Federal contract award

FA867521C0034

ADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) PRODUCTION LOTS 34-36

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA8556 AFLCMC EBUK
NAICS336414 — Guided Missile and Space Vehicle Manufacturing
PSC1410 — Guided Missiles
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIXED PRICE INCENTIVE
Obligations$926.9M
Current contract value$927.6M
Potential contract value / ceiling$927.6M
Start dateMar 26, 2021
Current end dateJun 30, 2027
Potential end dateJun 30, 2027
Latest award activityJun 4, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 122 of 122 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 9, 2026P00081$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Jun 4, 2026P00080$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
May 13, 2026P00079$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
May 4, 2026P00078$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Apr 21, 2026P00077$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Apr 17, 2026A00023$0GFP TRANSFER PTR20251078, PTR20251126REV1, PTR20251127REV1, OTR20251125
Apr 16, 2026A00022$0GFP TRANSFER PTR20251078, PTR20251126REV1, PTR20251127REV1, OTR20251125
Apr 3, 2026P00076$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Mar 31, 2026P00075$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Mar 31, 2026P00075$76.0KADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Feb 20, 2026P00074$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Feb 12, 2026P00073$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Jan 30, 2026A00021$0GFP TRANSFER PTR20251078, PTR20251126REV1, PTR20251127REV1, OTR20251125
Jan 14, 2026P00072$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Dec 19, 2025P00071$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Dec 18, 2025A00020$0GFP TRANSFER PTR20251078, PTR20251126REV1, PTR20251127REV1, OTR20251125
Dec 16, 2025A00019$0GFP TRANSFER PTR20251078, PTR20251126REV1, PTR20251127REV1, OTR20251125
Dec 4, 2025P00070$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Nov 20, 2025P00069$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Nov 19, 2025P00068$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Nov 12, 2025P00067$18.0KADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Oct 21, 2025P00066$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Oct 15, 2025P00065$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Oct 6, 2025A00017$0GFP TRANSFER PTR20251078, PTR20251126REV1, PTR20251127REV1, OTR20251125
Oct 6, 2025A00018$0GFP TRANSFER PTR20251078, PTR20251126REV1, PTR20251127REV1, OTR20251125
Sep 23, 2025P00064$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Aug 21, 2025P00063$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Aug 1, 2025P00062$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Jul 3, 2025P00061$23.9KADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Jul 3, 2025P00061$198.1KADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Jun 11, 2025A00016$0GFP TRANSFER PTR20251078, PTR20251126REV1, PTR20251127REV1, OTR20251125
May 14, 2025P00060$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
May 9, 2025P00059$33.4KADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Apr 22, 2025P00058$298.5KADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Apr 3, 2025P00057$9.5MADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Apr 2, 2025A00015$0GFP TRANSFER PTR20251044
Mar 20, 2025P00056$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Feb 11, 2025P00055$-52.4KADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Jan 14, 2025P00054$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Jan 10, 2025P00053$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Dec 17, 2024A00012$0GFP TRANSFER
Dec 16, 2024P00052$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Nov 25, 2024P00051$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Nov 5, 2024A00011$0GFP TRANSFER
Oct 31, 2024A00010$0GFP TRANSFER
