Federal contract award

FA880710C0001

GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA8807 MIL COMM AND PNT SSC/CGK
NAICS541712
PSCAC27 — R&D- DEFENSE SYSTEM: MISSILE/SPACE SYSTEMS (COMMERCIALIZED)
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS AWARD FEE
Obligations$276.5M
Current contract value$864.7M
Potential contract value / ceiling$864.7M
Start dateFeb 25, 2010
Current end dateMar 31, 2027
Potential end dateMar 31, 2027
Latest award activityMay 14, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 200 of 596 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 14, 2026P00494$10.3MNEXT GENERATION OPERATIONAL CONTROL SYSTEM BLOCK 1
May 6, 2026P00493$0ADDING SATELLITE SPECIFICATIONS
Apr 20, 2026P00492$0NEXT GENERATION OPERATIONAL CONTROL SYSTEM.
Apr 1, 2026P00489$0NEXT GENERATION OPERATIONAL SUPPORT
Mar 31, 2026P00490$9.0MNEXT GENERATION OPERATIONAL CONTROL SYSTEM
Mar 23, 2026P00488$2.1MNEXT GENERATION OPERATIONAL CONTROL SYSTEM
Mar 18, 2026P00487$0NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Feb 25, 2026P00486$13.5MNEXT GENERATION OPERATIONAL CONTROL SYSTEM
Feb 25, 2026P00486$1.4MNEXT GENERATION OPERATIONAL CONTROL SYSTEM
Feb 23, 2026P00484$0NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Jan 20, 2026P00483$0NEXT GENERATION OPERATIONAL CONTROL
Dec 11, 2025P00482$11.5MGPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2
Dec 11, 2025P00482$319.3KGPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2
Dec 8, 2025P00481$0ADDING SATELLITE SPECIFICATIONS
Dec 2, 2025P00480$23.3MNEXT GENERATION OPERATIONAL CONTROL SEGMENT
Dec 2, 2025P00480$5.6MNEXT GENERATION OPERATIONAL CONTROL SEGMENT
Nov 25, 2025P00473$0NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Nov 20, 2025P00479$12.0MNEXT GENERATION OPERATIONAL CONTROL SYSTEM
Nov 5, 2025P00478$4.9MNEXT GENERATION OPERATIONAL CONTROL SYSTEM
Oct 20, 2025P00476$3.4MNEXT GENERATION OPERATIONAL SYSTEM
Oct 1, 2025P00475$0NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Sep 22, 2025P00471$375.0KADDING SATELLITE SPECIFICATIONS
Sep 22, 2025P00472$0NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Sep 8, 2025P00470$3.7MADDING SATELLITE SPECIFICATIONS
Aug 29, 2025P00468$22.7MGPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2
Aug 29, 2025P00469$0NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Aug 25, 2025P00467$0GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2
Aug 11, 2025P00465$-999ADDING SATELLITE SPECIFICATIONS
Aug 11, 2025P00465$68.2KADDING SATELLITE SPECIFICATIONS
Aug 6, 2025P00466$0ADDING SATELLITE SPECIFICATIONS
Jul 29, 2025P00464$0ADDING SATELLITE SPECIFICATIONS
Jul 17, 2025P00463$9.5MGPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2
Jul 17, 2025P00463$5.5MGPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2
Jul 1, 2025P00461$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Jun 26, 2025P00462$2.2MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Jun 26, 2025P00462$3.9MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Jun 17, 2025P00460$-1.6MGPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2
Jun 17, 2025P00460$1.6MGPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2
Jun 12, 2025P00459$0NEXT GENERATION OPERATIONAL CONTROL SYSTEM INTERIM CONTRACTOR SUPPORT
May 28, 2025P00458$0NEXT GENERATION OPERATIONAL CONTROL SYSTEM
May 23, 2025P00457$41.3MADDING SATELLITE SPECIFICATIONS
May 23, 2025P00457$1.6MADDING SATELLITE SPECIFICATIONS
May 22, 2025P00454$0INTERIM CONTRACTOR SUPPORT
May 6, 2025P00456$3.6MGLOBAL POSITIONING SYSTEM ADVANCED CONTROL SEGMENT PHASE B BLOCKS 1 AND 2
Apr 25, 2025P00455$-1.6MGLOBAL POSITIONING SYSTEM ADVANCED CONTROL SEGMENT PHASE B BLOCKS 1 AND 2
Apr 25, 2025P00455$1.6MGLOBAL POSITIONING SYSTEM ADVANCED CONTROL SEGMENT PHASE B BLOCKS 1 AND 2
Apr 14, 2025P00449$0ADDING SATELLITE SPECIFICATIONS
Mar 27, 2025P00452$0GLOBAL POSITIONING SYSTEM ADVANCED CONTROL SEGMENT PHASE B BLOCKS 1 AND 2ADMINISTRATIVE CLAUSE UPDATES FOR NEXT GENERATION OPERATIONAL CONTROL SYSTEM.
