| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | FA8214 AFNWC PZBB |
| NAICS | 336120 — Heavy Duty Truck Manufacturing |
| PSC | 2320 — Trucks and Truck Tractors, Wheeled |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $238.2M |
| Current contract value | $238.3M |
| Potential contract value / ceiling | $240.2M |
| Start date | Jun 18, 2019 |
| Current end date | Jun 25, 2027 |
| Potential end date | Jun 25, 2027 |
| Latest award activity | May 20, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 57 of 57 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 20, 2026 | P00054 | $0 | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. AMENDMENT TO CORPORATE NAME ONLY CHANGE AND ALL RIGHTS AND OBLIGATIONS OF THE GOVERNMENT AND OF THE CONTRACTOR. ADD SECTION J RAVELIN DEFENSE. |
| Apr 13, 2026 | P00053 | $4.1M | LGM-30G PTR PRODUCTION PROGRAM. MOD. TO DOCUMENT THAT P00053 TO NCREASE CLINS 9101, 9102, 9103, AND 9104. ADD ONE PTT TRACTOR, ENGINEERING TO ADAPT ARMAMENT FOR A NEW MODEL TRACTOR, TRAVEL AND MATERIAL REQUIRED FOR ONE TRACTOR (PTT). |
| Feb 13, 2026 | P00052 | $3.6M | PTR THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THAT FA820419C0005 P00052 IS DESCRIBED BELOW AND CHANGED IN SECTION B. ADD CLINS 9030, 9111, 9112, 9112AA, 9112AB, 9113, 9117, 9117AA, 9117AB, 9117AC, 9117AD, 9117AE, 9119, 9120, 9122, 9126, AND 9127 TO OPTION 10. MODIFY CLIN'S 9012, 9013, 9014 AND 9016. |
| Dec 18, 2025 | P00051 | $8.2M | (PTR) THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THAT FA820419C0005 P00051 TO ADD CLINS 9101-9110 TO ADD OPTION 10. FOR ONE (1) EACH PTR TRAILER NSN 1450-01-691-7548. POP DEL. DATES FOR OPTION 10 CLINS - 12-18-25 THROUGH 6-25-27. |
| Aug 26, 2025 | P00050 | $234.9K | LGM-30G PTR) PRODUCTION PROGRAM. CLIN 8006 TO EXTEND POP. ADD SPARES TO BE PURCHASED. EXTEND POP FOR SEVERAL CLINS DUE TO GOV. CAUSED DELAYS. |
| Aug 14, 2025 | P00049 | $3.1M | MINUTEMAN (LGM-30G) PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| Mar 19, 2025 | P00048 | $0 | MINUTEMAN (LGM-30G) PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| Dec 9, 2024 | P00047 | $1.9M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. FUND DELAYED FSR FIELDING AND ASSOCIATED COSTS. FUND FSR CDL LICENSES. FUND SLICWAVE & NAVISTAR TRAINING. |
| Sep 25, 2024 | P00046 | $0 | LGM-30G PTR PRODUCTION PROGRAM. DELETE THE PURPOSE OF THE MODIFICATION FA820419C0005 P00046 IS TO: DELETE CLAUSES DUE TO THE CONTRACT CHANGING THE NAICS CODE FROM 336120 TO 336992. CLAUSES 252.219-7003, 252.219-7003, 52.219-16, 52.219-9, 52.219-9, 52.230-2, 52.230-6 |
| Sep 13, 2024 | P00045 | $472.0K | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. P00045 TO FUND $125,178.64 FOR TRAVEL CLIN 5004 FOR MALMSTROM PTR TRAINING, AND CLIN 5009 TRAINING COST FOR MALMSTOM TO THE AMOUNT OF $346,784.74. |
| Aug 14, 2024 | P00044 | $260.6K | LGM-30G (PTR) PRODUCTION PROGRAM. MOD P00044 IS TO INCR. FUNDING FOR CLIN 5009. CLIN 5009 INC. DUE TO DESIGN CHANGES REQUIRING ADTL TRAINING FOR SCOPE CHANGE. EXT. THE POP DEL. FOR CLINS 7001 THROUGH 7009. NO COST POP EXTENSION. EXT. REQUESTED BY AWE FOR DELIVERY OF PTR UNITS 15 17. |
| Jul 31, 2024 | P00043 | $1.3M | LGM-30G PTR) PRODUCTION PROGRAM. MOD P00043 TO ADD & FUND CLIN'S 7020, 7021, 9015, 9016 AND 9017. INCR. CLIN 7002 & 8002 DUE TO INFLATION. INCR. CLIN 7015 FOR PTR/ECU/APU EXERCISE & MAINTENANCE. UPDATE PER MOD A00001 FROM DCMA. |
| Jul 19, 2024 | A00001 | $-150.4K | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| Jun 26, 2024 | P00042 | $738.2K | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. MOD. FOR FA820419C0005 P00042 IS TO ADD AND FUND CLIN 9006. CLIN 9006 IS SPARES STORAGE COSTS FOR 12 MONTHS. FUND CLIN 3006 FOR THE LOT PURCHASE OF SPARES PTR. ADD SECTION J OFFICIAL PTR SPARES PARTS LIST DATED 18 JUNE 2024. |