Oct 25, 2024P00050$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Oct 2, 2024P00049$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Sep 27, 2024P00048$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Aug 22, 2024P00047$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Aug 8, 2024P00046$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Jul 31, 2024P00045$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Jul 19, 2024P00044$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
May 30, 2024A00009$0GFP TRANSFER PTR20241101
May 30, 2024A00013$0GFP TRANSFER PTR20241259
May 30, 2024A00014$0GFP TRANSFER PTR20241255
May 29, 2024P00043$856.2KADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
May 29, 2024P00043$689.5KADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Apr 16, 2024A00008$0GFP TRANSFER PTR20241034
Mar 19, 2024P00042$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Mar 18, 2024A00007$0GFP TRANSFER PTR20241034
Dec 19, 2023ARZ997$0CHANGE PCO AUTHORIZATION AND RESPONSIBILITY FROM EGLIN AFB TO ROBINS AFB.
Dec 15, 2023P00041$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Nov 21, 2023P00040$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Oct 2, 2023P00039$0ADVANCE MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM)
Sep 21, 2023A00006$0GFP TRANSFER
Aug 23, 2023P00037$3.0MADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) FMS OFFSETS
Aug 23, 2023P00038$0ADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) TRANSFER TO ROBINS AFB
Jul 19, 2023P00036$7.8MADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) WAVE 11B LIFE OF TYPE BUY
Jul 19, 2023P00036$518.8KADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) WAVE 11B LIFE OF TYPE BUY
Jun 14, 2023A00005$0GFP TRANSFER
May 25, 2023P00035$0ADVANCED MEDIUM RANGE AIR-TO-AIR MISSILE: ADMINISTRATIVE CHANGE TO FUNDING
May 18, 2023P00034$0ADVANCED MEDIUM RANGE AIR-TO-AIR MISSILE: ADMINISTRATIVE CORRECTIONS
Apr 19, 2023P00033$0ADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) FUNDING CORRECTION FOR CLIN 2502, UPDATE ATTACHMENT 27: CONSOLIDATED GFP LIST
Mar 31, 2023P00032$0ADVANCED MEDIUM RANGE AIR TO AIR MISSILE - PRODUCTION DELIVERY SCHEDULE RE-BASELINE
Mar 21, 2023P00031$0ADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) CONSOLIDATED GFP LIST & FIX FUNDING CLIN 2306
Mar 21, 2023P00031$0ADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) PRODUCTION SCHEDULE RE-BASELINE
Feb 8, 2023P00030$0ADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) ESTABLISH TELEMETRY KEYLOADER GFP LIST
Jan 31, 2023P00029$2.5MADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) - WAVE11A LIFE OF TYPE BUY AND ADMINISTRATIVE UPDATES
Jan 31, 2023P00029$961.4KADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) - WAVE11A LIFE OF TYPE BUY AND ADMINISTRATIVE UPDATES
Dec 6, 2022A00004$0ADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) PRODUCTION LOTS 34-36
Nov 28, 2022P00028$0ADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) DEPOT SPARES - ADD CPU LIST AND ADMINISTRATIVE UPDATE TO ACRNS GT AND GY
Oct 27, 2022P00027$0ADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM): AMRAAM TELEMETRY SYSTEM (ATS) CLIN PERIOD OF PERFORMANCE EXTENSIONS AND ADMIN CORRECTIONS
Oct 3, 2022P00026$1.3MAMRAAM FINAL ACCEPTANCE TEST SET REPLACEMENT SPARES
Sep 22, 2022P00025$19.5MADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) LOT 36 FMS OFFSET REQUIREMENTS
Sep 14, 2022P00024$5.0MAMRAAM DEPOT SUSTAINMENT SPARES
Sep 7, 2022A00002$0ADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) PRODUCTION LOTS 34-36
Sep 7, 2022A00003$0ADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) PRODUCTION LOTS 34-36
Aug 30, 2022P00023$404.8MADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) LOT 36 OPTION EXERCISE
Aug 30, 2022P00023$567.4MADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) LOT 36 OPTION EXERCISE
Aug 26, 2022P00021$486.6KADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) - RECTIFIER FILTER ASSEMBLY (RFA) CAPTIVE AIR TRAINING MISSILE (CATM) RETROFIT
