Federal contract award

FA861517C6047

F-16 ACTIVE ELECTRONICALLY SCANNED ARRAY JOINT EMERGENT OPERATIONAL NEED

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA8615 AFLCMC WAMK F16
NAICS334511 — Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
PSC5841 — Radar Equipment, Airborne
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$1.5B
Current contract value$1.3B
Potential contract value / ceiling$1.2B
Start dateMay 31, 2017
Current end dateJan 29, 2029
Potential end dateMay 30, 2031
Latest award activityJun 1, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 204 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 11, 2026P00178$14.2MF-16 USAF AESA RADAR
Jun 1, 2026P00177$2.0MF-16 AESA RADAR
May 6, 2026P00179$0F-16 AESA JUON, IVEWS EWRFC - FUNDING SWAP & LOA CORRECTION
Apr 29, 2026P00172$20.0MF-16 IVEWS EWRFC SPIRAL 1
Mar 25, 2026P00176$16.1MF-16 IVEWS EWRFC- COMPLETION OF FUNDING AND POP EXT.
Mar 12, 2026P00175$-7.4KF-16 USAF AESA RADAR
Feb 24, 2026P00173$3.6MF16 AESA RADAR- INTEGRATED VIPER ELECTRONIC WARFARE SUITE (IVEWS) INCREMENTAL FUNDING
Feb 19, 2026P00170$0F-16 USAF AESA RADAR
Jan 29, 2026P00156$3.1MF-16 USAF AESA RADAR
Jan 22, 2026P00151$0F-16 USAF AESA RADAR
Jan 22, 2026P00171$2.5MF-16 AESA RADAR, IVEWS IF CLINS 3101, 3102, 3103, 3104
Dec 18, 2025P00149$164.4KF-16 USAF AESA RADAR
Dec 18, 2025P00149$6.8MF-16 USAF AESA RADAR
Dec 15, 2025P00148$2.5MF-16 AESA RADAR
Dec 15, 2025P00148$794.5KF-16 AESA RADAR
Dec 11, 2025P00169$2.5MIVEWS EWRFC- IF CLINS 3101, 3102, 3103, 3104
Dec 10, 2025P00104$63.0KF-16 AESA RADAR
Dec 10, 2025P00104$371.9KF-16 AESA RADAR
Dec 10, 2025P00104$10.6MF-16 AESA RADAR
Nov 18, 2025P00168$0F-16 INTEGRATED VIPER ELECTRONIC WARFARE SUITE (IVEWS) ELECTRONIC WARFARE RADIO FREQUENCY COMPATIBILITY (EWRFC)
Nov 12, 2025P00167$0F-16 USAF AESA RADAR
Oct 28, 2025P00159$0F-16 USAF AESA RADAR
Oct 23, 2025P00165$999.8KF-16 IVEWS EWRFC ADD-WORK
Sep 30, 2025P00166$509.8KF-16, ACTIVE ELECTRONICALLY SCANNED ARRAY (AESA) RADAR, INTEGRATED VIPER ELECTRONIC WARFARE SUITE (IVEWS)
Sep 29, 2025P00164$475.4KF-16 AESA, IVEWS EWRFC OPTION AND NCTE
Sep 25, 2025P00137$5.4MF-16 AESA RADAR
Sep 15, 2025P00139$483.8KF-16 AESA RADAR
Sep 11, 2025P00154$-3.0MF-16 AESA RADAR
Aug 28, 2025P00163$2.0MF-16 ACTIVE ELECTRONICALLY SCANNED ARRAY (AESA) RADAR, INTEGRATED VIPER ELECTRONIC WARFARE SUITE (IVEWS)
