Federal contract award

FA865019F2906

PETIC ANALYSIS, INTEGRATION AND VISIONARY SYSTEMS SCIENTIFIC RESEARCH PROGRAM

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA8650 USAF AFMC AFRL PZL AFRL/PZL
NAICS541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
PSCAC12 — NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; APPLIED RESEARCH
Parent award / vehicleFA865019D2904
Set-asideNot reported
Pricing typeCOST PLUS FIXED FEE
Obligations$28.0M
Current contract value$33.0M
Potential contract value / ceiling$57.0M
Start dateMay 13, 2019
Current end dateJun 11, 2027
Potential end dateJun 11, 2027
Latest award activityMay 6, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 68 of 68 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 6, 2026P00066$536.8KPETIC
Apr 30, 2026P00065$0PETIC
Mar 27, 2026P00064$236.2KPOWER AND THERMAL DEVELOPMENT FOR AIRCRAFT
Jan 28, 2026P00063$196.7KPOWER AND THERMAL DEVELOPMENT FOR AIRCRAFT
Jan 15, 2026P00062$220.0KPETIC ANALYSIS, INTEGRATION AND VISIONARY SYSTEMS SCIENTIFIC
Dec 15, 2025P00061$0PETIC ANALYSIS, INTERGRATION, AND VISIONARY SYSTEMS SCIENTIFIC
Dec 10, 2025P00060$153.0KPETIC ANALYSIS, INTEGRATION AND VISIONARY SYSTEMS SCIENTIFIC
Nov 21, 2025P00059$200.0KAIRCRAFT MODELING AND SIMULATION
Sep 25, 2025P00058$-226.5KANALYSIS AND INTEGRATION STUDIES
Sep 15, 2025P00057$100.0KANALYSIS AND INTEGRATION STUDIES
Sep 9, 2025P00056$270.5KTHERMAL AND POWER STUDIES
Apr 2, 2025P00055$513.8KPOWER, ENERGY, THERMAL, INTERGRATION AND CONTROL
Jan 24, 2025P00054$708.6KPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS
Oct 28, 2024P00053$779.6KPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS RESEARCH
Sep 24, 2024P00051$410.0KPOWER, ENERGY, THERMAL, INTERGRATION AND CONTROL
Sep 24, 2024P00052$74.4KPOWER, ENERGY, THERMAL, INTERGRATION AND CONTROL
Sep 4, 2024P00050$0POWER AND THERMAL SOLUTION
Jul 24, 2024P00049$142.0KPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS RESEARCH
Jul 5, 2024P00048$-100.0KPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS RESEARCH
May 21, 2024P00047$1.3MPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS RESEARCH
May 3, 2024P00046$114.2KPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS RESEARCH
Apr 19, 2024P00045$500.0KPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS RESEARCH
Apr 15, 2024P00044$636.0KPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS RESEARCH
Feb 21, 2024P00043$225.0KBOEING, LOCKHEED, OR NORTHROP DEMONSTARTION INCLUDING ENGINE
Jan 24, 2024P00042$502.0KCOMPACT POWER GENERATION UNIT
Dec 15, 2023P00041$700.0KPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS RESEARCH
Sep 20, 2023P00040$460.0KPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS
Jul 27, 2023P00039$0PETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEM RESEARCH
Jul 24, 2023P00038$654.0KPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEM RESEARCH
May 16, 2023P00037$60.0KPETIC, ANALYSIS, VISIONARY, AND SYSTEMS RESEARCH
May 3, 2023P00036$0ANALYSIS, VISIONARY, & SYSTEMS RESEARCH
May 2, 2023P00035$354.9KANALYSIS, VISIONARY, & SYSTEMS RESEARCH
Mar 23, 2023P00034$1.6MPOWER ENERGY THERMAL INTEGRATION AND CONTROLS ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS RESEARCH.
Jan 18, 2023P00033$605.7KPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS RESEARCH
Jan 5, 2023P00032$400.0KPOWER, ENERGY, THERMAL INTEGRATION AND CONTROL ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS SCIENTIFIC RESEARCH PROGRAM
Nov 30, 2022P00031$220.0KPOWER ENERGY THERMAL INTEGRATION AND CONTROLS
Nov 16, 2022P00030$75.0KPETIC ANALYSIS, VISIONARY, AND SYSTEMS RESEARCH
Oct 28, 2022P00029$300.0KPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS RESEARCH
Sep 23, 2022P00028$70.0KPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS RESEARCH
Aug 1, 2022P00027$237.5KPETIC ANALYSIS, INTEGRATION, AND VISIONARY RESEARCH
Jul 6, 2022P00026$159.0KPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS
Jun 16, 2022P00025$25.0KPETIC ANALYSIS, INTEGRATION, AND VISIONARY RESEARCH
Jun 2, 2022P00024$766.0KPETIC ANALYSIS, INTEGRATION, AND VISIONARY RESEARCH
Feb 17, 2022P00023$100.0KPETIC ANALYSIS, INTEGRATION, AND VISIONARY RESEARCH
Jan 25, 2022P00022$1.6MPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS
Dec 9, 2021P00021$0ANALYSIS, INTEGRATION AND VISIONARY SYSTEMS RESEARCH
Nov 3, 2021P00020$747.8KPOWER ENERGY THERMAL INTEGRATION AND CONTROLS
Jul 28, 2021P00019$303.1KPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS
Jul 8, 2021P00018$972.9KPETIC ANALYSIS, INTEGRATOIJN, AND VISIONARY SYSTEMS
Jun 3, 2021P00017$0MODEL ANALYSIS
Apr 14, 2021P00016$10.0KPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS
Apr 9, 2021P00015$0PETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS
Apr 1, 2021P00014$0MODEL ANALYSIS
Mar 10, 2021P00013$125.0KMODEL ANALYSIS
Mar 5, 2021P00012$1.6MPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS RESEARCH
Feb 8, 2021P00011$400.0KPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS RESEARCH
Jan 7, 2021P00010$857.3KPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS RESEARCH
Sep 24, 2020P00009$701.1KPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS RESEARCH
Aug 3, 2020P00008$1.0MPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS RESEARCH
Jun 19, 2020P00007$180.0KPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS RESEARCH
Apr 1, 2020P00006$910.0KPOWER ENERGY THERMAL INTEGRATION AND CONTROL
Feb 18, 2020P00005$0PETIC ANALYSIS, INTEGRATOIN, AND VISIONARY SYSTEMS RESEARCH
Nov 20, 2019P00004$852.2KPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS RESEARCH
Sep 19, 2019P00003$51.0KPETIC ANALYSIS, INTEGRATION, AND VISIONARY SSYTEMS RESEARCH
Sep 10, 2019P00002$1.0MPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS RESEARCH
Jun 24, 2019P00001$403.7KPETIC ANALYSIS, INTEGRATION, AND VISIONARY SYSTEMS RESEARCH
May 13, 20190$1.9MPETIC ANALYSIS, INTEGRATION AND VISIONARY SYSTEMS SCIENTIFIC RESEARCH PROGRAM
May 13, 2019P00068$310.0KPOWER, ENERGY, THERMAL, INTEGRATION AND CONTROL

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
75/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 75/100. Available recorded signals: 70 points.

Contract end 2027-06-11 (229 days from calculation)
+35 points
171 historical awards in this buyer and category group
+15 points
68 recorded award transactions
+10 points
Latest award action: 2026-05-06
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.