FA867810C0100

QF-16 FULL SCALE AERIAL TARGET (FSAT)

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA8232 AFLCMC WWMK
NAICS336411 — Aircraft Manufacturing
PSC1550 — Drones
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeTIME AND MATERIALS
Obligations$31.9M
Current contract value$28.6M
Potential contract value / ceiling$26.2M
Start dateMar 8, 2010
Current end dateDec 31, 2026
Potential end dateDec 31, 2026
Latest award activityJun 2, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 378 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 2, 2026P00352$100.0KQF-16 SEPM CLINS 5006AC FUNDING UPDATE TO CLIN 5006AM, WITH ADDITIONAL ADMINISTRATIVE CHANGES TO UPDATE OPTION YEAR LANGUAGE AND SCG.
Jun 2, 2026P00535$0QF-16 CLIN 5002 REPLACE $1,792.08 OF EXPIRED FY18 FUNDS WITH $1,792.08 IN FY25 FUNDS TO PAY OUT COMPLETED WORK.
Dec 8, 2025P00351$160.0KQF-16 FSAT CLINS 500409 FUNDING UPDATE, WITH ADDITIONAL ADMINISTRATIVE CHANGES
Sep 10, 2025P00348$51.4KQF-16 FSAT CLINS 500409 FUNDING UPDATE, WITH ADDITIONAL ADMINISTRATIVE CHANGES
Sep 10, 2025P00349$2.5MQF-16 FSAT CLINS 500409 FUNDING UPDATE, WITH ADDITIONAL ADMINISTRATIVE CHANGES
Sep 10, 2025P00350$420.8KQF-16 FSAT CLINS 500409 FUNDING UPDATE, WITH ADDITIONAL ADMINISTRATIVE CHANGES
Aug 26, 2025P00346$0QF-16 FSAT CLINS 5004 OWR/BWR POP EXT, 5006 INTEGRATION ENGINEERING SUPPORT POP EXT, 5043 RF POWER METERS DELIVERY SCHEDULE UPDATE AND GRDCS-SIR/GRDCS-SIL CLIN UPDATE
Aug 26, 2025P00347$0QF-16 FSAT CLINS 5004 OWR/BWR POP EXT, 5006 INTEGRATION ENGINEERING SUPPORT POP EXT, 5043 RF POWER METERS DELIVERY SCHEDULE UPDATE AND GRDCS-SIR/GRDCS-SIL CLIN UPDATE
Jun 30, 2025P00344$45.0KQF-16 FSAT CLINS 5004 OWR/BWR POP EXT, 5006 INTEGRATION ENGINEERING SUPPORT POP EXT, 5043 RF POWER METERS DELIVERY SCHEDULE UPDATE AND GRDCS-SIR/GRDCS-SIL CLIN UPDATE
Jun 26, 2025P00343$902.0KQF-16 FSAT FLIGHT TERMINATION SYSTEM (FTS) BATTERY PHASE 3
Jun 26, 2025P00343$4.1KQF-16 FSAT FLIGHT TERMINATION SYSTEM (FTS) BATTERY PHASE 3
Jun 24, 2025P00342$7.1MQF-16 FULL SCALE AERIAL TARGET (FSAT) FLIGHT TERMINATION SYSTEM (FTS) BATTERY PHASE 2
May 29, 2025P00341$10.2MQF16 REQUEST FOR EQUITABLE ADJUSTMENT SETTLEMENT
May 1, 2025P00340$10.8KQF-16 FULL SCALE AERIAL TARGET, PROVIDE UPDATED ATCH 28 SGFP, AUTHORIZE TRANSFER OF GFP TO USN, AND ADD FUNDING TO CLIN 5
Apr 1, 2025P00339$103.1KQF-16 FULL SCALE AERIAL TARGET, TRANSFER FUNDS TO CLIN 400302 TO 5006AC AND INCREASE NTE/CEILING AMOUNT, ADD FUNDING TO CLIN 5004 AND INCREASE NTE/CEILING AMOUNT AND CORRECT UNIT OF ISSUE AND QTY CLIN 5002.