Aug 26, 2025P00161$1.8MF-16 AESA, IVEWS EWRFC
Aug 14, 2025P00162$1.1MF-16, ACTIVE ELECTRONICALLY SCANNED ARRAY (AESA) RADAR, INTEGRATED VIPER ELECTRONIC WARFARE SUITE (IVEWS)
Jul 24, 2025P00160$700.0KAESA RADAR- IVEWS CLIN 3101 INCREMENTAL FUNDING
Jul 17, 2025P00158$0AESA RADAR- IVEWS DE-OBLIGATION/ RE-OBLIGATION OF FUNDS
Jun 27, 2025P00150$0F-16 AESA RADAR
Jun 26, 2025P00155$1.2MF-16 AESA RADAR
May 30, 2025P00153$816.0KF-16, AESA RADAR
May 23, 2025P00152$0F-16 AESA RADAR- IVEWS, ADMIN MOD FOR LOA
May 22, 2025P00135$2.0MF-16 AESA RADAR
May 7, 2025P00147$0F-16 AESA RADAR
May 5, 2025P00146$1.0MF-16 AESA RADAR
Apr 28, 2025P00133$6.5MF-16 AESA RADAR
Mar 31, 2025P00141$80.1KF-16 AESA RADAR
Mar 27, 2025P00144$14.2MF-16 AESA RADAR
Mar 21, 2025P00145$1.6MF-16 AESA RADAR
Mar 13, 2025P00140$0F-16 AESA RADAR
Mar 6, 2025P00143$0F-16 AESA RADAR
Feb 24, 2025P00142$0F-16 AESA RADAR
Feb 18, 2025P00132$0F-16 AESA RADAR
Jan 15, 2025P00138$0F-16 AESA RADAR
Jan 13, 2025P00136$2.4MF-16 AESA RADAR
Dec 17, 2024P00099$0F-16 AESA RADAR
Dec 12, 2024P00131$0F-16 AESA RADAR
Nov 20, 2024P00130$0F-16 AESA RADAR
Nov 13, 2024P00129$0F-16 AESA RADAR
Nov 12, 2024P00128$0F-16 AESA RADAR
Nov 4, 2024P00127$0F-16 AESA RADAR
Oct 28, 2024P00126$0F-16 AESA RADAR
Oct 18, 2024P00125$3.0MF-16 AESA RADAR
Sep 27, 2024P00096$10.7MF-16 AESA RADAR
Sep 27, 2024P00103$7.8MF-16 AESA RADAR
Sep 27, 2024P00103$22.2MF-16 AESA RADAR
Sep 26, 2024P00117$0F-16 AESA RADAR
Sep 25, 2024P00111$0F-16 AESA RADAR
Sep 23, 2024P00124$1.6MF-16 AESA RADAR
Sep 19, 2024P00110$463.9KF-16 AESA RADAR
Sep 17, 2024P00118$16.7MF-16 AESA RADAR
Sep 4, 2024P00123$1.0MF-16 AESA RADAR
Sep 3, 2024P00122$-1.2MF-16 AESA RADAR
Aug 29, 2024P00105$107.3KF-16 AESA RADAR
Aug 28, 2024P00102$72.9KF-16 AESA RADAR
Aug 28, 2024P00102$1.1MF-16 AESA RADAR
Aug 9, 2024P00121$408.6KF-16 ACTIVE ELECTRONICALLY SCANNED ARRAY (AESA) RADAR
Jun 27, 2024P00097$5.1MF-16 AESA RADAR
Jun 24, 2024P00120$3.8MF-16 AESA RADAR
Jun 17, 2024P00119$2.0MF-16 ACTIVE ELECTRONICALLY SCANNED ARRAY (AESA) RADAR
May 30, 2024P00113$0F-16 AESA RADAR
May 16, 2024P00116$1.3MF-16 AESA RADAR
May 16, 2024P00116$18.8KF-16 AESA RADAR
May 15, 2024P00115$0F-16 AESA RADAR
May 14, 2024P00114$2.5MF-16 ACTIVE ELECTRONICALLY SCANNED ARRAY (AESA) RADAR
