Federal contract award
FA880710C0001
GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | FA8807 MIL COMM AND PNT SSC/CGK |
| NAICS | 541712 |
| PSC | AC27 — R&D- DEFENSE SYSTEM: MISSILE/SPACE SYSTEMS (COMMERCIALIZED) |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS AWARD FEE |
| Obligations | $276.5M |
| Current contract value | $864.7M |
| Potential contract value / ceiling | $864.7M |
| Start date | Feb 25, 2010 |
| Current end date | Mar 31, 2027 |
| Potential end date | Mar 31, 2027 |
| Latest award activity | May 14, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 200 of 596 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 14, 2026 | P00494 | $10.3M | NEXT GENERATION OPERATIONAL CONTROL SYSTEM BLOCK 1 |
| May 6, 2026 | P00493 | $0 | ADDING SATELLITE SPECIFICATIONS |
| Apr 20, 2026 | P00492 | $0 | NEXT GENERATION OPERATIONAL CONTROL SYSTEM. |
| Apr 1, 2026 | P00489 | $0 | NEXT GENERATION OPERATIONAL SUPPORT |
| Mar 31, 2026 | P00490 | $9.0M | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Mar 23, 2026 | P00488 | $2.1M | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Mar 18, 2026 | P00487 | $0 | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Feb 25, 2026 | P00486 | $13.5M | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Feb 25, 2026 | P00486 | $1.4M | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Feb 23, 2026 | P00484 | $0 | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Jan 20, 2026 | P00483 | $0 | NEXT GENERATION OPERATIONAL CONTROL |
| Dec 11, 2025 | P00482 | $11.5M | GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2 |
| Dec 11, 2025 | P00482 | $319.3K | GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2 |
| Dec 8, 2025 | P00481 | $0 | ADDING SATELLITE SPECIFICATIONS |
| Dec 2, 2025 | P00480 | $23.3M | NEXT GENERATION OPERATIONAL CONTROL SEGMENT |
| Dec 2, 2025 | P00480 | $5.6M | NEXT GENERATION OPERATIONAL CONTROL SEGMENT |
| Nov 25, 2025 | P00473 | $0 | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Nov 20, 2025 | P00479 | $12.0M | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Nov 5, 2025 | P00478 | $4.9M | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Oct 20, 2025 | P00476 | $3.4M | NEXT GENERATION OPERATIONAL SYSTEM |
| Oct 1, 2025 | P00475 | $0 | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Sep 22, 2025 | P00471 | $375.0K | ADDING SATELLITE SPECIFICATIONS |
| Sep 22, 2025 | P00472 | $0 | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Sep 8, 2025 | P00470 | $3.7M | ADDING SATELLITE SPECIFICATIONS |
| Aug 29, 2025 | P00468 | $22.7M | GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2 |
| Aug 29, 2025 | P00469 | $0 | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Aug 25, 2025 | P00467 | $0 | GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2 |
| Aug 11, 2025 | P00465 | $-999 | ADDING SATELLITE SPECIFICATIONS |
| Aug 11, 2025 | P00465 | $68.2K | ADDING SATELLITE SPECIFICATIONS |
| Aug 6, 2025 | P00466 | $0 | ADDING SATELLITE SPECIFICATIONS |
| Jul 29, 2025 | P00464 | $0 | ADDING SATELLITE SPECIFICATIONS |
| Jul 17, 2025 | P00463 | $9.5M | GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2 |
| Jul 17, 2025 | P00463 | $5.5M | GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2 |
| Jul 1, 2025 | P00461 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Jun 26, 2025 | P00462 | $2.2M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Jun 26, 2025 | P00462 | $3.9M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Jun 17, 2025 | P00460 | $-1.6M | GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2 |
