Federal contract award

FA880810C0001

WGS BLOCK II FOLLOW ON

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA8807 MIL COMM AND PNT SSC/CGK
NAICS334220 — Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing
PSCAC25 — NATIONAL DEFENSE R&D SVCS; ATOMIC ENERGY DEFENSE ACTIVITIES; R&D FACILITIES & MAJ EQUIP
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$2.5B
Current contract value$5.7B
Potential contract value / ceiling$5.7B
Start dateAug 19, 2010
Current end dateJan 31, 2029
Potential end dateJan 31, 2029
Latest award activityMay 6, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 193 of 193 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 6, 2026P00176$3.2MWIDEBAND GLOBAL SATCOM FOLLOW ON
Mar 13, 2026P00174$0WIDEBAND GLOBAL SATELLITE COMMUNICATION FOLLOW ON
Dec 15, 2025P00173$0WIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK II FOLLOW ON
Oct 7, 2025P00172$400.0KWIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK II FOLLOW ON.
Sep 22, 2025P00171$235.8KWIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK II FOLLOW ON
Sep 16, 2025P00168$32.3MWIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK II FOLLOW ON SPACE VEHICLE 12.
May 7, 2025P00167$0WIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK II FOLLOW ON SPACE VEHICLE 12.
Apr 7, 2025P00165$0WIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK II FOLLOW ON SPACE VEHICLE 12.
Feb 20, 2025P00166$12.4MWIDEBAND GLOBAL SATCOM COMMUNICATIONS
Nov 14, 2024P00164$0WIDEBAND GLOBAL SATELLITE COMMUNICATIONS
Sep 26, 2024P00162$28.9MWIDEBAND GLOBAL SATELLITE COMMUNICATIONS
Sep 9, 2024P00160$-567.8KWIDEBAND GLOBAL SATELLITE COMMUNICATIONS
Sep 9, 2024P00160$-24.6MWIDEBAND GLOBAL SATELLITE COMMUNICATIONS
Sep 9, 2024P00163$0WIDEBAND GLOBAL SATELLITE COMMUNICATIONS
Aug 7, 2024P00161$0WIDEBAND GLOBAL SATCOM
Aug 1, 2024P00159$0WIDEBAND GLOBAL SATCOM
Apr 11, 2024P00158$252.2KWIDEBAND GLOBAL SATCOM SPACE VEHICLE 12
Apr 11, 2024P00158$1.6MWIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK II FOLLOW ON SPACE VEHICLE 12.
Mar 14, 2024P00157$0WIDEBAND GLOBAL SATCOM SPACE VEHICLE 12
Mar 1, 2024P00156$439.6MWIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK II FOLLOW ON SPACE VEHICLE 12.
Sep 29, 2023P00155$567.8KWIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK II FOLLOW ON
Sep 29, 2023P00155$24.9MWIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK II FOLLOW ON
Sep 11, 2023P00170$0WIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK II FOLLOW ON
Aug 11, 2023P00153$1.2MWIDEBAND GLOBAL SATCOM BLOCK II FOLLOW ON AUTHORITY TO OPERATE SPECIAL STUDY
May 22, 2023P00150$-4.6MWIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK II FOLLOW ON
Apr 20, 2023P00151$85.1KWIDEBAND GLOBAL SATCOM BLOCK II FOLLOW ON PAYLOAD HARDWARE ENGINEERING CHANGE (PHEC) ANOMALY STUDY
Apr 7, 2023P00148$220.0KWIDEBAND GLOBAL SATELLITE COMMUNICATIONS LOCK II FOLLOW ON
Mar 15, 2023P00149$0WIDEBAND GLOBAL SATELLITE COMMUNICATIONS LOCK II FOLLOW ON CONTRACTING OFFICE ID CHANGED FROM FA8808 TO FA8807.
