Federal contract award

FA812818C0003

ROTARY SWITCH

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA8128 AFNWC PZN
NAICS336419 — Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing
PSC1420 — Guided Missile Components
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$45.6M
Current contract value$45.6M
Potential contract value / ceiling$45.6M
Start dateMar 9, 2018
Current end dateSep 5, 2028
Potential end dateSep 5, 2028
Latest award activityApr 30, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 54 of 54 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 30, 2026P00053$0REMANUFACTURE OF AIR LAUNCH CRUISE MISSILE ROTARY SWITCH
Mar 26, 2026P00052$0REMANUFACTURE OF AIR LAUNCH CRUISE MISSILE ROTARY SWITCH
Mar 4, 2026P00051$1.3MREMANUFACTURE OF AIR LAUNCH CRUISE MISSILE ROTARY SWITCH
Sep 9, 2025P00050$519.8KREMANUFACTURE OF AIR LAUNCH CRUISE MISSILE ROTARY SWITCH
Sep 3, 2025P00049$-638.7KREMANUFACTURE OF AIR LAUNCH CRUISE MISSILE ROTARY SWITCH
Jul 28, 2025P00048$0REMANUFACTURE OF AIR LAUNCH CRUISE MISSILE ROTARY SWITCH
Jul 11, 2025P00047$135.0KREMANUFACTURE OF AIR LAUNCH CRUISE MISSILE ROTARY SWITCH
May 27, 2025P00046$0REMANUFACTURE OF AIR LAUNCH CRUISE MISSILE ROTARY SWITCH
May 13, 2025P00045$0REMANUFACTURE OF AIR LAUNCHED CRUISE MISSILE ROTARY SWITCH
Apr 17, 2025P00044$600.0KREMANUFACTURE OF AIR LAUNCH CRUISE MISSILE ROTARY SWITCH
Nov 7, 2024P00043$0REMANUFACTURE OF AIR LAUNCH CRUISE MISSILE ROTARY SWITCH
Aug 13, 2024P00042$0REMANUFACTURE OF AIR LAUNCH CRUISE MISSILE ROTARY SWITCH
Apr 23, 2024P00041$0REMANUFACTURE OF AIR LAUNCH CRUISE MISSILE ROTARY SWITCH
Apr 16, 2024P00040$799.0KREMANUFACTURE OF AIR LAUNCH CRUISE MISSILE ROTARY SWITCH
Mar 27, 2024P00039$0REMANUFACTURE OF AIR LAUNCH CRUISE MISSILE (ALCM) ROTARY SWITCH
Nov 17, 2023P00038$1.1MREMANUFACTURE OF THE SIR LAUNCH CRUISE MISSILE ROTARY SWITCH
Aug 31, 2023P00037$5.9MREMANUFACTURE OF AIR LAUNCH CRUISE MISSILE ROTARY SWITCH
Mar 16, 2023P00036$0REMANUFACTURE OF ALCM ROTARY SWITCH
Jan 10, 2023P00035$1.2MREMANUFACTURE OF ALCM ROTARY SWITCH
Oct 20, 2022P00034$75.0KREMANUFACTURE OF ALCM ROTARY SWITCH
Sep 23, 2022P00033$0REMANUFACTURE OF ALCM ROTARY SWITCH
Jul 18, 2022P00032$0REMANUFACTURE OF ALCM ROTARY SWITCH
Jun 22, 2022P00031$0REMANUFACTURE OF ALCM ROTARY SWITCH
May 10, 2022P00030$0REMANUFACTURE OF ALCM ROTARY SWITCH
Mar 28, 2022P00029$5.2MREMANUFACTURE OF ALCM ROTARY SWITCH
Jan 20, 2022P00028$427.2KREMANUFACTURE OF ALCM ROTARY SWITCH
Dec 7, 2021P00027$524.0KREMANUFACTURE OF ALCM ROTARY SWITCH
Oct 8, 2021P00026$129.6KREMANUFACTURE OF ALCM ROTARY SWITCH
Sep 20, 2021P00025$0ROTARY SWITCH REMANUFACTURE
Sep 9, 2021P00024$0REMANUFACTURE OF AIR LAUNCH CRUISE MISSILE (ALCM) ROTARY SWITCH
Sep 1, 2021P00023$4.9MREMANUFACTURE OF AIR LAUNCH CRUISE MISSILE (ALCM) ROTARY SWITCH
Jul 29, 2021P00022$0REMANUFACTURE OF AIR LAUNCH CRUISE MISSILE (ALCM) ROTARY SWITCH
Apr 22, 2021P00021$0REMANUFACTURE OF AIR LAUNCH CRUISE MISSILE (ALCM) ROTARY SWITCH
Mar 19, 2021P00020$709.0KREMANUFACTURE OF ALCM ROTARY SWITCH
Mar 10, 2021P00019$0REMANUFACTURE OF ALCM ROTARY SWITCH
Feb 9, 2021P00018$0ROTARY SWITCH MANUFACTURE
Dec 11, 2020P00017$0ROTARY SWITCH REMANUFACTURE
Sep 29, 2020P00016$5.8MAIR LAUNCH CRUISE MISSILE ROTARY SWITCH
Sep 18, 2020P00015$-226.3KREMANUFACTURE OF ALCM ROTARY SWITCH.
Aug 12, 2020P00014$0REMANUFACTURE OF ALCM ROTARY SWITCH.
Jul 29, 2020P00013$869.7KREMANUFACTURE OF ALCM ROTARY SWITCH
Jun 1, 2020P00012$0REMANUFACTURE OF ALCM ROTARY SWITCH
Mar 5, 2020P00011$0REMANUFACTURE OF ALCM ROTARY SWITCH
Nov 7, 2019P00010$0REMANUFACTURE OF AIR LAUNCH CRUISE MISSILE (ALCM) ROTARY SWITCH
Sep 25, 2019P00009$0ROTARY SWITCH DEFINITIZATION
Aug 30, 2019P00008$5.5MAWARD ROTARY SWITCH LOT II
Jan 26, 2019P00007$0ROTARY SWITCH PROVISIONING CORRECTION
Nov 30, 2018P00006$0ROTARY SWITCH LOT 1 LABOR - ADMIN LLOA CORRECTION
Nov 29, 2018P00005$0ALCM ROTARY SWITCH LOT 1 LABOR, ADMIN FUNDS REALIGNMENT
Oct 24, 2018P00004$3.4MALCM ROTARY SWITCH LOT 1
Oct 4, 2018P00003$0ROTARY SWITCH - TINA CLASS DIVIATION 2018-O0015
Sep 4, 2018PZ0001$2.4MROTARY SWITCH DEFINITIZATION
Jul 18, 2018P00002$1.7MROTARY SWITCH
Mar 9, 20180$3.5MROTARY SWITCH

Estimated positioning window

Sep 5, 2027 – Mar 5, 2028

Recompete signal:
70/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 70/100. Available recorded signals: 65 points.

Contract end 2028-09-05 (681 days from calculation)
+25 points
5 historical awards in this buyer and category group
+15 points
54 recorded award transactions
+10 points
Latest award action: 2026-04-30
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.