Federal contract award

FA873018C0001

JAPAN AWACS MISSION COMPUTING UPGRADE (MCU) INSTALLATION&CHECKOUT (I&CO)

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA2363 FMS AWACS AFLCMC/HBI
NAICS336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing
PSC5895 — Miscellaneous Communication Equipment
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIXED PRICE INCENTIVE
Obligations$244.0M
Current contract value$306.8M
Potential contract value / ceiling$496.1M
Start dateFeb 12, 2018
Current end dateAug 17, 2029
Potential end dateAug 17, 2029
Latest award activityMay 29, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 95 of 95 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 29, 2026P00082$2.7MJAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
May 19, 2026P00083$1.6MJAPAN AIRBORNE WARNING AND CONTROL SYSTEM DESIGN AND PRODUCTION
Apr 16, 2026P00081$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Apr 15, 2026P00079$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM (AWACS) MISSION COMPUTING UPGRADE (MCU) DESIGN AND PRODUCTION (D&P)
Apr 15, 2026P00080$-1.6MJAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Apr 10, 2026P00078$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Mar 26, 2026P00076$5.7MJAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Mar 5, 2026P00069$0MCU
Feb 20, 2026P00077$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Dec 18, 2025P00074$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Oct 28, 2025P00072$2.1MJAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Oct 28, 2025P00073$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Oct 15, 2025P00071$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Sep 23, 2025A00020$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Sep 8, 2025P00070$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHEK OUT
Aug 22, 2025P00067$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Aug 19, 2025P00068$2.3MJAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHEK OUT
Jul 15, 2025P00063$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECKOUT
Jul 15, 2025P00065$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Jul 10, 2025P00066$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Jun 26, 2025P00062$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Jun 25, 2025P00056$1.6MJAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Jun 20, 2025P00059$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Jun 13, 2025P00061$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Apr 23, 2025P00060$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Apr 8, 2025P00058$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Mar 13, 2025P00057$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Mar 3, 2025P00055$42.0MJAPAN AIRBORNE WARNING & CONTROL SYSTEM (JAWACS) MISSION COMPUTING UPGRADE INSTALLATION & CHECKOUT (MCU I&CO) AIRCRAFT #3 & #4
Feb 4, 2025A00018$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Jan 22, 2025P00054$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Jan 15, 2025P00053$-19.4KJAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Nov 27, 2024P00052$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Nov 13, 2024P00051$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Nov 12, 2024P00049$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Nov 7, 2024P00050$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Aug 14, 2024P00045$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Aug 13, 2024P00048$1.0MJAPAN AIRBORNE WARNING AND CONTROL SYSTEMS MISSION COMPUTING UPGRADE INSTALLATION AND CHECKOUT
Aug 7, 2024P00040$0JAPAN AIRWORTHINESS AND COMMUNICATION MISSION COMPUTING UPGRADE (MCU) INSTALLATION AND CHECK OUT (ICO)
Jul 29, 2024P00047$419.9KJAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Jul 25, 2024P00038$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Jun 10, 2024P00046$758.0KJAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Mar 14, 2024P00043$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Mar 6, 2024P00042$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Feb 23, 2024P00041$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Jan 5, 2024P00039$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Dec 21, 2023P00037$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECKOUT
Nov 16, 2023P00036$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Oct 25, 2023P00035$0JAPAN E 767 AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT.
Sep 29, 2023P00031$1.3MJAPAN E-767 AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECKOUT
Aug 11, 2023P00034$4.5MJAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECKOUT
