Federal contract award

FA820419C0005

MINUTEMAN (LGM-30G) PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA8214 AFNWC PZBB
NAICS336120 — Heavy Duty Truck Manufacturing
PSC2320 — Trucks and Truck Tractors, Wheeled
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$238.2M
Current contract value$238.3M
Potential contract value / ceiling$240.2M
Start dateJun 18, 2019
Current end dateJun 25, 2027
Potential end dateJun 25, 2027
Latest award activityMay 20, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 57 of 57 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 20, 2026P00054$0LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. AMENDMENT TO CORPORATE NAME ONLY CHANGE AND ALL RIGHTS AND OBLIGATIONS OF THE GOVERNMENT AND OF THE CONTRACTOR. ADD SECTION J RAVELIN DEFENSE.
Apr 13, 2026P00053$4.1MLGM-30G PTR PRODUCTION PROGRAM. MOD. TO DOCUMENT THAT P00053 TO NCREASE CLINS 9101, 9102, 9103, AND 9104. ADD ONE PTT TRACTOR, ENGINEERING TO ADAPT ARMAMENT FOR A NEW MODEL TRACTOR, TRAVEL AND MATERIAL REQUIRED FOR ONE TRACTOR (PTT).
Feb 13, 2026P00052$3.6MPTR THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THAT FA820419C0005 P00052 IS DESCRIBED BELOW AND CHANGED IN SECTION B. ADD CLINS 9030, 9111, 9112, 9112AA, 9112AB, 9113, 9117, 9117AA, 9117AB, 9117AC, 9117AD, 9117AE, 9119, 9120, 9122, 9126, AND 9127 TO OPTION 10. MODIFY CLIN'S 9012, 9013, 9014 AND 9016.
Dec 18, 2025P00051$8.2M(PTR) THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THAT FA820419C0005 P00051 TO ADD CLINS 9101-9110 TO ADD OPTION 10. FOR ONE (1) EACH PTR TRAILER NSN 1450-01-691-7548. POP DEL. DATES FOR OPTION 10 CLINS - 12-18-25 THROUGH 6-25-27.
Aug 26, 2025P00050$234.9KLGM-30G PTR) PRODUCTION PROGRAM. CLIN 8006 TO EXTEND POP. ADD SPARES TO BE PURCHASED. EXTEND POP FOR SEVERAL CLINS DUE TO GOV. CAUSED DELAYS.
Aug 14, 2025P00049$3.1MMINUTEMAN (LGM-30G) PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
Mar 19, 2025P00048$0MINUTEMAN (LGM-30G) PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
Dec 9, 2024P00047$1.9MLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. FUND DELAYED FSR FIELDING AND ASSOCIATED COSTS. FUND FSR CDL LICENSES. FUND SLICWAVE & NAVISTAR TRAINING.
Sep 25, 2024P00046$0LGM-30G PTR PRODUCTION PROGRAM. DELETE THE PURPOSE OF THE MODIFICATION FA820419C0005 P00046 IS TO: DELETE CLAUSES DUE TO THE CONTRACT CHANGING THE NAICS CODE FROM 336120 TO 336992. CLAUSES 252.219-7003, 252.219-7003, 52.219-16, 52.219-9, 52.219-9, 52.230-2, 52.230-6
Sep 13, 2024P00045$472.0KLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. P00045 TO FUND $125,178.64 FOR TRAVEL CLIN 5004 FOR MALMSTROM PTR TRAINING, AND CLIN 5009 TRAINING COST FOR MALMSTOM TO THE AMOUNT OF $346,784.74.
Aug 14, 2024P00044$260.6KLGM-30G (PTR) PRODUCTION PROGRAM. MOD P00044 IS TO INCR. FUNDING FOR CLIN 5009. CLIN 5009 INC. DUE TO DESIGN CHANGES REQUIRING ADTL TRAINING FOR SCOPE CHANGE. EXT. THE POP DEL. FOR CLINS 7001 THROUGH 7009. NO COST POP EXTENSION. EXT. REQUESTED BY AWE FOR DELIVERY OF PTR UNITS 15 17.