Aug 26, 2022P00021$8.4MADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) - RECTIFIER FILTER ASSEMBLY (RFA) CAPTIVE AIR TRAINING MISSILE (CATM) RETROFIT
Aug 9, 2022P00020$3.7MADVANCED MEDIUM RANGE AIR TO AIR MISSILE LIFE OF TYPE BUY
Aug 9, 2022P00020$2.1MADVANCED MEDIUM RANGE AIR TO AIR MISSILE LIFE OF TYPE BUY
Aug 8, 2022A00001$0ADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) PRODUCTION LOTS 34-36
Aug 5, 2022P00019$5.8MADVANCED MEDIUM RANGE AIR-TO-AIR MISSILE LOAD TRAINERS
Jun 27, 2022P00018$0ADVANCED MEDIUM RANGE AIR TO AIR MISSILE LOT 36 OPTION EXTENSION
Mar 18, 2022P00017$1.2MADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) DIGITAL FLIGHT TERMINATION RECEIVER HARDWARE AND WAVE 10 LIFE OF TYPE BUY
Mar 18, 2022P00017$642.9KADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) DIGITAL FLIGHT TERMINATION RECEIVER HARDWARE AND WAVE 10 LIFE OF TYPE BUY
Mar 3, 2022P00016$331.9KADVANCED MEDIUM RANGE AIR-TO-AIR MISSILE (AMRAAM) WAVE 10B LIFE OF TYPE BUY (LTB)
Mar 3, 2022P00016$813.5KADVANCED MEDIUM RANGE AIR-TO-AIR MISSILE (AMRAAM) WAVE 10B LIFE OF TYPE BUY (LTB)
Feb 28, 2022P00015$0ADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) - MULTIPLE ADMIN UPDATES: FMS FIELD SPARES, CDRLS, DELIVERY DATE CHANGES
Jan 13, 2022P00014$4.5MADVANCED MEDIUM RANGE AIR-TO-AIR MISSILE (AMRAAM) - SAASM ASIC LIFE OF TYPE BUY
Jan 13, 2022P00014$2.8MADVANCED MEDIUM RANGE AIR-TO-AIR MISSILE (AMRAAM) - SAASM ASIC LIFE OF TYPE BUY
Dec 20, 2021P00013$1.5MADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) PRODUCTION LOTS 37-39
Dec 7, 2021P00012$577.9KADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) WAVE 10 LIFE OF TYPE BUY
Dec 7, 2021P00012$595.7KADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) WAVE 10 LIFE OF TYPE BUY
Nov 18, 2021P00011$466.4KADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) TELEMETRY SPARES LIFE OF TYPE BUY
Oct 4, 2021P00010$0ADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) PRODUCTION LOTS 37-39
Sep 30, 2021P00009$698.8KADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM): -9 COMMON LAUNCHED NAVIGATION SYSTEMS (CALNS) LIFE OF TYPE BUY (LTB)
Sep 30, 2021P00009$10.3MADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM): -9 COMMON LAUNCHED NAVIGATION SYSTEMS (CALNS) LIFE OF TYPE BUY (LTB)
Sep 9, 2021P00008$12.7MADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) FMS OFFSETS FOR CANADA & NETHERLANDS
Aug 27, 2021P00007$77.1MADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) PRODUCTION LOT 35 ADDITIONAL CAPTIVE AIR TRAINING MISSILE (CATM) ALL UP ROUNDS AND GUIDANCE SECTIONS
Aug 20, 2021P00006$73.9KADVANCED MEDIUM RANGE AIR TO AIR MISSILE PROGRAM SUPPORT AND ANNUAL SUSTAINMENT
Aug 20, 2021P00006$1.9MADVANCED MEDIUM RANGE AIR TO AIR MISSILE PROGRAM SUPPORT AND ANNUAL SUSTAINMENT
Jul 28, 2021P00005$137.5MADVANCED MEDIUM RANGE AIR-TO-AIR MISSILE (AMRAAM) - EXERCISE OPTION FOR PRODUCTION LOT 35
Jul 28, 2021P00005$345.4MADVANCED MEDIUM RANGE AIR-TO-AIR MISSILE (AMRAAM) - EXERCISE OPTION FOR PRODUCTION LOT 35
Jul 1, 2021P00004$2.9MADVANCED MEDIUM RANGE AIR TO MISSILE MODIFICATION FOR PLUS FIVE ROCKET MOTORS
Jun 29, 2021P00003$4.4MADVANCED MEDIUM RANGE AIR TO AIR MISSILE LOT 34 MODIFICATION DIGITAL FTR
May 27, 2021P00002$7.9MADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) LOT 34 FOREIGN MILITARY SALES OFFSETS
May 6, 2021P00001$0ADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) FUNDING CORRECTION AND UPDATE CDRLS
Mar 26, 20210$283.6MADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) PRODUCTION LOTS 34-36
Mar 26, 20210$234.8MADVANCED MEDIUM RANGE AIR TO AIR MISSILE (AMRAAM) PRODUCTION LOTS 34-36

Estimated positioning window

Nov 1, 2026 – Jan 30, 2027

Recompete signal:
70/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 70/100. Available recorded signals: 65 points.

Contract end 2027-06-30 (241 days from calculation)
+35 points
10 historical awards in this buyer and category group
+15 points
122 recorded award transactions
+10 points
Latest award action: 2026-06-04
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.