Mar 17, 2025P00338$8.5KQF-16 FULL SCALE AERIAL TARGET RF POWER METERS AND TRANSPONDER OOW REPAIR
Mar 17, 2025P00338$36.2KQF-16 FULL SCALE AERIAL TARGET RF POWER METERS AND TRANSPONDER OOW REPAIR
Feb 25, 2025P00337$0QF-16 FULL SCALE AERIAL TARGET PRE-MIGRATION FIXES
Jan 28, 2025P00336$0QF-16 FULL SCALE AERIAL TARGET TRANSFER GFP PROPERTY TO USN
Jan 17, 2025P00335$0QF-16 FULL SCALE AERIAL TARGET, CLIN 5006AH NTE AMOUNT INCREASE
Jan 15, 2025P00334$0PRE-MIGRATION TO CON-IT FIX ADMIN MOD 2
Dec 26, 2024P00333$0QF-16 FULL SCALE AERIAL TARGET, REMOVE/ADD CY FUNDING CLIN 5005 GENERAL DATA AND UPDATE ATCH 28
Dec 12, 2024P00332$0QF-16 FULL SCALE AERIAL TARGETS CLIN 5006AH ANOMALY INVESTIGATION POP EXTENSION AND ATCH 28 GFP UPDATE
Oct 22, 2024P00331$0QF-16 FULL SCALE AERIAL TARGET UPDATED ATCH 12 T&M RATES
Oct 16, 2024P00330$0QF-16 FULL SCALE AERIAL TARGET (FSAT) CLIN 5041 QF-16 DPE INSPECTION UPDATE
Sep 10, 2024P00329$0QF-16 FULL SCALE AERIAL TARGET, CLIN 5006AB POP EXTENSION, SOW UPDATE
Aug 26, 2024P00328$0QF-16 FULL SCALE AERIAL TARGET, CLIN 5031 ASTS MOD POP EXTENSION
Aug 14, 2024P00327$0QF-16 FULL SCALE AERIAL TARGET, PRE-MIGRATION TO CON-IT FIXES
Jul 29, 2024P00326$0QF-16 FULL SCALE AERIAL TARGET, ATCH 64 SOW UPDATE QF-16 ANOMALIES
Jul 2, 2024P00325$0QF-16 FULL SCALE AERIAL TARGET, INCREASE NTE AMOUNT AND POP EXTENSION CLIN 5006AH ASTS RELAY SWITCH
May 28, 2024P00324$-495.0KQF-16 FULL SCALE AERIAL TARGET, WINDOWS INVESTIGATION CLOSURE
May 14, 2024P00322$10.0KQF-16 FULL SCALE AERIAL TARGET, CLIN 5004 ADD ADDITIONAL FY24 FUNDING
May 14, 2024P00323$0QF-16 FULL SCALE AERIAL TARGET DPE NOTICE OF ESCAPE INSPECTION
May 6, 2024P00321$0QF-16 FULL SCALE AERIAL TARGET, WINDOWS INVESTIGATION POP
Apr 17, 2024P00320$13.7KQF-16 FULL SCALE AERIAL TARGET, ADD FY24 FUNDS CLIN 5004 OOW
Apr 11, 2024P00319$0QF-16 FULL SCALE AERIAL TARGET, CLIN 3013 ECP 007 NRE UPWARD OBLIGATION FOR CANCELED FUNDS
Apr 3, 2024P00318$0WINDOWS INVESTIGATION POP EXTENSION
Feb 8, 2024P00316$0QF-16 FULL SCALE AERIAL TARGET, ADD UPWARD OBLIGATION FUNDING FOR CANCELLED FUNDS ADJUSTMENT.