| Jun 17, 2025 | P00460 | $1.6M | GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2 |
| Jun 12, 2025 | P00459 | $0 | NEXT GENERATION OPERATIONAL CONTROL SYSTEM INTERIM CONTRACTOR SUPPORT |
| May 28, 2025 | P00458 | $0 | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| May 23, 2025 | P00457 | $41.3M | ADDING SATELLITE SPECIFICATIONS |
| May 23, 2025 | P00457 | $1.6M | ADDING SATELLITE SPECIFICATIONS |
| May 22, 2025 | P00454 | $0 | INTERIM CONTRACTOR SUPPORT |
| May 6, 2025 | P00456 | $3.6M | GLOBAL POSITIONING SYSTEM ADVANCED CONTROL SEGMENT PHASE B BLOCKS 1 AND 2 |
| Apr 25, 2025 | P00455 | $-1.6M | GLOBAL POSITIONING SYSTEM ADVANCED CONTROL SEGMENT PHASE B BLOCKS 1 AND 2 |
| Apr 25, 2025 | P00455 | $1.6M | GLOBAL POSITIONING SYSTEM ADVANCED CONTROL SEGMENT PHASE B BLOCKS 1 AND 2 |
| Apr 14, 2025 | P00449 | $0 | ADDING SATELLITE SPECIFICATIONS |
| Mar 27, 2025 | P00452 | $0 | GLOBAL POSITIONING SYSTEM ADVANCED CONTROL SEGMENT PHASE B BLOCKS 1 AND 2ADMINISTRATIVE CLAUSE UPDATES FOR NEXT GENERATION OPERATIONAL CONTROL SYSTEM. |
| Mar 26, 2025 | P00451 | $0 | GLOBAL POSITIONING SYSTEM ADVANCED CONTROL SEGMENT PHASE B BLOCKS 1 AND 2 |
| Mar 20, 2025 | P00453 | $30.3M | ADDING SATELLITE SPECIFICATIONS |
| Mar 5, 2025 | P00447 | $0 | ADDING SATELLITE SPECIFICATIONS |
| Mar 3, 2025 | P00442 | $573.6K | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Feb 25, 2025 | P00448 | $3.1M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Feb 14, 2025 | P00446 | $2.7M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Feb 12, 2025 | P00445 | $-3.1M | ADDING SATELLITE SPECIFICATIONS |
| Feb 5, 2025 | P00444 | $500.0K | ADDING SATELLITE SPECIFICATIONS |
| Feb 5, 2025 | P00444 | $10.5M | ADDING SATELLITE SPECIFICATIONS |
| Jan 30, 2025 | P00443 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Jan 15, 2025 | P00441 | $0 | ADDING SATELLITE SPECIFICATIONS |
| Dec 23, 2024 | P00440 | $1.4M | ADDING SATELLITE SPECIFICATIONS |
| Dec 23, 2024 | P00440 | $11.2M | ADDING SATELLITE SPECIFICATIONS |
| Nov 27, 2024 | P00439 | $21.0M | INTERIM CONTRACTOR SUPPORT (ICS) UNPRICED CHANGE ORDER (UCO) |
| Nov 20, 2024 | P00438 | $4.3M | ADDING SATELLITE SPECIFICATIONS |
| Nov 18, 2024 | P00438 | $16.0M | ADDING SATELLITE SPECIFICATIONS |
| Oct 30, 2024 | P00437 | $8.9M | ADDING SATELLITESSPECIFICATIONS |
| Oct 30, 2024 | P00437 | $9.1M | ADDING SATELLITE SPECIFICATIONS |
| Oct 21, 2024 | P00436 | $0 | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Oct 1, 2024 | P00434 | $6.6M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS. |
| Oct 1, 2024 | P00434 | $19.4M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS. |
| Sep 27, 2024 | P00435 | $-2.3M | NEXT GENERATION OPERATIONAL CONTROL SYSTEM. |
| Sep 16, 2024 | P00429 | $0 | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Sep 13, 2024 | P00433 | $0 | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Sep 6, 2024 | P00432 | $13.5K | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Sep 6, 2024 | P00432 | $8.9M | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Aug 29, 2024 | P00431 | $3.3M | NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Aug 26, 2024 | P00430 | $-248.6K | GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2 |
| Aug 26, 2024 | P00430 | $248.6K | ADDING SATELLITE SPECIFICATIONS |
| Aug 19, 2024 | P00428 | $915.0K | ADDING SATELLITE SPECIFICATIONS |
| Aug 19, 2024 | P00428 | $2.0M | ADDING SATELLITE SPECIFICATIONS |
| Aug 7, 2024 | P00427 | $1.0M | ADDING SATELLITE SPECIFICATIONS |
