Federal contract award
FA805124F0008
CONTRACTOR TO PROVIDE RAPID EXPLOSIVE HAZARD MITIGATION (REHM) LARGE CLEARANCE BLADE ASSEMBLIES (L-CBAS).
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | FA8051 772 ESS PKD |
| NAICS | 333120 — Construction Machinery Manufacturing |
| PSC | 3805 — Earth Moving and Excavating Equipment |
| Parent award / vehicle | FA805121D0004 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $2.8M |
| Current contract value | $2.8M |
| Potential contract value / ceiling | $2.8M |
| Start date | Nov 29, 2023 |
| Current end date | Sep 1, 2025 |
| Potential end date | Sep 1, 2025 |
| Latest award activity | May 15, 2025 |
| Source loaded | Aug 15, 2026 |
Funding and modification history
Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 15, 2025 | P00004 | $0 | THE CONTRACTOR SHALL SUPPLY AND DELIVER REHM L-CBAS, TO SELECTED WORLDWIDE LOCATIONS. THE REHM L-CBAS MUST BE; BUILT TO THE PERFORMANCE SPECIFICATIONS IN THE ATTACHED DRAWING PACKAGE; BUILT WITH THE SPECIFIED ALLOYS; AND INCORPORATE THE SPECIFIED ISO |
| Apr 29, 2025 | P00003 | $0 | THE CONTRACTOR SHALL SUPPLY AND DELIVER REHM L-CBAS, TO SELECTED WORLDWIDE LOCATIONS. THE REHM L-CBAS MUST BE; BUILT TO THE PERFORMANCE SPECIFICATIONS IN THE ATTACHED DRAWING PACKAGE; BUILT WITH THE SPECIFIED ALLOYS; AND INCORPORATE THE SPECIFIED ISO |
| Nov 20, 2024 | P00002 | $0 | THE CONTRACTOR SHALL SUPPLY AND DELIVER REHM L-CBAS, TO SELECTED WORLDWIDE LOCATIONS. THE REHM L-CBAS MUST BE; BUILT TO THE PERFORMANCE SPECIFICATIONS IN THE ATTACHED DRAWING PACKAGE; BUILT WITH THE SPECIFIED ALLOYS; AND INCORPORATE THE SPECIFIED ISO |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.