Feb 2, 2024P00317$13.9KQF-16 FULL SCALE AERIAL TARGET, SEPM SAD SIM PERIOD OF PERFORMANCE EXTENSION
Jan 29, 2024P00315$0SEPM SAD SIM PERIOD OF PERFORMANCE EXTENSION & INCREASE NTE
Nov 30, 2023P00314$0CLIN 5006AF WINDOWS INVESTIGATION POP EXTENSION
Nov 6, 2023P00313$0QF-16 FULL SCALE AERIAL TARGET, SEPM CLINS 5006AB TASK 6 & 7 AND 5006AC POP EXTENSIONS
Sep 28, 2023P00312$35.4KQF-16 FULL SCALE AERIAL TARGET (FSAT), ADD ADDITIONAL SAD DETONATORS
Sep 5, 2023P00311$10.2KQF-16 FULL SCLAE AERIAL TARGET, ADD FUNDING CLIN 5004 OOW/BW REPAIR AND ADD UPDATED SOW CLIN 5006AF
Aug 24, 2023P00310$-345.6KQF-16 FULL SCALE AERIAL TARGET, DECREASE CLIN 2003 TOTAL ITEM AMOUNT AND CEILING PRICE DUE TO FY CANCELING FUNDS
Aug 15, 2023P00309$0QF-16 FULL SCALE AERIAL TARGET, CLIN 5006 SEPM TASKS PERIOD OF PERFORMANCCE EXTENSIONS
Jul 27, 2023P00308$106.9KQF-16 FULL SCALE AERIAL TARGET, AUTOMATED SYSTEM TEST SET TRAILER BNC RELAY SWITCH REPLACEMENT
Jul 17, 2023P00307$-101.5KQF-16 FULL SCALE AERIAL TARGET (FSAT)
Jun 15, 2023P00306$538.5KQF-16 FULL SCALE AERIAL TARGET, CLIN 5006 NTE INCREASE, CLIN 5006AD, BURA SEPM TASK UPDATE, CLIN 5006AG BATTERY PHASE 1 INCREASE & POP EXT
Jun 8, 2023P00305$0QF-16 FULL SCALE AERIAL TARGET (FSAT), CLINS 5006AB-TASK9/5006AE POP EXTENSION AND 107T ON QF26 ANOMALY ENGINEERING SUPPORT
May 3, 2023P00304$0QF-16 FULL SCALE AERIAL TARGETS (FSAT) CLINS 5006AF/5027/5028 POP EXTENSIONS
Apr 25, 2023P00303$46.9KFULL SCALE AERIAL TARGET (FSAT), TVI OBSOLESCENCE PARTS UPDATE
Mar 16, 2023P00302$0QF-16 FULL SCALE AERIAL TARGET
Jan 11, 2023P00301$0QF-16 FULL SCALE AERIAL TARGET, EXTEND CLIN 5017 PERIOD OF PERFORMANCE
Dec 19, 2022P00300$0DRONE PECULIAR EQUIPMENT EXTENSIONS
Dec 6, 2022P00299$118.7KQF16 PECULIAR EQUIPMENT URAP
Dec 1, 2022P00298$210.3KBATTERY PHASE I RESEARCH
Oct 18, 2022P00297$704.5KQF16 DRONE PECULIAR EQUIPMENT WINDOWS INTEGRATION
Sep 16, 2022P00296$172.8KQF16 DRONE ENGINEER TASK SIMULATOR
Aug 31, 2022P00295$-364.9KQF16 DRONE PECULIAR EQUIPMENT TVI PARTS
Aug 24, 2022P00294$-474.4KQF16 DRONE PECULIAR EQUIPMENT TVI CHANGE
Aug 1, 2022P00293$1.8MAF16 DRONE PECULIAR EQUIP ENGINEER TASK
Jun 1, 2022P00292$0QF16 DRONE PECULIAR ENGINEER TASK EXTENSION
May 11, 2022P00291$125.0KEXTEND SAFE/ARM DEVICE ORDNANCE INITIATOR SIMULATOR CAPABILITY & ADD FUNDING FOR REPAIR
Apr 25, 2022P00290$0QF16 DRONE PECULIAR EQUIPMENT GFP
Mar 11, 2022P00289$0QF16 DRONE ADMIN CHANGE ADDITIONAL PROPERTY
Feb 15, 2022P00288$0QF16 DRONE PECULIAR EQUIPMENT REQ GFP
Jan 19, 2022P00287$0QF16 DRONE PECULIAR EQUIPMENT REQ GFP
Jan 18, 2022P00286$100.0KQF16 DRONE, ADD FUNDING AND EXTEND PERIOD OF PERFORMANCE FOR ENGINEERING SUPPORT
Dec 16, 2021P00285$912.1KQF-16 FULL-SCALE AERIAL TARGET (FSAT) GOVERNMENT FURNISHED PROPERTY DISPOSITION AT CECIL FIELD
Nov 12, 2021P00284$0INCORPORATE REQUISITIONED GOVERNMENT FURNISHED PROPERTY (RGFP) DATA LIST 6140
Sep 24, 2021P00283$273.1KQF16 DRONE PECULIAR EQUIPMENT LANDING ANOMALIES
Aug 25, 2021P00282$622.9KFUZE BOOSTER ADN WARHEAD ADAPTER ASSEMBLY
Jul 28, 2021P00281$-281.0KQF16 DRONE PECULIAR EQUIPMENT DEOBL AND INSPECTION CHANGE
Jun 17, 2021P00279$610.1KQF-16 FULL SCALE AERIAL TARGETS (FSAT), TVI AND URAP OBSOLESCENCE PARTS LTB
Jun 8, 2021P00278$0QF16 DRONE PECULIAR EQUIPMENT CLAUSE F004 ATCH 57 UPDATE
Jun 8, 2021P00280$0QF16 DRONE PECULIAR EQUIPMENT RFPG LIST
May 28, 2021P00277$-94.0KQF16 DRONE PECULIAR EQUIPMENT S/AD EXT DEOBL
May 25, 2021P00276$0QF16 DRONE PECULIAR EQUIPMENT RGFP LIST
Apr 30, 2021P00275$0QF-16 FULL SCALE AERIAL TARGET, CLIN 5006AB PERIOD OF PERFORMANCE EXTENSION
Apr 26, 2021P00274$0QF16 DRONE PECULIAR EQUIPMENT UPDATE ATTACHMENT LIST.