| Aug 7, 2024 | P00427 | $9.1M | ADDING SATELLITE SPECIFICATIONS |
| Jul 29, 2024 | P00426 | $0 | ADDING SATELLITE SPECIFICATIONS |
| Jul 3, 2024 | P00425 | $13.9M | NEXT GENERATION OPERATIONAL CONTROL SEGMENT. ADDING SATELLITE SPECIFICATIONS. CLIN 0102 PROVISIONAL OVERRUN |
| Jun 24, 2024 | P00424 | $0 | NEXT GENERATION OPERATIONAL CONTROL SEGMENT ADDING SATELLITE SPECIFICATIONS. |
| May 29, 2024 | P00423 | $2.2M | NEXT GENERATION OPERATIONAL CONTROL SEGMENT ADDING SATELLITE SPECIFICATIONS |
| May 29, 2024 | P00423 | $23.7M | NEXT GENERATION OPERATIONAL CONTROL SEGMENT ADDING SATELLITE SPECIFICATIONS |
| May 16, 2024 | P00422 | $13.1M | NEXT GENERATION OPERATIONAL CONTROL SEGMENT |
| May 2, 2024 | P00421 | $781.9K | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS. |
| Apr 29, 2024 | P00420 | $11.5M | ADDING SATELLITE SPECIFICATIONS |
| Apr 23, 2024 | P00419 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS. |
| Mar 28, 2024 | P00418 | $11.1M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS. |
| Feb 28, 2024 | P00417 | $4.7M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS |
| Feb 28, 2024 | P00417 | $15.2M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS |
| Feb 5, 2024 | P00416 | $11.9M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS. |
| Jan 24, 2024 | P00415 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS |
| Dec 21, 2023 | P00414 | $2.5M | ADDING SATELLITE SPECIFICATIONS |
| Dec 21, 2023 | P00414 | $19.4M | ADDING SATELLITE SPECIFICATIONS |
| Dec 18, 2023 | P00413 | $0 | NEXT GENERATION OPERATIONAL CONTROL |
| Nov 29, 2023 | P00411 | $0 | NEXT GENERATION OPERATIONAL CONTROL |
| Nov 21, 2023 | P00412 | $4.6M | NEXT GENERATION OPERATIONAL CONTROL |
| Nov 6, 2023 | P00410 | $2.7M | NEXT GENERATION OPERATIONAL CONTROL |
| Oct 11, 2023 | P00409 | $0 | NEXT GENERATION OPERATIONAL CONTROL |
| Sep 28, 2023 | P00408 | $0 | ADDING SATELLITE SPECIFICATIONS |
| Sep 26, 2023 | A00005 | $-83.5K | DE-OBLIGATING FY23 CANCELING FUNDS ACRN AY |
| Sep 22, 2023 | P00407 | $3.0M | ADDING SATELLITE SPECIFICATIONS |
| Sep 15, 2023 | P00406 | $28.5M | ADDING SATELLITE SPECIFICATIONS |
| Aug 28, 2023 | A00004 | $-4.4M | GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2 |
| Jul 26, 2023 | P00405 | $28.6M | ADDING SATELLITE SPECIFICATIONS |
| Jul 13, 2023 | P00404 | $276.7K | ADDING SATELLITE SPECIFICATIONS |
| Jun 29, 2023 | P00403 | $0 | ADDING SATELLITE SPECIFICATIONS |
| Jun 21, 2023 | P00402 | $-2.5M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Jun 21, 2023 | P00402 | $2.5M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Jun 8, 2023 | P00401 | $6.9M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| May 11, 2023 | P00400 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| May 5, 2023 | P00399 | $917.3K | NEXT GENERATION OPERATIONAL CONTROL SEGMENT |
| Apr 28, 2023 | P00398 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Apr 7, 2023 | P00396 | $0 | GLOBAL POSITIONAL SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Apr 6, 2023 | P00395 | $0 | ADDING SATELLITE SPECIFICATIONS |
| Mar 30, 2023 | P00397 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Mar 20, 2023 | P00394 | $41.0M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SEGMENT |
| Mar 15, 2023 | P00393 | $1.1M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SEGMENT |
| Mar 15, 2023 | P00393 | $17.3M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SEGMENT |
| Mar 8, 2023 | P00392 | $15.0M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL |
