Federal contract award

FA865623CA004

AFFORDABLE THERMAL PROTECTION SYSTEM TO ACHIEVE CAPACITY KEY PERFORMANCE PARAMETERS (ATTACK) PROJECT

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA8656 AFLCMC EBX
NAICS541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
PSC1420 — Guided Missile Components
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$2.5M
Current contract value$2.5M
Potential contract value / ceiling$2.5M
Start dateSep 11, 2023
Current end dateDec 1, 2025
Potential end dateDec 1, 2025
Latest award activityDec 9, 2025
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Dec 9, 2025P00009$0THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ACTIVITIES REQUIRED TO FABRICATE AND TEST PANELS, COMPLEX GEOMETRY COMPONENTS, AND A FULL AEROSHELL ASSEMBLY IN ACCORDANCE WITH THE STATEMENT OF OBJECTIVES, ATTACK PROJECT DATED 08 AUG 2023.
Aug 27, 2025P00008$0THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ACTIVITIES REQUIRED TO FABRICATE AND TEST PANELS, COMPLEX GEOMETRY COMPONENTS, AND A FULL AEROSHELL ASSEMBLY IN ACCORDANCE WITH THE STATEMENT OF OBJECTIVES, ATTACK PROJECT DATED 08 AUG 2023.
May 22, 2025P00007$181.2KTHE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ACTIVITIES REQUIRED TO FABRICATE AND TEST PANELS, COMPLEX GEOMETRY COMPONENTS, AND A FULL AEROSHELL ASSEMBLY IN ACCORDANCE WITH THE STATEMENT OF OBJECTIVES, ATTACK PROJECT DATED 08 AUG 2023.
May 19, 2025P00006$0THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ACTIVITIES REQUIRED TO FABRICATE AND TEST PANELS, COMPLEX GEOMETRY COMPONENTS, AND A FULL AEROSHELL ASSEMBLY IN ACCORDANCE WITH THE STATEMENT OF OBJECTIVES, ATTACK PROJECT DATED 08 AUG 2023.
Apr 22, 2025P00005$544.9KTHE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ACTIVITIES REQUIRED TO FABRICATE AND TEST PANELS, COMPLEX GEOMETRY COMPONENTS, AND A FULL AEROSHELL ASSEMBLY IN ACCORDANCE WITH THE STATEMENT OF OBJECTIVES, ATTACK PROJECT DATED 08 AUG 2023.
Jan 23, 2025P00004$280.0KTHE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ACTIVITIES REQUIRED TO FABRICATE AND TEST PANELS, COMPLEX GEOMETRY COMPONENTS, AND A FULL AEROSHELL ASSEMBLY IN ACCORDANCE WITH THE STATEMENT OF OBJECTIVES, ATTACK PROJECT DATED 08 AUG 2023.
Oct 30, 2024P00003$0THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ACTIVITIES REQUIRED TO FABRICATE AND TEST PANELS, COMPLEX GEOMETRY COMPONENTS, AND A FULL AEROSHELL ASSEMBLY IN ACCORDANCE WITH THE STATEMENT OF OBJECTIVES, ATTACK PROJECT DATED 08 AUG 2023.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.