Apr 1, 2021P00273$0QF16 DRONE PECULIAR EQUIPMENT CLIN 1015 EXTENSION
Mar 31, 2021P00272$0QF16 DRONE PECULIAR EQUIPMENT UPDATE ATTACHMENT LIST
Mar 16, 2021P00271$0QF16 DRONE FULL SCALE AERIAL TARGET DFARS CLAUSE AND ATTACHMENT UPDATE
Feb 11, 2021P00270$0RGFP DATA LIST UPDATE
Feb 9, 2021P00269$0RGFP DATA LIST UPDATE
Feb 4, 2021P00268$0QF-16 FULL SCALE AERIAL TARGET,CHANGE TO EGLIN-H010 CLAUSE
Jan 14, 2021P00267$0QF-16 FULL SCALE AERIAL TARGET, CLINS 5006AB & 5010AG POP EXTENSIONS
Dec 17, 2020P00266$758.6KQF-16 FULL SCALE AERIAL TARGET SAD DELTA QUAL TEST & SUPPORT
Dec 17, 2020P00266$27.5KQF-16 FULL SCALE AERIAL TARGET SAD DELTA QUAL TEST & SUPPORT
Dec 10, 2020P00265$0QF-16 FULL SCALE AERIAL TARGET, RGFP DATA LIST UPDATE
Dec 8, 2020P00264$0QF-16 FULL SCALE AERIAL TARGET, UPDATE RGFP DATA LIST
Nov 18, 2020P00263$145.0KQF-16 FULL SCALE AERIAL TARGET, CLIN 5004 OWR FUNDS INCREASE
Nov 2, 2020P00262$0QF-16 FULL SCALE AERIAL TARGET
Oct 21, 2020P00261$0QF-16 FULL SCALE AERIAL TARGET, RGFP DATA LIST UPDATE
Oct 20, 2020P00260$0QF-16 FULL SCALE AERIAL TARGET, ADD THROTTLE QUADRANT ASSEMBLY WORK ON CLIN 5006AB.
Sep 29, 2020P00259$11.2KQF-16 FULL SCALE AERIAL TARGET, CLIN 1015 POP, CLIN 3003 VALUE/CEILING INCREASE
Sep 22, 2020P00258$0QF-16 FULL SCALE AERIAL TARGET, SECTION 889
Sep 17, 2020P00257$683.3KQF-16 FULL SCALE AERIAL TARGET, TVI REA COSTS
Sep 1, 2020P00256$0QF-16 FULL SCALE AERIAL TARGET, ENGINEERING SUPPORT FOR S/AD TEST PLANS AND PROCEDURES
Aug 26, 2020P00255$0QF-16 FULL SCALE AERIAL TARGET, RGFP DATA LIST UPDATE
Aug 13, 2020P00253$34.7KQF-16 FULL SCALE AERIAL TARGET, CLIN CEILING/VALUE INCREASE
Aug 12, 2020P00254$1.0MQF-16 FULL SCALE AERIAL TARGET, CLIN 5003 OPTION EXERCISE
Aug 5, 2020P00252$0QF-16 FULL SCALE AERIAL TARGET, RGFP DATA LIST UPDATE
Jul 21, 2020P00251$-142.8KQF-16 FULL SCLAE AERIAL TARGET, DEOB FUNDS CLIN 2006AB, FUNDS TRANSFER CLINS 1015 AND 1018
Jun 4, 2020P00249$43.2KQF-16 FULL SCALE AERIAL TARGET, CLINS 1015&5006AB POP EXTENSION, CLIN 5004 CEILING INCREASE
May 21, 2020P00250$0QF-16 FULL SCALE AERIAL TARGET, RGFP UPDATE
Mar 27, 2020ARZ999$0COVID-19 DIB. QF-16 FULL SCALE AERIAL TARGET, RGFP DATA LIST
Feb 27, 2020P00248$0QF-16 FULL SCALE AERIAL TARGET, RGFP MOD
Feb 19, 2020P00247$0QF-16 FULL SCALE AERIAL TARGETS PUBLIC PRIVATE PARTNERSHIP
Feb 4, 2020P00246$0QF-16 FULL SCALE AERIAL TARGETS RGFP DATA LIST UPDATE