Apr 30, 2024P00109$137.3KF-16 AESA RADAR
Apr 26, 2024P00112$2.6MF-16 AESA RADAR
Apr 12, 2024P00107$1.2MF-16 AESA RADAR
Mar 29, 2024P00108$0F-16 AESA RADAR
Mar 28, 2024P00106$55.9MF-16 AESA RADAR
Feb 2, 2024P00101$6.6MF-16 AESA RADAR
Jan 22, 2024P00094$5.1MF-16 AESA RADAR
Dec 13, 2023P00100$0F-16 AESA RADAR
Nov 6, 2023P00098$0F-16 AESA RADAR
Sep 27, 2023P00092$3.5MF-16 AESA RADAR
Sep 19, 2023P00095$0F-16 AESA RADAR
Aug 21, 2023P00093$0F-16 AESA RADAR
Jul 27, 2023P00089$-168.8KF-16 AESA RADAR
Jul 19, 2023P00091$0F-16 AESA RADAR
Jul 12, 2023P00090$13.3MF-16 AESA RADAR
Jun 28, 2023P00088$20.0MF-16 AESA RADAR
Jun 13, 2023P00086$1.4MF-16 AESA RADAR
May 25, 2023P00087$7.5MF-16 AESA RADAR
Apr 25, 2023P00077$8.6MF-16 AESA RADAR
Apr 18, 2023P00085$0F-16 AESA RADAR
Apr 10, 2023P00084$6.0MF-16 AESA RADAR
Mar 28, 2023P00083$128.5MF-16 AESA RADAR
Mar 8, 2023P00082$4.5MF-16 AESA RADAR
Feb 23, 2023P00070$0F-16 AESA RADAR
Feb 3, 2023P00081$0F-16 AESA RADAR
Jan 27, 2023P00080$15.9MF-16 AESA RADAR
Dec 14, 2022P00079$0F-16 AESA RADAR
Nov 23, 2022P00078$9.1MF-16 AESA RADAR
Nov 22, 2022P00076$99.4MF-16 AESA RADAR
Oct 20, 2022P00074$0F-16 AESA RADAR
Sep 29, 2022P00075$-63.0KF-16 AESA RADAR
Sep 27, 2022P00066$0F-16 AESA RADAR
Sep 22, 2022P00073$1.3MF-16 AESA RADAR
Sep 21, 2022P00072$26.4MF-16 AESA RADAR
Sep 12, 2022P00071$0F-16 AESA RADAR
Aug 31, 2022P00058$0F-16, AESA/IVEWS (INTEGRATED VIPER ELECTRONIC WARFARE SUITE), EWRFC (ELECTRONIC WARFARE RADIO FREQUENCY COMPATIBILITY)
Aug 22, 2022P00069$0F-16 AESA RADAR
Aug 15, 2022P00068$0F-16 AESA RADAR
Aug 4, 2022P00067$88.2MF-16 AESA RADAR
Aug 1, 2022P00056$0F-16, AESA/IVEWS (INTEGRATED VIPER ELECTRONIC WARFARE SUITE), EWRFC (ELECTRONIC WARFARE RADIO FREQUENCY COMPATIBILITY)
Jul 8, 2022P00064$1.1MF-16 AESA RADAR
Jun 23, 2022P00065$6.4MF-16 AESA RADAR
Jun 23, 2022P00065$17.0MF-16 AESA RADAR
Jun 14, 2022P00063$7.0MF-16 AESA RADAR
May 25, 2022P00062$1.1MF-16 AESA RADAR
May 10, 2022P00059$100.0KF-16 AESA RADAR
May 10, 2022P00061$1.6MF-16 AESA RADAR
Apr 26, 2022P00060$0F-16 AESA RADAR
Apr 12, 2022P00057$3.0MF-16 AESA RADAR
Apr 11, 2022P00054$0F-16 AESA RADAR
Mar 31, 2022P00038$1.3MF-16 AESA RADAR
Mar 31, 2022P00038$965.5KF-16 AESA RADAR
Mar 7, 2022P00048$8.8MIVEWS ELECTRONIC WARFARE RADIO FREQUENCY COMPATIBILITY
