Federal contract award

FA865625FB002

HACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA8656 AFLCMC EBX
NAICS332993 — Ammunition (except Small Arms) Manufacturing
PSC1395 — Miscellaneous Ammunition
Parent award / vehicleFA865621DA004
Set-asideNot reported
Pricing typeCOST PLUS FIXED FEE
Obligations$44.9M
Current contract value$132.7M
Potential contract value / ceiling$132.7M
Start dateOct 1, 2024
Current end dateOct 1, 2028
Potential end dateOct 1, 2028
Latest award activityApr 7, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 12 of 12 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 7, 2026P00011$19.5MHACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.
Mar 17, 2026P00010$0HACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.
Feb 13, 2026P00009$3.0MHACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.
Jan 29, 2026P00008$350.0KHACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.
Aug 25, 2025P00007$-10.0MHACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.
Aug 5, 2025P00006$0HACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.
Jul 21, 2025P00005$2.0MHACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.
Feb 4, 2025P00004$0HACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.
Dec 30, 2024P00003$0HACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.
Nov 22, 2024P00002$0HACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.
Oct 16, 2024P00001$10.0MHACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.
Oct 2, 20240$20.0MHACM REQUIRES AN INCREASE IN MANUFACTURING CAPACITY OF THE AUR AND HACM-SPECIFIC COMPONENTS TO ACHIEVE EXPECTED PRODUCTION RATES. THE ANTICIPATED FUTURE PRODUCTION NEED IS GREATER THAN WHAT THE HACM INDUSTRIAL BASE IS CURRENTLY ESTIMATED TO ACHIEVE.

Estimated positioning window

Oct 1, 2027 – Apr 1, 2028

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2028-10-01 (707 days from calculation)
+25 points
420 historical awards in this buyer and category group
+15 points
12 recorded award transactions
+10 points
Latest award action: 2026-04-07
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.