Federal contract award

FA667525P0022

THIS REQUIREMENT IS FOR THE REPLACEMENT OF TWO (2) VRF HEAT RECOVERY CONDENSING UNITS AND TWO (2) SIX PORT MODE CONTROL UNIT (MCU) FOR BUILDING 1651 IN ACCORDANCE WITH THE ATTACHED QUOTE, SOW AND SOO.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA6675 301 CONF PK
NAICS238220 — Plumbing, Heating, and Air-Conditioning Contractors
PSCN041 — Installation of Equipment: Refrigeration, Air Conditioning, and Air Circulating Equipment
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$204.2K
Current contract value$204.2K
Potential contract value / ceiling$204.2K
Start dateOct 1, 2025
Current end dateJul 8, 2026
Potential end dateJul 8, 2026
Latest award activityJun 2, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 2, 2026P00003$0THIS REQUIREMENT IS FOR THE REPLACEMENT OF TWO (2) VRF HEAT RECOVERY CONDENSING UNITS AND TWO (2) SIX PORT MODE CONTROL UNIT (MCU) FOR BUILDING 1651 IN ACCORDANCE WITH THE ATTACHED QUOTE, SOW AND SOO.
Mar 13, 2026P00002$0THIS REQUIREMENT IS FOR THE REPLACEMENT OF TWO (2) VRF HEAT RECOVERY CONDENSING UNITS AND TWO (2) SIX PORT MODE CONTROL UNIT (MCU) FOR BUILDING 1651 IN ACCORDANCE WITH THE ATTACHED QUOTE, SOW AND SOO.
Dec 19, 2025P00001$0THIS REQUIREMENT IS FOR THE REPLACEMENT OF TWO (2) VRF HEAT RECOVERY CONDENSING UNITS AND TWO (2) SIX PORT MODE CONTROL UNIT (MCU) FOR BUILDING 1651 IN ACCORDANCE WITH THE ATTACHED QUOTE, SOW AND SOO.
Sep 30, 20250$204.2KTHIS REQUIREMENT IS FOR THE REPLACEMENT OF TWO (2) VRF HEAT RECOVERY CONDENSING UNITS AND TWO (2) SIX PORT MODE CONTROL UNIT (MCU) FOR BUILDING 1651 IN ACCORDANCE WITH THE ATTACHED QUOTE, SOW AND SOO.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.