Mar 7, 2022P00048$2.2MIVEWS ELECTRONIC WARFARE RADIO FREQUENCY COMPATIBILITY
Feb 9, 2022P00053$0F-16 AESA RADAR
Feb 8, 2022P00052$0F-16 AESA ADMIN MOD
Jan 14, 2022P00051$71.9MF-16 AESA RADAR
Jan 12, 2022P00046$-71.9MF-16 AESA ADMIN MOD
Dec 16, 2021P00049$189.8MF-16 AESA RADAR
Nov 29, 2021P00050$252.2KF-16 AESA RADAR
Nov 3, 2021P00047$0AESA F-16 ADMIN MOD
Oct 22, 2021P00044$0ICS OPTION EXERCISE
Sep 28, 2021P00045$1.5MF-16 AESA RADARS
Sep 8, 2021P00043$0AESA SHIPPING LOCATIONS CHANGES
Aug 16, 2021P00041$0AESA CATCH-UP MOD
Jun 4, 2021P00042$8.9MF-16 ACTIVE ELECTRONICALLY SCANNED ARRAY (AESA) RADAR
May 21, 2021P00040$-1.2MF-16 ACTIVE ELECTRONICALLY SCANNED ARRAY (AESA) RADAR
Apr 30, 2021P00025$0F-16 ACTIVE ELECTRONICALLY SCANNED ARRAY (AESA) RADAR
Apr 20, 2021P00039$2.0MF-16 ACTIVE ELECTRONICALLY SCANNED ARRAY (AESA) RADAR
Apr 19, 2021P00035$-2.0MF-16 ACTIVE ELECTRONICALLY SCANNED ARRAY (AESA) RADAR
Mar 29, 2021P00037$259.6MF-16 ACTIVE ELECTRONICALLY SCANNED ARRAY (AESA) RADAR
Mar 16, 2021P00031$3.4MF-16 ACTIVE ELECTRONICALLY SCANNED ARRAY (AESA) RADAR
Mar 10, 2021P00036$0F-16 ACTIVE ELECTRONICALLY SCANNED ARRAY (AESA) RADAR
Feb 12, 2021P00034$11.5MFSR SUPPORT/ICS INCREASE
Feb 12, 2021P00034$282.4KFSR SUPPORT/ICS INCREASE
Dec 28, 2020P00029$173.6KF-16 ACTIVE ELECTRONICALLY SCANNED ARRAY RADAR
Dec 28, 2020P00029$415.2KF-16 ACTIVE ELECTRONICALLY SCANNED ARRAY (AESA) RADAR
Nov 16, 2020P00033$3.8MF-16 ACTIVE ELECTRONICALLY SCANNED ARRAY (AESA) RADAR
Oct 22, 2020P00032$2.0MF-16 ACTIVE ELECTRONICALLY SCANNED ARRAY (AESA) RADAR
Oct 21, 2020P00032$80.8KF-16 ACTIVE ELECTRONICALLY SCANNED ARRAY RADAR
Sep 10, 2020P00030$68.3KAESA RADARS
Aug 18, 2020A00003$0F-16 ACTIVE ELECTRONICALLY SCANNED ARRAY JOINT EMERGENT OPERATIONAL NEED
Aug 11, 2020P00028$26.7KF-16 AESA (JEON)
Jun 18, 2020P00026$9.4MECP-2 UNPRICED CHANGE ORDER
Jun 18, 2020P00026$3.6MECP-2 UNPRICED CHANGE ORDER
Apr 17, 2020ARZ998$0COVID-19 DIB. F-16 AESA JUON
Mar 27, 2020ARZ999$0COVID-19 DIB. F-16 AESA JUON
Feb 27, 2020P00027$262.3MF-16 AESA (JEON)
Dec 19, 2019PZ0012$-5.5MF-16 AESA (JEON)
Dec 19, 2019PZ0012$-3.5MF-16 AESA (JEON)
Oct 8, 2019P00024$0AESA F-16 (JEON)
Sep 25, 2019P00023$288.7KAESA F-16 (JEON)
Jul 16, 2019P00022$10.5MAESA
Jun 25, 2019P00021$0F-16 AESA (JEON)
Jun 25, 2019P00021$11.3MAESA F-16 (JEON)