Mar 26, 2025P00451$0GLOBAL POSITIONING SYSTEM ADVANCED CONTROL SEGMENT PHASE B BLOCKS 1 AND 2
Mar 20, 2025P00453$30.3MADDING SATELLITE SPECIFICATIONS
Mar 5, 2025P00447$0ADDING SATELLITE SPECIFICATIONS
Mar 3, 2025P00442$573.6KGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Feb 25, 2025P00448$3.1MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Feb 14, 2025P00446$2.7MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Feb 12, 2025P00445$-3.1MADDING SATELLITE SPECIFICATIONS
Feb 5, 2025P00444$500.0KADDING SATELLITE SPECIFICATIONS
Feb 5, 2025P00444$10.5MADDING SATELLITE SPECIFICATIONS
Jan 30, 2025P00443$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Jan 15, 2025P00441$0ADDING SATELLITE SPECIFICATIONS
Dec 23, 2024P00440$1.4MADDING SATELLITE SPECIFICATIONS
Dec 23, 2024P00440$11.2MADDING SATELLITE SPECIFICATIONS
Nov 27, 2024P00439$21.0MINTERIM CONTRACTOR SUPPORT (ICS) UNPRICED CHANGE ORDER (UCO)
Nov 20, 2024P00438$4.3MADDING SATELLITE SPECIFICATIONS
Nov 18, 2024P00438$16.0MADDING SATELLITE SPECIFICATIONS
Oct 30, 2024P00437$8.9MADDING SATELLITESSPECIFICATIONS
Oct 30, 2024P00437$9.1MADDING SATELLITE SPECIFICATIONS
Oct 21, 2024P00436$0NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Oct 1, 2024P00434$6.6MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS.
Oct 1, 2024P00434$19.4MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS.
Sep 27, 2024P00435$-2.3MNEXT GENERATION OPERATIONAL CONTROL SYSTEM.
Sep 16, 2024P00429$0NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Sep 13, 2024P00433$0NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Sep 6, 2024P00432$13.5KNEXT GENERATION OPERATIONAL CONTROL SYSTEM
Sep 6, 2024P00432$8.9MNEXT GENERATION OPERATIONAL CONTROL SYSTEM
Aug 29, 2024P00431$3.3MNEXT GENERATION OPERATIONAL CONTROL SYSTEM
Aug 26, 2024P00430$-248.6KGPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2
Aug 26, 2024P00430$248.6KADDING SATELLITE SPECIFICATIONS
Aug 19, 2024P00428$915.0KADDING SATELLITE SPECIFICATIONS
Aug 19, 2024P00428$2.0MADDING SATELLITE SPECIFICATIONS
Aug 7, 2024P00427$1.0MADDING SATELLITE SPECIFICATIONS
Aug 7, 2024P00427$9.1MADDING SATELLITE SPECIFICATIONS
Jul 29, 2024P00426$0ADDING SATELLITE SPECIFICATIONS
Jul 3, 2024P00425$13.9MNEXT GENERATION OPERATIONAL CONTROL SEGMENT. ADDING SATELLITE SPECIFICATIONS. CLIN 0102 PROVISIONAL OVERRUN
Jun 24, 2024P00424$0NEXT GENERATION OPERATIONAL CONTROL SEGMENT ADDING SATELLITE SPECIFICATIONS.
May 29, 2024P00423$2.2MNEXT GENERATION OPERATIONAL CONTROL SEGMENT ADDING SATELLITE SPECIFICATIONS
May 29, 2024P00423$23.7MNEXT GENERATION OPERATIONAL CONTROL SEGMENT ADDING SATELLITE SPECIFICATIONS
May 16, 2024P00422$13.1MNEXT GENERATION OPERATIONAL CONTROL SEGMENT
May 2, 2024P00421$781.9KGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS.
Apr 29, 2024P00420$11.5MADDING SATELLITE SPECIFICATIONS
Apr 23, 2024P00419$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS.
Mar 28, 2024P00418$11.1MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS.