| Jun 6, 2024 | P00041 | $845.7K | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. FA820419C0005 P00041 TO ADD AND FUND CLIN'S 9012, 9013, 9014, 9019, 9020, AND 9022 FOR (FSR) REQUIREMENTS FOR F.E. WARREN. CLIN 9022 IS TO ACQUIRE 6 (ECU) BENCH TESTERS. |
| May 16, 2024 | P00040 | $454.8K | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. MOD P00040 TO DEOB. CLIN 0001, OBLIGATE FOR INFLATION FOR ECU'S AND TRACTORS. PURCHASE EMD EVALUATION, AND SPARE TRANSPARENT ARMOR. CHG ORIGIN ORIGIN TO ORIGIN DESTINATION. |
| Jan 25, 2024 | P00039 | $0 | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THAT FA820419C0005 P00039 IS BEING PERFORMED TO UPDATE THE PERIOD OF PERFORMANCE (POP) AS FOLLOWS: NO COST PERIOD OF PERFORMANCE EXTENSION PERIOD OF PERFORMANCE FOR CLIN'S 5001, 5004, AND 5009 ARE EXTENDED. |
| Dec 14, 2023 | P00038 | $15.1M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. EXERCISE OPTION 9 AND FUND. ADD $1,195,353.36 TO COVER INFLATION INCREASES ($808,622.87) AND SCRAP ALLOWANCE ($386,730.49). REALIGN FUNDS TO COVER OVERRUNS AND UNDERRUNS FOR THE BASIC YEAR. |
| Nov 29, 2023 | P00037 | $1.2M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. MOD. FA820419C0005 P00037 TO OBLIGATE FUNDING CLIN'S 5002, 6002 7002 AND 8002 FOR MATRL. OVERRUN SCRAP COSTS. CHANGE ADMIN BY DODAAC S0302A. |
| Nov 9, 2023 | P00036 | $1.3M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. MOD. IS TO FUND CLIN'S 5002 & 6002 TO COVER MATL. SCRAP COSTS & CLIN 3002 FOR MATL, SCRAP COST $375,559.37 AND OPTION 3 MATL. INFLATION COST $670,363.19. |
| Oct 30, 2023 | P00035 | $13.9M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. POP EXT. 1104, 7012-7017. ADD WARRANTY MEMORANDUM. EXERCISE OPTION 3 FOR 11-1-2023 TO 6-30-2025. |
| Aug 31, 2023 | P00034 | $0 | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. NO COST PERIOD OF PERFORMANCE EXTENSION FOR OPTION 4 PERIOD OF PERFORMANCE FOR CLIN'S 4001, 4002, 4003, 4004, 4005, 4006, 4007, AND 4008 ARE EXTENDED FROM 8-31-23 TO 10-31-23. |
| Jul 25, 2023 | P00033 | $57.0K | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. MOD. TO DOCUMENT THAT FA820419C0005 P00033 IS PERFORMED TO ADD THE PURCHASE OF 4 EACH SPARE SILENTDRIVE AXLES (2 SETS). ADD CLIN 7017. |
| Jul 12, 2023 | P00032 | $1.2M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THAT FA820419C0005 P00032 IS BEING PERFORMED ADD FUNDING FOR ENGINEERING CHANGE PROPOSAL (ECP) CHANGES. INCREASE CLIN'S 7001, 7002, AND 7003 AS NOTED BELOW. ADD CLIN 7016 FOR A LIFETIME PURCHASE OF PTR TRANSPARENT ARMOR (GLASS). |
| Jun 29, 2023 | P00031 | $21.6M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THAT P00023 IS BEING PERFORMED ADD FUNDING FOR OPTION 8 WITH INFLATIONARY INCREASE FOR MATERIAL. |
| Jun 12, 2023 | P00030 | $806.9K | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. FUNDING FOR ENGINEERING CHANGE PROPOSAL (ECP)7001, 7002 & 7003. CLIN 7012 INCREASE QTY TO 14. FUND CLIN 7011AB.ADD CLIN 7015. POP FROM 5-5-23 TO 8-31-23 & 11-18-23 TO 1-31-24. |
| May 12, 2023 | P00029 | $748.4K | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. THE PURPOSE OF THIS MODIFICATION IS TO DOCUMENT THAT FA820419C0005 P00029 IS BEING PERFORMED ADD FUNDING FOR ENGINEERING CHANGE PROPOSAL (ECP) CHANGES. INCREASE CLIN'S 7001, 7002, AND 7003 AS NOTED BELOW. |
| Apr 18, 2023 | P00028 | $2.9M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. MOD TO FUND SCRAP, NST MFG AND DEVELOPMENT, STORAGE COST FOR AXLES AND TRACTORS, FUNDING FOR 7 ADDITIONAL AXLES AND ENG. COSTS. |