Jan 13, 2020P00245$0QF-16 FULL SCALE AERIAL TARGETS RGFP DATA LIST UPDATE
Jan 10, 2020P00244$910.5KQF-16 FULL SCALE AERIAL TARGET, SAFE/ARM DEVICE (S/ADS)
Jan 10, 2020P00244$3.3MQF-16 FULL SCALE AERIAL TARGET, SAFE/ARM DEVICE (S/ADS)
Nov 26, 2019P00243$0QF-16 FULL SCALE AERIAL TARGET, RGFP DATA LIST UPDATE
Nov 15, 2019P00242$3.0MQF-16 FULL SCALE AERIAL TARGET, CLINS 3003 AND 4003 FUNDING INCREASE
Nov 4, 2019P00241$0QF-16 FULL SCALE AERIAL TARGET, RGFP DATA LIST UPDATE
Oct 9, 2019P00240$0QF-16 FULL SCALE AERIAL TARGET, RGFP DATA LIST UPDATE
Sep 27, 2019P00239$-956.0KQF-16 FULL SCALE AERIAL TARGET, DEOBLIGATION OF FY19 CANCELING FUNDS
Sep 23, 2019P00238$1.6MQF-16 FULL SCALE AERIAL TARGET, CLIN 4003 OPTION EXERCISE
Sep 12, 2019P00237$300.0KQF-16 FULL SCALE AERIAL TARGET, CLIN 3003 FUNDING INCREASE
Aug 22, 2019P00236$0QF-16 FULL SCALE AERIAL TARGET, RGFP DATA LIST UPDATE
Jul 24, 2019P00235$255.0KQF-16 FULL SCALE AERIAL TARGET, CLIN 5004 CEILING/FUNDS INCREASE
Jul 10, 2019P00234$0QF-16 FULL SCALE AERIAL TARGET, RGFP UPDATE
Jul 1, 2019P00233$76.8KQF-16 FULL SCALE AERIAL TARGET ECP-129 AND UPDATED CLAUSES FOR CLASS DEVIATION
Jun 3, 2019P00231$0QF-16 FULL SCALE AERIAL TARGET, UPDATE ATCH 28 AND 29
May 13, 2019P00232$0QF-16 FULL SCALE AERIAL TARGET, RGFP DATA LIST UPDATE
Apr 11, 2019P00230$0QF-16 FULL SCALE AERIAL TARGET UPDATE RGFP LIST ON ATTACHMENT 32
Apr 8, 2019P00229$0QF-16 FULL SCALE AERIAL TARGET- CLIN 5006AB GRDCS/SIL ENGINEER SUPPORT TASKS
Mar 29, 2019P00228$0QF-16 FULL SCALE AERIAL TARGET- SEPM POP EXTENSION/DCMA SITE
Mar 21, 2019P00227$0QF-16 FULL SCALE AERIAL TARGET, RGFP DATA LIST UPDATE
Mar 1, 2019P00226$0QF-16 FULL SCALE AERIAL TARGET, ENGINEERING SUPPORT TASK AGSS
Feb 28, 2019P00223$0QF-16 FULL SCALE AERIAL TARGET, DELIVERY SCHEDULE V12.0 REBASELINE
Feb 28, 2019P00225$0QF-16 FULL SCALE AERIAL TARGET, CLIN 1015 EFTS POP EXTENSION
Feb 27, 2019P00224$0QF-16 FULL SCALE AERIAL TARGET, UPDATE RGFP DATA LIST
Feb 1, 2019P00222$2.1MQF-16 FULL SCALE AERIAL TARGET CLIN 3003 CEILING/FUNDS INCREASE
Jan 18, 2019P00221$0QF-16 FULL SCALE AERIAL TARGET, ENGINEERING SUPPORT TASKS
Jan 14, 2019P00220$0QF-16 FULL SCALE ARIEL TARGET, RGFP
Jan 10, 2019P00219$0QF-16 FULL SCALE AERIAL TARGET, CLIN 1020 POP EXTENSION
Dec 26, 2018P00218$450.0KQF - 16 FSAT, ENGINEERING SUPPORT
Dec 12, 2018P00217$0QF-16 FULL SCALE ARIEL TARGET, RGFP
Nov 19, 2018P00216$0QF-16 FULL SCALE AERIIAL TARGET, UPDATE RGFP DATA LIST