| Feb 28, 2023 | P00391 | $11.0M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL |
| Feb 24, 2023 | P00390 | $0 | ADDING SATELLITE SPECIFICATIONS |
| Feb 1, 2023 | A00003 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL |
| Jan 31, 2023 | P00389 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL |
| Jan 10, 2023 | P00388 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Dec 21, 2022 | P00387 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Dec 20, 2022 | P00386 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Dec 12, 2022 | P00385 | $15.7M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Dec 6, 2022 | P00384 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Nov 23, 2022 | P00383 | $455.4K | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Nov 18, 2022 | P00382 | $4.6M | ADDING SATELLITE SPECIFICATIONS |
| Nov 1, 2022 | P00380 | $3.0M | NEXT GENERATION OPERATIONAL CONTROL SEGMENT (OCX) |
| Nov 1, 2022 | P00380 | $23.7M | NEXT GENERATION OPERATIONAL CONTROL SEGMENT (OCX) |
| Oct 31, 2022 | P00381 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SEGMENT |
| Oct 26, 2022 | P00378 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM ADDING SATELLITE SPECIFICATIONS |
| Oct 26, 2022 | P00379 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SEGMENT |
| Sep 20, 2022 | A00002 | $-161.6K | GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2 |
| Sep 8, 2022 | P00377 | $13.4M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Sep 1, 2022 | P00376 | $0 | ADDING SATELLITE SPECIFICATIONS |
| Aug 29, 2022 | P00375 | $5.3M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Aug 19, 2022 | P00374 | $5.3M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM. |
| Aug 19, 2022 | P00374 | $427.8K | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM. |
| Aug 12, 2022 | P00373 | $-1.2M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Jul 29, 2022 | P00372 | $0 | NEXT GENERATION OPERATIONAL CONTROL SEGMENT |
| Jun 30, 2022 | P00370 | $0 | NEXT GENERATION OPERATIONAL CONTROL SEGMENT |
| Jun 21, 2022 | P00371 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL |
| May 31, 2022 | P00369 | $5.9M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL |
| May 31, 2022 | P00369 | $62.4M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL |
| May 24, 2022 | P00368 | $5.0M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| May 5, 2022 | P00367 | $978.8K | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| May 5, 2022 | P00367 | $14.0M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| May 3, 2022 | P00364 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Apr 26, 2022 | P00366 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Apr 18, 2022 | P00365 | $1.3M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SYSTEM |
| Mar 30, 2022 | P00363 | $989.8K | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM |
| Mar 30, 2022 | P00363 | $12.9M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM |
| Mar 15, 2022 | P00362 | $967.8K | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM |
| Mar 15, 2022 | P00362 | $14.4M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM |
| Mar 7, 2022 | P00361 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM |
| Dec 30, 2021 | P00360 | $22.5M | GLOBAL POSITIONING SYSTEM GROUND SUPPORT CERTIFICATE OF CONFORMANCE INCENTIVE FEE AWARD GLOBAL POSITIONING SYSTEM GROUND SUPPORT. |
| Dec 17, 2021 | P00358 | $0 | GLOBAL POSITIONING SYSTEM GROUND SUPPORT |