Dec 15, 2022P00147$0WIDEBAND GLOBAL BLOCK II FOLLOW-ON SPACE VEHICLE 11 LAUNCH AND MISSION OPERATIONS IMPLEMENTATION
Dec 6, 2022P00143$36.7MWIDEBAND GLOBAL BLOCK II FOLLOW-ON SPACE VEHICLE 11 LAUNCH AND MISSION OPERATIONS IMPLEMENTATION
Nov 28, 2022A00014$0WGS BLOCK II FOLLOW ON
Sep 27, 2022P00144$1.1MWIDEBAND GLOBAL SATCOM BLOCK II FOLLOW ON-ORBIT HAZARD ANALYSIS OPTION
Sep 27, 2022P00146$0WIDEBAND GLOBAL SATELLITE COMMUNICATION BLOCK II FOLLOW ON CONTRACT
Sep 20, 2022P00145$0WIDEBAND GLOBAL SATCOM BLOCK II FOLLOW ON
Sep 8, 2022P00142$-759.8KWIDEBAND GLOBAL SATCOM BLOCK II FOLLOW ON
Jun 7, 2022P00141$4.9KWIDEBAND GLOBAL SATCOM BLOCK II FOLLOW ON CLIN 0026 INCREMENTAL FUNDING
May 31, 2022P00140$0WIDEBAND GLOBAL SATCOM BLOCK II FOLLOW ON
May 17, 2022P00139$600.0KWIDEBAND GLOBAL SATELLITE COMMUNICATIONS
May 16, 2022P00135$0WIDEBAND GLOBAL SATCOM BLOCK II FOLLOW ON OPTION CONTRACT LINE ITEM NUMBER TO INCLUDE ON-ORBIT HAZARD ANALYSIS
Apr 19, 2022P00138$0WIDEBAND GLOBAL SATCOM BLOCK II FOLLOW ON
Apr 5, 2022P00136$0PROTECTED TACTICAL SATELLITE COMMUNICATION ATTACHMENT UPDATE
Mar 1, 2022P00133$0WIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK 2 FOLLOW-ON
Feb 25, 2022P00137$0PROTECTED TACTICAL SATELLITE COMMUNICATION INTEGRATION AND TEST EFFORT
Dec 30, 2021P00131$2.0MPROTECTED TACTICAL SATILITE COMMUNICATION INTEGRATION AND TEST EFFORT
Oct 21, 2021P00129$0WIDEBAND GLOBAL SATCOM BLOCK II FOLLOW ON
Sep 30, 2021P00134$230.1K11 PLUS LAUNCH VEHICLE INTERFACE ENGINEERING SUPPORT EXTENSION
Sep 16, 2021A00013$0WGS BLOCK II FOLLOW ON
Aug 25, 2021P00132$2.3MWIDEBAND GLOBAL SATELLITE COMMUNICATIONS
Jul 30, 2021P00130$41.2MWIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK 2 FOLLOW-ON
Jun 21, 2021P00127$20.6MWIDEBAND GLOBAL SATCOM SPACE VEHICLE 11 LAUNCH AND MISSION OPERATIONS DESIGN AND PRODUCTS - CLIN 0023
Feb 25, 2021P00128$0WIDEBAND GLOBA SATELLITE COMMUNICATIONS
Dec 17, 2020P00120$0CONTRACT CLEAN-UP, ADMINISTRATIVE UPDATES TO EXHIBIT AND ATTACHMENTS
Oct 1, 2020P00121$4.9MWIDEBAND GLOBAL SATCOM BLOCK II FOLLOW-ON SATELLITES 7 THROUGH 11. ENGINEERING SUPPORT FOR HOSTED PAYLOAD ACCOMMODATION EFFORT
Sep 29, 2020PZ0125$1.5MWIDEBAND GLOBAL SATELLITE COMMUNICATIONS HIGH SPEED TELEMETRY UNPRICED CHANGE ORDER DEFINITIZATION
Sep 22, 2020P00126$0WIDEBAND GLOBAL SATCOM BLOCK II FOLLOW-ON SATELLITES 7 THROUGH 11
Sep 10, 2020P00124$729.4KLAUNCH VEHICLE INTERFACE ENGINEERING SUPPORT
Aug 19, 2020A00012$0UPDATE THE CONTRACTOR'S ADDRESS AND DATA UNIVERSAL NUMBERING SYSTEM
Aug 19, 2020A00012$0WGS BLOCK II FOLLOW ON
Aug 19, 2020A00012$0UPDATE THE CONTRACTOR'S ADDRESS AND DATA UNIVERSAL NUMBERING SYSTEM
Aug 3, 2020P00122$5.2MWIDEBAND GLOBAL SATELLITE COMMUNICATIONS SPACE VEHICLE 11 HIGH SPEED TELEMETRY UNPRICED CHANGE ORDER.