Oct 31, 2018P00215$0QF-16 EGLIN-H010 CLAUSE, POP EXTENSION, CDRLS DELETION
Oct 29, 2018P00214$0QF-16 FULL SCALE AERIAL TARGET (FSAT)
Oct 25, 2018P00213$0QF-16 FULL SCALE AERIAL TARGET, RGFP DATA LIST UPDATE
Oct 3, 2018P00212$0QF-16 FULL SCALE AERIAL TARGET, RGFP DATA LIST UPDATE
Sep 28, 2018P00211$1.2MQF-16 FULL SCALE AERIAL TARGET, CLIN 2003 FUNDS INCREASE, 4006AB TASK 4 POP/INCREASE NTE VALUE, CDRL D052 UPDATE
Sep 14, 2018A00002$-877.2KQF-16 FULL SCALE AERIAL TARGET, RGFP DATA LIST
Sep 10, 2018P00210$0QF-16 FULL SCALE AERIAL TARGET, RGFP DATA LIST
Aug 23, 2018P00209$0QF-16 FULL SCALE AERIAL TARGET, UPDATE EGLIN-H010 CLAUSE
Aug 15, 2018P00208$0QF-16 FULL SCALE AERIAL TARGET, RGFP DATA LIST
Jul 27, 2018P00207$0QF-16 AERIAL TARGET POP CHANGE TO CLIN 1020 DR CLEANUP
Jul 26, 2018P00206$500.0KQF-16 FULL SCALE AERIAL TARGET, INCREASE CLIN 2003 CEILING
Jul 17, 2018P00205$0QF-16 FULL SCALE AERIAL TARGET, RGFP DATA LIST
Jul 11, 2018P00204$199.4KQF-16 FULL SCALE AERIAL TARGET AUTOMATIC FLIGHT CONTROL COMPUTER OBSOLESCENCE #3
Jun 26, 2018P00203$0QF-16 FULL SCALE AERIAL TARGET, RGFP DATA LIST
Jun 8, 2018P00202$700.0KQF-16 FULL SCALE AERIAL TARGET, INCREASE CLIN'S 2003 CEILING
Jun 5, 2018P00201$0QF-16 FULL SCALE AERIAL TARGET, RGFP DATA LIST UPDATE
May 16, 2018P00200$0QF-16 FULL SCALE AERIAL TARGET, RGFP DATA LIST UPDATE
May 9, 2018P00199$500.0KQF-16 FULL SCALE AERIAL TARGET, INCREASE NTE CEILING CLIN 2003
May 2, 2018P00198$0QF-16 FULL SCALE AERIAL TARGET, UPDATE RGFP DATA LIST
Apr 19, 2018P00197$0QF-16 FULL SCALE AERIAL TARGET, RGFP DATA LIST UPDATE
Apr 18, 2018P00196$0QF-16 FULL SCALE AERIAL TARGET, ADD WAWF ACCEPTANCE INFORMATION SECTION B, LOT 2-5
Apr 10, 2018P00195$0QF-16 FULL SCALE AERIAL TARGET, QF-006 ACCIDENT INVESTIGATION ENGINEERING SUPPORT TASK
Apr 6, 2018P00194$0QF-16 FULL SCALE AERIAL TARGET (FSAT), UPDATE RGFP DATA LIST
Mar 28, 2018P00193$0QF-16 FULL SCALE AERIAL TARGET (FSAT), UPDATE RGFP DATA LIST
Mar 27, 2018P00192$0QF-16 FULL SCALE AERIAL TARGET, ADD FLY AWAY KIT TASK TO CLIN 4006AB POP CHANGE TO CLIN 1020 DR CLEANUP
Mar 5, 2018P00191$0QF-16 FULL SCALE AERIAL TARGET
Feb 28, 2018P00190$570.0KQF-16 FULL SCALE AERIAL TARGET
Feb 13, 2018P00187$0QF-16 FULL SCALE AERIAL TARGET (FSAT), ADD ENGINEERING SUPPORT TASK
Feb 13, 2018P00188$0QF-16 FULL SCALE AERIAL TARGET(FSAT), UPDATE RGFP DATA LIST
Feb 13, 2018P00189$1.2MQF-16 FULL SCALE AERIAL TARGET AUTOMATIC FLIGHT CONTROL COMPUTER OBSOLESCENCE #2