Feb 28, 2024P00417$4.7MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS
Feb 28, 2024P00417$15.2MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS
Feb 5, 2024P00416$11.9MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS.
Jan 24, 2024P00415$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS
Dec 21, 2023P00414$2.5MADDING SATELLITE SPECIFICATIONS
Dec 21, 2023P00414$19.4MADDING SATELLITE SPECIFICATIONS
Dec 18, 2023P00413$0NEXT GENERATION OPERATIONAL CONTROL
Nov 29, 2023P00411$0NEXT GENERATION OPERATIONAL CONTROL
Nov 21, 2023P00412$4.6MNEXT GENERATION OPERATIONAL CONTROL
Nov 6, 2023P00410$2.7MNEXT GENERATION OPERATIONAL CONTROL
Oct 11, 2023P00409$0NEXT GENERATION OPERATIONAL CONTROL
Sep 28, 2023P00408$0ADDING SATELLITE SPECIFICATIONS
Sep 26, 2023A00005$-83.5KDE-OBLIGATING FY23 CANCELING FUNDS ACRN AY
Sep 22, 2023P00407$3.0MADDING SATELLITE SPECIFICATIONS
Sep 15, 2023P00406$28.5MADDING SATELLITE SPECIFICATIONS
Aug 28, 2023A00004$-4.4MGPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2
Jul 26, 2023P00405$28.6MADDING SATELLITE SPECIFICATIONS
Jul 13, 2023P00404$276.7KADDING SATELLITE SPECIFICATIONS
Jun 29, 2023P00403$0ADDING SATELLITE SPECIFICATIONS
Jun 21, 2023P00402$-2.5MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Jun 21, 2023P00402$2.5MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Jun 8, 2023P00401$6.9MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
May 11, 2023P00400$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
May 5, 2023P00399$917.3KNEXT GENERATION OPERATIONAL CONTROL SEGMENT
Apr 28, 2023P00398$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Apr 7, 2023P00396$0GLOBAL POSITIONAL SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Apr 6, 2023P00395$0ADDING SATELLITE SPECIFICATIONS
Mar 30, 2023P00397$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Mar 20, 2023P00394$41.0MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SEGMENT
Mar 15, 2023P00393$1.1MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SEGMENT
Mar 15, 2023P00393$17.3MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SEGMENT
Mar 8, 2023P00392$15.0MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL
Feb 28, 2023P00391$11.0MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL
Feb 24, 2023P00390$0ADDING SATELLITE SPECIFICATIONS
Feb 1, 2023A00003$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL
Jan 31, 2023P00389$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL
Jan 10, 2023P00388$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Dec 21, 2022P00387$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Dec 20, 2022P00386$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Dec 12, 2022P00385$15.7MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Dec 6, 2022P00384$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Nov 23, 2022P00383$455.4KGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Nov 18, 2022P00382$4.6MADDING SATELLITE SPECIFICATIONS
Nov 1, 2022P00380$3.0MNEXT GENERATION OPERATIONAL CONTROL SEGMENT (OCX)
Nov 1, 2022P00380$23.7MNEXT GENERATION OPERATIONAL CONTROL SEGMENT (OCX)
Oct 31, 2022P00381$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SEGMENT
Oct 26, 2022P00378$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS
Oct 26, 2022P00379$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SEGMENT
Sep 20, 2022A00002$-161.6KGPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2
Sep 8, 2022P00377$13.4MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Sep 1, 2022P00376$0ADDING SATELLITE SPECIFICATIONS
Aug 29, 2022P00375$5.3MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Aug 19, 2022P00374$5.3MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM.
Aug 19, 2022P00374$427.8KGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM.
Aug 12, 2022P00373$-1.2MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Jul 29, 2022P00372$0NEXT GENERATION OPERATIONAL CONTROL SEGMENT
Jun 30, 2022P00370$0NEXT GENERATION OPERATIONAL CONTROL SEGMENT
Jun 21, 2022P00371$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL
May 31, 2022P00369$5.9MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL
May 31, 2022P00369$62.4MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL
May 24, 2022P00368$5.0MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
May 5, 2022P00367$978.8KGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
May 5, 2022P00367$14.0MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
May 3, 2022P00364$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Apr 26, 2022P00366$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Apr 18, 2022P00365$1.3MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM
Mar 30, 2022P00363$989.8KGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM
Mar 30, 2022P00363$12.9MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM
Mar 15, 2022P00362$967.8KGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM
Mar 15, 2022P00362$14.4MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM
Mar 7, 2022P00361$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM
Dec 30, 2021P00360$22.5MGLOBAL POSITIONING SYSTEM GROUND SUPPORT CERTIFICATE OF CONFORMANCE INCENTIVE FEE AWARD GLOBAL POSITIONING SYSTEM GROUND SUPPORT.
