Federal contract award

FA862019C3004

ASARS 2B OPERATIONALIZATION EMD

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeDCMA RADARS AND SENSORS
NAICS334511 — Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
PSC5841 — Radar Equipment, Airborne
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$385.0M
Current contract value$385.2M
Potential contract value / ceiling$385.2M
Start dateFeb 25, 2019
Current end dateMay 29, 2031
Potential end dateMay 29, 2031
Latest award activityMay 26, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 91 of 91 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 26, 2026A00005$0UNDEFINITIZED ORDER
Apr 29, 2026P00088$0ADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Apr 22, 2026P00087$0ADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Apr 21, 2026P00086$0ADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Apr 1, 2026A00004$0UNDEFINITIZED ORDER
Mar 31, 2026A00003$0ASARS 2B
Mar 24, 2026A00002$0UNDEFINITIZED ORDER
Mar 4, 2026A00001$0UNDEFINITIZED ORDER
Jan 29, 2026P00085$1.0MADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Dec 17, 2025P00084$0ADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Dec 15, 2025P00083$0ADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Dec 2, 2025P00081$0ADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Dec 2, 2025P00082$898.5KADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Sep 25, 2025P00080$0ADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Sep 22, 2025P00079$252.6KADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Sep 17, 2025P00078$0ADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Sep 16, 2025P00077$1.5MADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Sep 11, 2025P00076$-252.6KADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Sep 4, 2025P00075$38.7KADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Jul 24, 2025P00074$977.0KADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Jun 26, 2025P00073$-40.4KADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Jun 4, 2025P00072$35.5KADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Apr 10, 2025P00071$0ADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Apr 3, 2025P00070$2.8MADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Mar 13, 2025P00069$1.5MADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Jan 31, 2025P00068$14.0KADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Jan 15, 2025P00067$95.0KADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Dec 19, 2024P00066$0ADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Oct 17, 2024P00065$-1.2MADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Sep 9, 2024P00064$10.0KADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Sep 3, 2024P00063$3.6MADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Jul 30, 2024P00062$6.4MADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
Jul 23, 2024P00061$-8.9MADVANCED SYNTHETIC APERTURE RADAR SYSTEM (ASARS)-2B ENGINEERING MANUFACTURING DEVELOPMENT (EMD) PHASE
May 21, 2024P00059$0SENSORS ADVANCED SYNTHETIC APERTURE RADAR SYSTEM 2B PROGRAM
May 8, 2024P00057$335.0KSENSORS ADVANCED SYNTHETIC APERTURE RADAR SYSTEM 2B PROGRAM
May 1, 2024P00058$2.3MSENSORS ADVANCED SYNTHETIC APERTURE RADAR SYSTEM 2B PROGRAM