Feb 1, 2018P00186$0QF-16 FULL SCALE AERIAL TARGET, ADD ENGINEERING SUPPORT TASKS
Jan 26, 2018P00185$0QF-16 FULL SCALE AERIAL TARGET (FSAT), CORRECT SECTION F DODAACS
Jan 18, 2018P00184$0QF-16 FULL SCALE AERIAL TARGET (FSAT) , UPDATE ATTACH 32 RGFP
Jan 11, 2018P00183$0QF-16 FULL SCALE AERIAL TARGET (FSAT) , UPDATE ATTACH 32 RGFP
Dec 21, 2017P00182$0QF-16 FULL SCALE AERIAL TARGET (FSAT)
Dec 7, 2017P00181$0QF-16 FULL SCALE AERIAL TARGET (FSAT) , UPDATE ATTACH 32 RGFP
Dec 6, 2017P00179$400.0KQF-16 FULL SCALE AERIAL TARGET (FSAT)/ INCREASE CLIN 2003 NOT TO EXCEED(NTE)VALUE AND CEILING PRICE
Dec 6, 2017P00180$425.0KQF-16 FULL SCALE AERIAL TARGET (FSAT)
Dec 1, 2017P00178$0QF-16 FULL SCALE AERIAL TARGET (FSAT) RFV-007, WING PYLON DISCONNECT WIRING APPROVAL/CONSIDERATION MOD
Nov 15, 2017P00177$0QF-16 FULL SCALE AERIAL TARGET (FSAT)
Nov 13, 2017P00176$11.3MQF-16 FULL SCALE AERIAL TARGET (FSAT) LOT 5B OPTION
Nov 6, 2017P00175$0QF-16 FULL SCALE AERIAL TARGET (FSAT)
Oct 17, 2017P00174$0QF-16 FULL SCALE AERIAL TARGET (FSAT)
Oct 13, 2017P00173$0QF-16 FULL SCALE AERIAL TARGET(FSAT/DR CLEANUP POP EXTENSION
Sep 28, 2017P00172$0QF-16 FULL SCALE AERIAL TARGET (FSAT)
Sep 6, 2017P00171$0QF-16 FULL SCALE AERIAL TARGET (FSAT)
Sep 1, 2017P00170$397.3KQF-16 FULL SCALE AERIAL TARGET (FSAT)
Aug 18, 2017P00169$0QF-16 FULL SCALE AERIAL TARGET (FSAT)
Aug 9, 2017P00168$0QF-16 FULL SCALE AERIAL TARGET (FSAT)
Jul 26, 2017P00167$0QF-16 FULL SCALE AERIAL TARGET (FSAT)
Jul 24, 2017P00166$0QF-16 FULL SCALE AERIAL TARGET (FSAT)
Jun 30, 2017P00165$1.3MQF-16 FULL SCALE AERIAL TARGET (FSAT), AFFF INCIDENT REPAIRS
Jun 27, 2017P00164$0QF-16 FULL SCALE AERIAL TARGET (FSAT)
Jun 20, 2017P00163$0QF-16 FULL SCALE AERIAL TARGET (FSAT)
Jun 12, 2017P00162$0QF-16 FULL SCALE AERIAL TARGET (FSAT)
Jun 8, 2017P00161$1.6MQF-16 FULL SCALE AERIAL TARGET (FSAT)
Jun 6, 2017P00160$0QF-16 FULL SCALE AERIAL TARGET (FSAT)
Jun 1, 2017P00159$0QF-16 FULL SCALE AERIAL TARGET (FSAT)

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
55/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 55/100. Available recorded signals: 50 points.

Contract end 2026-12-31 (67 days from calculation)
+35 points
0 historical awards in this buyer and category group
+0 points
378 recorded award transactions
+10 points
Latest award action: 2026-06-02
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.