAL DATED 15 AUG 2023.
Sep 15, 20230$179.9KFIBER INSTALLATION