Mar 27, 2024P00056$3.8MSENSORS ADVANCED SYNTHETIC APERTURE RADAR SYSTEM 2B PROGRAM
Mar 13, 2024P00055$5.9MASARS 2B ASCP INTEGRATION
Mar 1, 2024P00054$0PROPOSAL PREP FUNDING REALIGNMENT
Feb 2, 2024P00053$0ASARS 2B ATTACHMENT UPDATES
Jan 8, 2024P00052$54.6KASARS 2B
Jan 5, 2024P00051$0ASARS 2B OPERATIONAL EMD
Dec 19, 2023P00050$4.2MASARS 2B
Nov 28, 2023P00049$668.5KASARS 2B EMD
Oct 31, 2023P00048$1.0MASARS 2B INCREMENTAL FUNDING
Sep 27, 2023P00047$75.0KASARS 2B OPERATIONALIZATION EMD
Sep 18, 2023P00046$3.7MASARS 2B OPERATIONALIZATION EMD
Jun 8, 2023P00045$45.4KASARS-1B D3P
May 4, 2023P00044$12.2MASARS-2B PRODUCTION
Apr 21, 2023P00043$4.8MASARS 2B PRODUCTION
Feb 24, 2023P00042$0ASARS EMD POP EXT AND CLIN UPDATE
Feb 14, 2023P00041$0ASARS 2B OPERATIONALIZATION EMD
Dec 16, 2022P00040$0ASARS 2B OPERATIONALIZATION EMD
Dec 7, 2022P00038$7.1MASARS 2B OPERATIONALIZATION EMD
Nov 17, 2022P00039$0ASARS 2B OPERATIONAL EMD
Oct 18, 2022P00037$13.6MASARS 2B OPERATIONAL EMD
Aug 4, 2022P00036$8.1MASARS EMD
Jul 14, 2022P00035$0ASARS 2B OPERATIONAL EMD
Jun 21, 2022P00034$24.1MASARS-2B
May 2, 2022P00033$7.3MASARS 2B OPERATIONAL EMD
Mar 30, 2022P00032$13.3MASARS 2B ARS EMD - LTC
Dec 23, 2021PZ0010$18.4MASARS 2B OPERATIONAL EMD
Dec 14, 2021P00031$6.0MASARS 2B EMD
Oct 27, 2021P00030$0ASARS 2B OPERATIONAL EMD
Sep 29, 2021P00029$1.3MASARS 2B
Aug 27, 2021P00028$4.9MASARS 2B OPERATIONAL EMD
Jun 1, 2021P00027$3.7MASARS 2B OPERATIONALIZATION EMD
May 21, 2021P00026$1.3MASARS 2B OPERATIONALIZATION EMD
Mar 24, 2021P00025$32.0MASARS 2B INCREMENTAL FUNDING
Feb 17, 2021P00021$25.2MASARS 2B OPERATIONAL EMD
Feb 5, 2021P00019$325.1KASARS 2B
Dec 21, 2020P00022$7.2MASARS 2B OPERATIONAL EMD
Dec 3, 2020P00020$-7.2MASARS 2B OPERATIONAL EMD
Oct 30, 2020P00018$802.0KASARS 2B
Oct 2, 2020P00017$-802.0KASARS 2B OPERATIONAL EMD
Sep 28, 2020P00016$0ASARS 2B OPERATIONALIZATION EMD
Jun 9, 2020P00015$240.0KADVANCED SYNTHETIC APERTURE RADAR SYSTEM 2B OPERATIONAL EMD
Jun 5, 2020P00014$87.1KADVANCED SYTHENTIC APERTURE RADAR SYSTEM 2B OPERATIONAL EMD
Jun 3, 2020P00013$-240.0KADVANCED SYNTHETIC APERTURE RADAR SYSTEM 2B OPERATIONAL EMD
Apr 18, 2020P00012$4.3MADVANCED SYNTHETIC APERTURE RADAR SYSTEM 2B OPERATIONAL EMD
Apr 7, 2020P00009$-4.3MADVANCE SYNTHETIC APERTURE RADAR SYSTEM 2B OPERATIONAL EMD
Mar 6, 2020P00011$89.3MADVANCED SYNTHETIC APERTURE RADAR SYSTEM-2B
Dec 30, 2019P00008$10.3MCOMPLETE SENSOR DESIGN AND IMPLEMENTATION
Oct 22, 2019P00007$0ASARS 2B OPERATIONALIZATION EMD
Sep 12, 2019P00006$1.2MASARS 2B OPERATIONALIZATION EMD
Jul 19, 2019P00005$5.0MRE-OBLIGATION OF FUNDS, DE-OBLIGATION OF FUNDS, SOW UPDATE
Jul 17, 2019P00004$-4.8MASARS 2B OPERATIONALIZATION EMD
Jul 9, 2019P00003$0ASARS 2B OPERATIONALIZATION EMD
Apr 9, 2019P00002$1.4MRE-OBLIGATION OF FUNDS
Apr 5, 2019P00001$-1.4MENGINEERING MANUFACTURING DEVELOPMENT
Feb 25, 20190$70.7MASARS 2B OPERATIONALIZATION EMD

Estimated positioning window

May 29, 2030 – Nov 29, 2030

Recompete signal:
40/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 40/100. Available recorded signals: 35 points.

Contract end 2031-05-29 (1670 days from calculation)
+5 points
4 historical awards in this buyer and category group
+15 points
91 recorded award transactions
+10 points
Latest award action: 2026-05-26
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.