| Jan 3, 2023 | P00027 | $0 | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM, MODIFICATION IS TO DOCUMENT THAT FA820419C0005 P00027 TO CORRECT AN INDADVERTENT SYSTEM ERROR THAT CHANGED THE CONTRACT RATING FROM THE ORIGINAL DX TO DO. THIS MODIFICATION CORRECTS TO THE ORIGINAL DX RATING. |
| Dec 20, 2022 | P00026 | $1.7M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. FA820419C0005 P00026 IS BEING PERFORMED TO ADD AND FUND CLIN 7009, AND ADD ADDITIONAL FUNDING ON CLIN 0012. POP) FOR OPTION 2 FROM 31 DECEMBER 2022 TO 31 MARCH 2023. CLIN'S 3002, 8002 AND 9002 HAVE REDUCED THE EST. COST, FEE AND EXTENDED COST. |
| Nov 14, 2022 | P00025 | $21.4M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM. MODIFICATION IS TO DOCUMENT THAT FA820419C0005 P00025 IS BEING PERFORMED TO EXERCISE ALL CLIN'S ASSOCIATED WITH OPTION 7 AND TO FULLY FUND CLIN'S 7001 THROUGH 7005. |
| Nov 2, 2022 | P00024 | $0 | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM POP CHANGE. |
| Oct 7, 2022 | P00023 | $0 | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM THE PURPOSE OF THE MODIFICATION IS TO EXTEND THE POP END DATE FOR CLINS 2001, 2002, AND 2006 FROM 10 OCTOBER 2022 TO 31 DECEMBER 2022. |
| Sep 15, 2022 | P00022 | $0 | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| Aug 8, 2022 | P00021 | $219.2K | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| Jun 24, 2022 | P00020 | $501.4K | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| Jun 9, 2022 | P00019 | $1.1M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| Jun 1, 2022 | P00018 | $21.7M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| May 24, 2022 | P00017 | $1.7M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| Mar 15, 2022 | P00016 | $-1.4M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| Feb 17, 2022 | P00015 | $30.0K | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| Jan 12, 2022 | P00014 | $0 | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| Nov 22, 2021 | P00013 | $23.1M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| Nov 1, 2021 | P00012 | $0 | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| Sep 2, 2021 | P00011 | $0 | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| Jul 15, 2021 | P00010 | $0 | PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| May 26, 2021 | P00009 | $21.7M | PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| Apr 2, 2021 | P00008 | $0 | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| Feb 3, 2021 | P00007 | $14.5M | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| Nov 6, 2020 | ARZ998 | $0 | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| Sep 9, 2020 | P00006 | $0 | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| Jul 10, 2020 | P00005 | $0 | PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| May 19, 2020 | P00004 | $16.8M | PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| Sep 27, 2019 | P00003 | $0 | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| Jul 25, 2019 | P00002 | $0 | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| Jul 8, 2019 | P00001 | $0 | LGM-30G PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
| Jun 18, 2019 | 0 | $31.3M | MINUTEMAN (LGM-30G) PAYLOAD TRANSPORTER REPLACEMENT (PTR) PRODUCTION PROGRAM |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2027-06-25 (243 days from calculation)
- +35 points
- 1 historical awards in this buyer and category group
- +0 points
- 57 recorded award transactions
- +10 points
- Latest award action: 2026-05-20
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.