Apr 30, 2019P00020$750.0KF-16 AESA (JEON)
Mar 18, 2019P00019$0F-16 AESA (JEON)
Mar 5, 2019P00018$0UPDATE DATA ASSERTIONS AND EXTEND CLIN 1007AF
Feb 8, 2019P00017$1.6MF-16 AESA (JEON)
Feb 8, 2019P00017$7.1MF-16 AESA (JEON)
Nov 28, 2018P00015$250.8KF-16 AESA (JEON)
Nov 9, 2018P00016$5.5MF-16 AESA (JEON)
Sep 28, 2018P00014$9.7MF16 AESA (JEON) INCREMENTAL FUNDING
Sep 5, 2018P00013$0PART NUMBER CHANGE
Jun 22, 2018P00011$4.9MF16 AESA (JEON)
Jun 22, 2018P00011$0F16 AESA (JEON)
May 15, 2018P00010$4.9MF-16 ACTIVE ELECTRONICALLY SCANNED ARRAY JOINT EMERGENT OPERATIONAL NEED
May 15, 2018P00010$17.0MF-16 ACTIVE ELECTRONICALLY SCANNED ARRAY JOINT EMERGENT OPERATIONAL NEED
Apr 3, 2018P00009$3.7MF-16 ACTIVE ELECTRONICALLY SCANNED ARRAY JOINT EMERGENT OPERATIONAL NEED
Apr 3, 2018P00009$1.7MF-16 ACTIVE ELECTRONICALLY SCANNED ARRAY JOINT EMERGENT OPERATIONAL NEED
Mar 30, 2018P00008$4.5MF-16 ACTIVE ELECTRONICALLY SCANNED ARRAY JOINT EMERGENT OPERATIONAL NEED
Jan 24, 2018P00007$0F-16 ACTIVE ELECTRONICALLY SCANNED ARRAY JOINT EMERGENT OPERATIONAL NEED
Jan 19, 2018P00006$5.3MF-16 ACTIVE ELECTRONICALLY SCANNED ARRAY JOINT EMERGENT OPERATIONAL NEED
Jan 19, 2018P00006$87.6MF-16 ACTIVE ELECTRONICALLY SCANNED ARRAY JOINT EMERGENT OPERATIONAL NEED
Dec 21, 2017P00005$0F-16 ACTIVE ELECTRONICALLY SCANNED ARRAY JOINT EMERGENT OPERATIONAL NEED
Dec 18, 2017P00004$45.7MF-16 ACTIVE ELECTRONICALLY SCANNED ARRAY JOINT EMERGENT OPERATIONAL NEED
Dec 8, 2017P00003$0F-16 ACTIVE ELECTRONICALLY SCANNED ARRAY JOINT EMERGENT OPERATIONAL NEED
Oct 4, 2017P00002$0F-16 ACTIVE ELECTRONICALLY SCANNED ARRAY JOINT EMERGENT OPERATIONAL NEED
Sep 26, 2017P00001$7.1MF-16 ACTIVE ELECTRONICALLY SCANNED ARRAY JOINT EMERGENT OPERATIONAL NEED
Aug 18, 2017A00001$0F-16 AESA JUON

Estimated positioning window

May 30, 2030 – Nov 30, 2030

Recompete signal:
25/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 25/100. Available recorded signals: 20 points.

Contract end 2031-05-30 (1671 days from calculation)
+5 points
1 historical awards in this buyer and category group
+0 points
204 recorded award transactions
+10 points
Latest award action: 2026-06-01
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Check the stated set-aside against the solicitation and current certifications.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.