Jul 31, 2024P00043$1.3MLGM-30G PTR) PRODUCTION PROGRAM. MOD P00043 TO ADD & FUND CLIN'S 7020, 7021, 9015, 9016 AND 9017. INCR. CLIN 7002 & 8002 DUE TO INFLATION. INCR. CLIN 7015 FOR PTR/ECU/APU EXERCISE & MAINTENANCE. UPDATE PER MOD A00001 FROM DCMA.
Jul 19, 2024A00001$-150.4KLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
Jun 26, 2024P00042$738.2KLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. MOD. FOR FA820419C0005 P00042 IS TO ADD AND FUND CLIN 9006. CLIN 9006 IS SPARES STORAGE COSTS FOR 12 MONTHS. FUND CLIN 3006 FOR THE LOT PURCHASE OF SPARES PTR. ADD SECTION J OFFICIAL PTR SPARES PARTS LIST DATED 18 JUNE 2024.
Jun 6, 2024P00041$845.7KLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. FA820419C0005 P00041 TO ADD AND FUND CLIN'S 9012, 9013, 9014, 9019, 9020, AND 9022 FOR (FSR) REQUIREMENTS FOR F.E. WARREN. CLIN 9022 IS TO ACQUIRE 6 (ECU) BENCH TESTERS.
May 16, 2024P00040$454.8KLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. MOD P00040 TO DEOB. CLIN 0001, OBLIGATE FOR INFLATION FOR ECU'S AND TRACTORS. PURCHASE EMD EVALUATION, AND SPARE TRANSPARENT ARMOR. CHG ORIGIN ORIGIN TO ORIGIN DESTINATION.
Jan 25, 2024P00039$0LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THAT FA820419C0005 P00039 IS BEING PERFORMED TO UPDATE THE PERIOD OF PERFORMANCE (POP) AS FOLLOWS: NO COST PERIOD OF PERFORMANCE EXTENSION PERIOD OF PERFORMANCE FOR CLIN'S 5001, 5004, AND 5009 ARE EXTENDED.
Dec 14, 2023P00038$15.1MLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. EXERCISE OPTION 9 AND FUND. ADD $1,195,353.36 TO COVER INFLATION INCREASES ($808,622.87) AND SCRAP ALLOWANCE ($386,730.49). REALIGN FUNDS TO COVER OVERRUNS AND UNDERRUNS FOR THE BASIC YEAR.
Nov 29, 2023P00037$1.2MLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. MOD. FA820419C0005 P00037 TO OBLIGATE FUNDING CLIN'S 5002, 6002 7002 AND 8002 FOR MATRL. OVERRUN SCRAP COSTS. CHANGE ADMIN BY DODAAC S0302A.
Nov 9, 2023P00036$1.3MLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. MOD. IS TO FUND CLIN'S 5002 & 6002 TO COVER MATL. SCRAP COSTS & CLIN 3002 FOR MATL, SCRAP COST $375,559.37 AND OPTION 3 MATL. INFLATION COST $670,363.19.
Oct 30, 2023P00035$13.9MLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. POP EXT. 1104, 7012-7017. ADD WARRANTY MEMORANDUM. EXERCISE OPTION 3 FOR 11-1-2023 TO 6-30-2025.
Aug 31, 2023P00034$0LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. NO COST PERIOD OF PERFORMANCE EXTENSION FOR OPTION 4 PERIOD OF PERFORMANCE FOR CLIN'S 4001, 4002, 4003, 4004, 4005, 4006, 4007, AND 4008 ARE EXTENDED FROM 8-31-23 TO 10-31-23.
Jul 25, 2023P00033$57.0KLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. MOD. TO DOCUMENT THAT FA820419C0005 P00033 IS PERFORMED TO ADD THE PURCHASE OF 4 EACH SPARE SILENTDRIVE AXLES (2 SETS). ADD CLIN 7017.
Jul 12, 2023P00032$1.2MLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THAT FA820419C0005 P00032 IS BEING PERFORMED ADD FUNDING FOR ENGINEERING CHANGE PROPOSAL (ECP) CHANGES. INCREASE CLIN'S 7001, 7002, AND 7003 AS NOTED BELOW. ADD CLIN 7016 FOR A LIFETIME PURCHASE OF PTR TRANSPARENT ARMOR (GLASS).