Aug 9, 2023P00033$1.7MJAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECKOUT
Feb 13, 2023P00030$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECKOUT
Jan 25, 2023A00016$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Sep 7, 2022P00029$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECKOUT.
Aug 31, 2022P00028$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECKOUT
Aug 26, 2022A00015$0JAPAN AWACS MISSION COMPUTING UPGRADE (MCU) INSTALLATION & CHECKOUT (I&CO). MOD A00015 INCORPORATES CLASS DEVIATION 2022-O0006, "REPORTING INVENTORY DISPOSAL SCHEDULES," PUBLISHED BY OSD ON NOVEMBER 17, 2021.
Jul 19, 2022A00014$0JAPAN AWACS MISSION COMPUTING UPGRADE (MCU) INSTALLATION&CHECKOUT (I&CO)
Jun 21, 2022A00013$0JAPAN AWACS MISSION COMPUTING UPGRADE (MCU) INSTALLATION&CHECKOUT (I&CO)
May 23, 2022P00027$1.4MJAPAN AIRBORNE WARNING AND CONTROL SYSTEM (AWACS) MISSION COMPUTING UPGRADE (MCU) INSTALLATION AND CHECKOUT (I&CO)
May 19, 2022P00026$-5.0MJAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECKOUT
Feb 11, 2022P00025$3.2MJAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Nov 2, 2021P00024$996.4KJAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Sep 2, 2021A00012$0JAPAN AWACS MCU I&CO
Sep 2, 2021P00023$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECKOUT.
Aug 18, 2021A00011$0JAPAN AWACS MCU I&CO
Jun 24, 2021P00022$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECKOUT.
Jun 17, 2021A00008$0JAPAN AWACS MCU I&CO
May 6, 2021P00021$2.2MJAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECKOUT.
Apr 28, 2021P00020$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECKOUT
Apr 22, 2021A00007$0JAPAN AWACS MCU I&CO
Apr 7, 2021A00006$0JAPAN AWACS MCU I&CO
Apr 5, 2021P00019$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM (AWACS) MISSION COMPUTING UPGRADE (MCU) INSTALLATION AND CHECKOUT (I&CO)
Feb 11, 2021A00005$0JAPAN AWACS MCU I&CO
Feb 11, 2021A00009$0JAPAN AWACS MCU I&CO
Feb 11, 2021A00010$0JAPAN AWACS MCU I&CO
Jan 19, 2021P00018$3.1MJAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECKOUT
Dec 31, 2020P00017$2.1MJAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPRADE INSTALLATION AND CHECKOUT
Dec 22, 2020A00004$0JAPAN AWACS MCU I&CO
Nov 25, 2020P00016$1.9MJAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECKOUT
Oct 14, 2020P00015$2.2MJAPAN AIRBORNE WARNING AND CONTROL SYSTEM (AWACS) MISSION COMPUTING UPGRADE (MCU) INSTALLATION AND CHECKOUT (I&CO)
Sep 2, 2020P00014$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM (AWACS) MISSING COMPUTING UPGRADE (MCU) INSTALLATION AND CHECKOUT (I&CO)
Aug 5, 2020A00003$0JAPAN AWACS MISSION COMPUTING UPGRADE (MCU) INSTALLATION&CHECKOUT (I&CO)
Jun 23, 2020P00005$8.5MJAPAN AIR SELF-DEFENSE FORCE MODERNIZATION COMPUTING UPGRADE INSTALLATION AND CHECKOUT, AUTOMATIC DEPENDENT SURVEILLANCE-BROADCAST OUT
Jun 23, 2020P00013$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM INSTALLATION AND CHECKOUT DCN ADDRESS
May 1, 2020P00011$0JAPAN AIRBORNE EARLY WARNING AND CONTROL SYSTEM INSTALLATION AND CHECK OUT
Apr 27, 2020P00012$0JAPAN AIRBORNE WARNING AND CONTROL SYSTEM MISSION COMPUTING UPGRADE INSTALLATION AND CHECK OUT
Apr 7, 2020A00002$0JAPAN AWACS INSTALLATION&CHECKOUT (I&CO). DUE TO DIRECTION FROM ACTING PRINCIPAL DIRECTOR DEF PRICING&CONTRACTING REGARDING COVID19, THE MOD INCREASED THE PROGRESS PAYMENT&LIQ. RATES FROM 80% TO 90% FOR BOEING, A LARGE BUSINESS CONCERN.
Jan 14, 2020P00009$2.0MJAPAN AWACS MCU I&CO UCO#1 DEFINITIZATION
Jan 14, 2020P00010$21.4MJAPAN AWACS MISSION COMPUTING UPGRADE (MCU) INSTALLATION&CHECKOUT (I&CO)
Aug 1, 2019P00003$12.0MJAPAN AWACS MISSION COMPUTING UPGRADE (MCU) INSTALLATION AND CHECKOUT (I&CO) TIME AND MATERIAL (T&M) RATES
Apr 26, 2019P00008$0JAPAN AWACS MISSION COMPUTING UPGRADE (MCU) INSTALLATION&CHECKOUT (I&CO)
Jan 9, 2019P00004$0JAPAN AWACS MISSION COMPUTING UPGRADE (MCU) INSTALLATION&CHECKOUT (I&CO) - ADD ATTACHMENT #20
Mar 29, 2018P00002$0JAPAN AWACS MISSION COMPUTING UPGRADE INSTALLATION AND CHECKOUT
Mar 28, 2018P00001$64.8MJAPAN AWACS MISSION COMPUTING UPGRADE INSTALLATION AND CHECKOUT
Feb 12, 20180$57.0MJAPAN AWACS MISSION COMPUTING UPGRADE (MCU) INSTALLATION&CHECKOUT (I&CO)

Estimated positioning window

Aug 17, 2028 – Feb 17, 2029

Recompete signal:
35/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 35/100. Available recorded signals: 30 points.

Contract end 2029-08-17 (1027 days from calculation)
+15 points
1 historical awards in this buyer and category group
+0 points
95 recorded award transactions
+10 points
Latest award action: 2026-05-29
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.