Federal contract award
FA865623CA004
AFFORDABLE THERMAL PROTECTION SYSTEM TO ACHIEVE CAPACITY KEY PERFORMANCE PARAMETERS (ATTACK) PROJECT
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | FA8656 AFLCMC EBX |
| NAICS | 541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) |
| PSC | 1420 — Guided Missile Components |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $2.5M |
| Current contract value | $2.5M |
| Potential contract value / ceiling | $2.5M |
| Start date | Sep 11, 2023 |
| Current end date | Dec 1, 2025 |
| Potential end date | Dec 1, 2025 |
| Latest award activity | Dec 9, 2025 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Dec 9, 2025 | P00009 | $0 | THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ACTIVITIES REQUIRED TO FABRICATE AND TEST PANELS, COMPLEX GEOMETRY COMPONENTS, AND A FULL AEROSHELL ASSEMBLY IN ACCORDANCE WITH THE STATEMENT OF OBJECTIVES, ATTACK PROJECT DATED 08 AUG 2023. |
| Aug 27, 2025 | P00008 | $0 | THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ACTIVITIES REQUIRED TO FABRICATE AND TEST PANELS, COMPLEX GEOMETRY COMPONENTS, AND A FULL AEROSHELL ASSEMBLY IN ACCORDANCE WITH THE STATEMENT OF OBJECTIVES, ATTACK PROJECT DATED 08 AUG 2023. |
| May 22, 2025 | P00007 | $181.2K | THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ACTIVITIES REQUIRED TO FABRICATE AND TEST PANELS, COMPLEX GEOMETRY COMPONENTS, AND A FULL AEROSHELL ASSEMBLY IN ACCORDANCE WITH THE STATEMENT OF OBJECTIVES, ATTACK PROJECT DATED 08 AUG 2023. |
| May 19, 2025 | P00006 | $0 | THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ACTIVITIES REQUIRED TO FABRICATE AND TEST PANELS, COMPLEX GEOMETRY COMPONENTS, AND A FULL AEROSHELL ASSEMBLY IN ACCORDANCE WITH THE STATEMENT OF OBJECTIVES, ATTACK PROJECT DATED 08 AUG 2023. |
| Apr 22, 2025 | P00005 | $544.9K | THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ACTIVITIES REQUIRED TO FABRICATE AND TEST PANELS, COMPLEX GEOMETRY COMPONENTS, AND A FULL AEROSHELL ASSEMBLY IN ACCORDANCE WITH THE STATEMENT OF OBJECTIVES, ATTACK PROJECT DATED 08 AUG 2023. |
| Jan 23, 2025 | P00004 | $280.0K | THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ACTIVITIES REQUIRED TO FABRICATE AND TEST PANELS, COMPLEX GEOMETRY COMPONENTS, AND A FULL AEROSHELL ASSEMBLY IN ACCORDANCE WITH THE STATEMENT OF OBJECTIVES, ATTACK PROJECT DATED 08 AUG 2023. |
| Oct 30, 2024 | P00003 | $0 | THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ACTIVITIES REQUIRED TO FABRICATE AND TEST PANELS, COMPLEX GEOMETRY COMPONENTS, AND A FULL AEROSHELL ASSEMBLY IN ACCORDANCE WITH THE STATEMENT OF OBJECTIVES, ATTACK PROJECT DATED 08 AUG 2023. |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.