| Dec 17, 2021 | P00359 | $14.1M | CERTIFICATE OF CONFORMANCE INCENTIVE FEE AWARD GLOBAL POSITIONING SYSTEM GROUND SUPPORT. |
| Dec 14, 2021 | P00357 | $4.0M | GLOBAL POSITIONING SYSTEM GROUND SUPPORT |
| Dec 13, 2021 | P00356 | $0 | GLOBAL POSITIONING SYSTEM GROUND SUPPORT |
| Nov 17, 2021 | P00355 | $0 | GLOBAL POSITIONING SYSTEM GROUND SUPPORT |
| Nov 5, 2021 | P00354 | $0 | GLOBAL POSITIONING SYSTEM GROUND SUPPORT |
| Oct 20, 2021 | P00353 | $0 | GLOBAL POSITIONING SYSTEM GROUND SUPPORT |
| Sep 17, 2021 | P00352 | $477 | GLOBAL POSITIONING NEXT GENERATION OPERATION CONTROL SEGMENT 10 SPECIAL STUDY |
| Sep 17, 2021 | P00352 | $2.0M | GLOBAL POSITIONING NEXT GENERATION OPERATION CONTROL SEGMENT 10 SPECIAL STUDY |
| Sep 17, 2021 | P00352 | $3.6M | GLOBAL POSITIONING NEXT GENERATION OPERATION CONTROL SEGMENT 10 SPECIAL STUDY |
| Sep 8, 2021 | P00351 | $61.2K | GLOBAL POSITIONING NEXT GENERATION OPERATION CONTROL SEGMENT 10 SPECIAL STUDY |
| Aug 24, 2021 | P00350 | $3.6M | GLOBAL POSITIONING NEXT GENERATION OPERATION CONTROL SEGMENT 10 SPECIAL STUDY |
| Aug 19, 2021 | P00348 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM |
| Aug 6, 2021 | P00349 | $646.6K | GLOBAL POSITIONING NEXT GENERATION OPERATION CONTROL SEGMENT 10 SPECIAL STUDY |
| Jul 19, 2021 | P00346 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM |
| Jul 9, 2021 | P00345 | $249.8K | GLOBAL POSITIONING SYSTEM GROUND SUPPORT |
| Jul 9, 2021 | P00345 | $6.5M | GLOBAL POSITIONING SYSTEM GROUND SUPPORT |
| Jul 3, 2021 | P00347 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATIONAL CONTROL SEGMENT. |
| Jun 29, 2021 | P00343 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM. |
| Jun 29, 2021 | P00344 | $0 | OPERATIONAL GROUND CONTROL - GLOBAL POSITIONING SYSTEMS SATELLITE |
| Jun 22, 2021 | P00342 | $8.3M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM. |
| Jun 21, 2021 | P00341 | $0 | GLOBAL POSITIONING SYSTEM ADVANCED CONTROL SEGMENT PHASE B BLOCKS 1 AND 2 |
| May 18, 2021 | A00001 | $0 | GPS ADVANCED CONTROL SEGMENT (OCX) PHASE B BLOCKS 1 AND 2 |
| May 17, 2021 | P00340 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM |
| May 7, 2021 | P00339 | $0 | GLOBAL POSITIONING SYSTEM GROUND SUPPORT |
| Apr 23, 2021 | P00338 | $5.6M | GLOBAL POSITIONING SYSTEM GROUND SUPPORT |
| Apr 23, 2021 | P00338 | $90.4M | GLOBAL POSITIONING SYSTEM GROUND SUPPORT |
| Apr 21, 2021 | P00337 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM. |
| Apr 9, 2021 | P00336 | $1.4M | GROUND CONTROL SYSTEM |
| Apr 9, 2021 | P00336 | $7.2M | GROUND CONTROL SYSTEM |
| Mar 26, 2021 | P00335 | $1.5M | OPERATIONAL CONTROL GROUND SYSTEM SATELLITE SUPPORT |
| Mar 25, 2021 | P00334 | $0 | ADDING SATELLITE SPECIFICATIONS |
| Mar 1, 2021 | P00333 | $0 | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM. |
| Feb 18, 2021 | P00332 | $16.4M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM |
| Jan 29, 2021 | P00330 | $-17.5K | ADDING SATELLITE SPECIFICATIONS |
| Jan 29, 2021 | P00331 | $6.0M | NEXT GENERATION OPERATIONAL CONTROL SYSTEMS |
| Jan 22, 2021 | P00328 | $3.1M | GLOBAL POSITIONING SYSTEM NEXT GENERATION OPERATION CONTROL SYSTEM |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
55/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 55/100. Available recorded signals: 50 points.
- Contract end 2027-03-31 (157 days from calculation)
- +35 points
- 0 historical awards in this buyer and category group
- +0 points
- 596 recorded award transactions
- +10 points
- Latest award action: 2026-05-14
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.