Federal contract award

FA850113FA025

IGF::OT::IGF ANALYSIS (COMPRESSED AIR)

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA8501 OPL CONTRACTING AFSC/PZIO
NAICS221122 — Electric Power Distribution
PSCS119 — Other Utilities
Parent award / vehicleGS00P06BSD0472
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$32.3M
Current contract value$52.8M
Potential contract value / ceiling$60.3M
Start dateSep 19, 2013
Current end dateJun 29, 2039
Potential end dateJun 29, 2039
Latest award activityJan 30, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 28 of 28 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jan 30, 2026P00027$8.0KCOMPRESSED AIR (UESC) AT ROBINS AFB GA.
Dec 19, 2025P00026$275.3KCOMPRESSED AIR (UESC) AT ROBINS AFB GA.
Dec 18, 2025P00025$0COMPRESSED AIR (UESC) AT ROBINS AFB GA.
Jun 18, 2025P00024$1.1MCOMPRESSED AIR (UESC) AT ROBINS AFB GA.
Jan 7, 2025P00023$0COMPRESSED AIR (UESC) AT ROBINS AFB GA.
Dec 5, 2024P00022$471.9KCOMPRESSED AIR (UESC) AT ROBINS AFB GA.
Jul 11, 2024P00021$1.1MCOMPRESSED AIR (UESC) AT ROBINS AFB GA.
Dec 6, 2023P00020$460.4KUESC - REPLACE COMPRESSED AIR FACILITY
Jul 14, 2023P00019$1.0MCOMPRESSED AIR - UESC PROJECT
Dec 14, 2022P00018$0COMPRESSED AIR - UESC PROJECT
Nov 22, 2022P00017$449.2KUESC COMPRESSED AIR.
Aug 12, 2022P00016$136.7KUESC COMPRESSED AIR.
Jul 13, 2022P00015$1.0MUESC PROJECT FOR COMPRESSED AIR SYSTEM.
Jun 17, 2022P00014$234.3KUESC PROJECT FOR COMPRESSED AIR SYSTEM. INSTALLATION OF MCC
Mar 1, 2022P00013$508.1KUESC GEORGIA POWER
Dec 1, 2021P00012$438.2KUESC PROJECT FOR COMPRESSED AIR SYSTEM.
Jul 30, 2021P00011$1.1MUESC PROJECT FOR COMPRESSED AIR SYSTEM.
Feb 18, 2021P00010$0UESC PROJECT FOR COMPRESSED AIR SYSTEM.
Dec 14, 2020P00009$491.6KUESC - INSTALLATION OF COMPRESSED AIR SYSTEM AND BLDG 140 LIGHTING AT ROBINS AFB GA.
May 20, 2020P00008$1.5MDESIGN BUILD COMPRESSED AIR SYSTEM AT ROBINS AFB GA AND DESIGN BUILD LIGHTING SYSTEM IN BLDG. 140.
Sep 30, 2019P00007$1.0MCOMPRESSED AIR PROJECT
Sep 28, 2018P00006$609.6KBLDG 140 LIGHTING PROJECT
Feb 7, 2018P00005$15.0MPRINCIPLE&INTEREST
Jan 12, 2018P00004$9.4KCONSTRUCT LIGHTING BLDG 140
Sep 29, 2017P00003$1.9MIGF::OT::IGF CONSTRUCT LIGHTING BLDG 140
May 19, 2016P00002$996.2KIGF::OT::IGF REQUEST CONTRACT TO DESIGN LIGHTING
Mar 11, 2014P00001$0IGF::OT::IGF ANALYSIS (COMPRESSED AIR)
Sep 20, 20130$747.2KIGF::OT::IGF ANALYSIS (COMPRESSED AIR)

Estimated positioning window

Jun 29, 2038 – Dec 29, 2038

Recompete signal:
30/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 30/100. Available recorded signals: 25 points.

Contract end 2039-06-29 (4630 days from calculation)
+5 points
1 historical awards in this buyer and category group
+0 points
28 recorded award transactions
+10 points
Latest award action: 2026-01-30
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.