Dec 17, 2021P00358$0GLOBAL POSITIONING SYSTEM GROUND SUPPORT
Dec 17, 2021P00359$14.1MCERTIFICATE OF CONFORMANCE INCENTIVE FEE AWARD GLOBAL POSITIONING SYSTEM GROUND SUPPORT.
Dec 14, 2021P00357$4.0MGLOBAL POSITIONING SYSTEM GROUND SUPPORT
Dec 13, 2021P00356$0GLOBAL POSITIONING SYSTEM GROUND SUPPORT
Nov 17, 2021P00355$0GLOBAL POSITIONING SYSTEM GROUND SUPPORT
Nov 5, 2021P00354$0GLOBAL POSITIONING SYSTEM GROUND SUPPORT
Oct 20, 2021P00353$0GLOBAL POSITIONING SYSTEM GROUND SUPPORT
Sep 17, 2021P00352$477GLOBAL POSITIONING NEXT GENERATION OPERATION CONTROL SEGMENT 10 SPECIAL STUDY
Sep 17, 2021P00352$2.0MGLOBAL POSITIONING NEXT GENERATION OPERATION CONTROL SEGMENT 10 SPECIAL STUDY
Sep 17, 2021P00352$3.6MGLOBAL POSITIONING NEXT GENERATION OPERATION CONTROL SEGMENT 10 SPECIAL STUDY
Sep 8, 2021P00351$61.2KGLOBAL POSITIONING NEXT GENERATION OPERATION CONTROL SEGMENT 10 SPECIAL STUDY
Aug 24, 2021P00350$3.6MGLOBAL POSITIONING NEXT GENERATION OPERATION CONTROL SEGMENT 10 SPECIAL STUDY
Aug 19, 2021P00348$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM
Aug 6, 2021P00349$646.6KGLOBAL POSITIONING NEXT GENERATION OPERATION CONTROL SEGMENT 10 SPECIAL STUDY
Jul 19, 2021P00346$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM
Jul 9, 2021P00345$249.8KGLOBAL POSITIONING SYSTEM GROUND SUPPORT
Jul 9, 2021P00345$6.5MGLOBAL POSITIONING SYSTEM GROUND SUPPORT
Jul 3, 2021P00347$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SEGMENT.
Jun 29, 2021P00343$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM.
Jun 29, 2021P00344$0OPERATIONAL GROUND CONTROL - GLOBAL POSITIONING SYSTEMS SATELLITE
Jun 22, 2021P00342$8.3MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM.
Jun 21, 2021P00341$0GLOBAL POSITIONING SYSTEM ADVANCED CONTROL SEGMENT PHASE B BLOCKS 1 AND 2
May 18, 2021A00001$0GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2
May 17, 2021P00340$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM
May 7, 2021P00339$0GLOBAL POSITIONING SYSTEM GROUND SUPPORT
Apr 23, 2021P00338$5.6MGLOBAL POSITIONING SYSTEM GROUND SUPPORT
Apr 23, 2021P00338$90.4MGLOBAL POSITIONING SYSTEM GROUND SUPPORT
Apr 21, 2021P00337$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM.
Apr 9, 2021P00336$1.4MGROUND CONTROL SYSTEM
Apr 9, 2021P00336$7.2MGROUND CONTROL SYSTEM
Mar 26, 2021P00335$1.5MOPERATIONAL CONTROL GROUND SYSTEM SATELLITE SUPPORT
Mar 25, 2021P00334$0ADDING SATELLITE SPECIFICATIONS
Mar 1, 2021P00333$0GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM.
Feb 18, 2021P00332$16.4MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM
Jan 29, 2021P00330$-17.5KADDING SATELLITE SPECIFICATIONS
Jan 29, 2021P00331$6.0MNEXT GENERATION OPERATIONAL CONTROL SYSTEMS
Jan 22, 2021P00328$3.1MGLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
55/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 55/100. Available recorded signals: 50 points.

Contract end 2027-03-31 (157 days from calculation)
+35 points
0 historical awards in this buyer and category group
+0 points
596 recorded award transactions
+10 points
Latest award action: 2026-05-14
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.