Federal contract award
FA700023F0039
TASK ORDER FA700023F0039, PROJECT XQPZ190215 REPAIR ENERGY MANAGEMENT CONTROL NETWORK TO VLAN AT USAF ACADEMY, COLORADO AWARDED ON FRONT RANGE MACC IDIQ FA251720D0009.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | FA7000 10 CONS LGC |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Z2JZ — REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS |
| Parent award / vehicle | FA251720D0009 |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $5.0M |
| Current contract value | $5.0M |
| Potential contract value / ceiling | $5.0M |
| Start date | Feb 28, 2023 |
| Current end date | Mar 31, 2026 |
| Potential end date | Mar 31, 2026 |
| Latest award activity | Feb 19, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Feb 19, 2026 | P00005 | $78.6K | THE BASE-WIDE EMCS NETWORK MUST BE MOVED TO A VLAN ON THE GOVERNMENT NETWORK TO COMPLY WITH AFGM2018-32-01 CIVIL ENGINEER CONTROL SYSTEMS CYBER SECURITY REQUIREMENTS AND PER UFGS 25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) REQUIREMENTS. BUI |
| Dec 10, 2025 | P00004 | $0 | THE BASE-WIDE EMCS NETWORK MUST BE MOVED TO A VLAN ON THE GOVERNMENT NETWORK TO COMPLY WITH AFGM2018-32-01 CIVIL ENGINEER CONTROL SYSTEMS CYBER SECURITY REQUIREMENTS AND PER UFGS 25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) REQUIREMENTS. BUI |
| Aug 11, 2025 | P00003 | $0 | THE BASE-WIDE EMCS NETWORK MUST BE MOVED TO A VLAN ON THE GOVERNMENT NETWORK TO COMPLY WITH AFGM2018-32-01 CIVIL ENGINEER CONTROL SYSTEMS CYBER SECURITY REQUIREMENTS AND PER UFGS 25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) REQUIREMENTS. BUI |
| Jun 27, 2025 | P00002 | $0 | THE BASE-WIDE EMCS NETWORK MUST BE MOVED TO A VLAN ON THE GOVERNMENT NETWORK TO COMPLY WITH AFGM2018-32-01 CIVIL ENGINEER CONTROL SYSTEMS CYBER SECURITY REQUIREMENTS AND PER UFGS 25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) REQUIREMENTS. BUI |
| Dec 20, 2024 | P00001 | $0 | THE BASE-WIDE EMCS NETWORK MUST BE MOVED TO A VLAN ON THE GOVERNMENT NETWORK TO COMPLY WITH AFGM2018-32-01 CIVIL ENGINEER CONTROL SYSTEMS CYBER SECURITY REQUIREMENTS AND PER UFGS 25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) REQUIREMENTS. BUI |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.