Jun 29, 2023P00031$21.6MLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THAT P00023 IS BEING PERFORMED ADD FUNDING FOR OPTION 8 WITH INFLATIONARY INCREASE FOR MATERIAL.
Jun 12, 2023P00030$806.9KLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. FUNDING FOR ENGINEERING CHANGE PROPOSAL (ECP)7001, 7002 & 7003. CLIN 7012 INCREASE QTY TO 14. FUND CLIN 7011AB.ADD CLIN 7015. POP FROM 5-5-23 TO 8-31-23 & 11-18-23 TO 1-31-24.
May 12, 2023P00029$748.4KLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THAT FA820419C0005 P00029 IS BEING PERFORMED ADD FUNDING FOR ENGINEERING CHANGE PROPOSAL (ECP) CHANGES. INCREASE CLIN'S 7001, 7002, AND 7003 AS NOTED BELOW.
Apr 18, 2023P00028$2.9MLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. MOD TO FUND SCRAP, NST MFG AND DEVELOPMENT, STORAGE COST FOR AXLES AND TRACTORS, FUNDING FOR 7 ADDITIONAL AXLES AND ENG. COSTS.
Jan 3, 2023P00027$0LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM, MODIFICATION IS TO DOCUMENT THAT FA820419C0005 P00027 TO CORRECT AN INDADVERTENT SYSTEM ERROR THAT CHANGED THE CONTRACT RATING FROM THE ORIGINAL DX TO DO. THIS MODIFICATION CORRECTS TO THE ORIGINAL DX RATING.
Dec 20, 2022P00026$1.7MLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. FA820419C0005 P00026 IS BEING PERFORMED TO ADD AND FUND CLIN 7009, AND ADD ADDITIONAL FUNDING ON CLIN 0012. POP) FOR OPTION 2 FROM 31 DECEMBER 2022 TO 31 MARCH 2023. CLIN'S 3002, 8002 AND 9002 HAVE REDUCED THE EST. COST, FEE AND EXTENDED COST.
Nov 14, 2022P00025$21.4MLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. MODIFICATION IS TO DOCUMENT THAT FA820419C0005 P00025 IS BEING PERFORMED TO EXERCISE ALL CLIN'S ASSOCIATED WITH OPTION 7 AND TO FULLY FUND CLIN'S 7001 THROUGH 7005.
Nov 2, 2022P00024$0LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM POP CHANGE.
Oct 7, 2022P00023$0LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM THE PURPOSE OF THE MODIFICATION IS TO EXTEND THE POP END DATE FOR CLINS 2001, 2002, AND 2006 FROM 10 OCTOBER 2022 TO 31 DECEMBER 2022.
Sep 15, 2022P00022$0LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
Aug 8, 2022P00021$219.2KLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
Jun 24, 2022P00020$501.4KLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
Jun 9, 2022P00019$1.1MLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
Jun 1, 2022P00018$21.7MLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
May 24, 2022P00017$1.7MLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
Mar 15, 2022P00016$-1.4MLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
Feb 17, 2022P00015$30.0KLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
Jan 12, 2022P00014$0LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
Nov 22, 2021P00013$23.1MLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
Nov 1, 2021P00012$0LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
Sep 2, 2021P00011$0LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
Jul 15, 2021P00010$0PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
May 26, 2021P00009$21.7MPAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
Apr 2, 2021P00008$0LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
Feb 3, 2021P00007$14.5MLGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
Nov 6, 2020ARZ998$0LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
Sep 9, 2020P00006$0LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
Jul 10, 2020P00005$0PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
May 19, 2020P00004$16.8MPAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
Sep 27, 2019P00003$0LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
Jul 25, 2019P00002$0LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
Jul 8, 2019P00001$0LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM
Jun 18, 20190$31.3MMINUTEMAN (LGM-30G) PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2027-06-25 (243 days from calculation)
+35 points
1 historical awards in this buyer and category group
+0 points
57 recorded award transactions
+10 points
Latest award action: 2026-05-20
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.