Jul 30, 2020P00119$4.8MESTABLISH SPACE AND MISSILE SYSTEMS CENTER H100 COLORADO SPRINGS CY 2020-2021 LABOR RATES AND CLIN 0500 CONTROL SEGMENT ENGINEERING SUPPORT
Jul 30, 2020P00123$0CLIN 0408 NO COST PERIOD OF PERFORMANCE EXTENSION
Apr 13, 2020P00118$1.6MWIDEBAND GLOBAL SATELLITE COMMUNICATIONS.
Feb 10, 2020PZ0112$299.5MWIDEBAND GLOBAL SATCOM SPACE VEHICLE 11 UNDEFINITIZED CONTRACT ACTION DEFINITIZATION - CLIN 0021 SATELLITE PRODUCTION AND GROUND INTERFACES DEFINITION.
Jan 22, 2020P00117$0CLAUSE MODIFICATION AND INCORPORATION OF CALENDAR YEAR 2020-2022 RATES
Jan 14, 2020P00116$0WIDEBAND GLOBAL SATELLITE COMMUNICATION ADMINISTRATIVE UPDATES
Sep 16, 2019P00115$3.1MREQUEST FOR EQUITABLE ADJUSTMENT FOR THE LAUNCH DELAY AND ENCAPSULATION INCIDENT OF THE WIDEBAND GLOBAL SATELLITE COMMUNICATION - BLOCK II FOLLOW-ON PROGRAM - SPACE VEHICLE 10.
Aug 5, 2019P00114$457.0KWIDE GLOBAL SATELLITE COMMUNICATION BLOCK II FOLLOW-ON
Apr 19, 2019P00109$300.0MWIDEBAND GLOBAL SATELLITE COMMUNICATIONS SPACE VEHICLE 11 UNDEFINITIZED CONTRACT ACTION
Apr 8, 2019P00113$99.4KMITIGATION AND ANTI-JAM ENHANCEMENT HARDWARE
Mar 6, 2019P00111$0CALENDAR 2019 ENGINEERING SUPPORT RATES.
Nov 21, 2018P00110$14.0MMITIGATION AND ANTIJAM ENHANCEMENTS ADDITIONAL STRINGS
Oct 10, 2018P00108$0PROCUREMENT OF WIDEBAND GLOBAL SATCOM SPACE VEHICLES 11 AND 12
Sep 5, 2018A00010$-309.9KWGS BLOCK II FOLLOW ON
Sep 5, 2018A00011$-309.9KWGS BLOCK II FOLLOW ON
Feb 28, 2018P00107$682.0KOPTION 0015AG EXERCISE TRANSFERS SATELLITE VEHICLE 10 TO FINAL DESTINATION, CLAUSE CORRECTIONS, UPDATE MASS OF SATELLITE
Jan 18, 2018ARZ998$0WGS BLOCK II FOLLOW ON
Nov 8, 2017P00106$0ESTABLISH WIDE GLOBAL SATCOM-10 LAUNCH DATE, UPDATE CONTRACT DATA REQUIREMENTS LIST&COST&SOFTWARE DATA REPORING PLAN
Oct 6, 2017P00105$0WIDEBAND GLOBAL SATELLITE COMMUNICATIONS GOVERNMENT FURNISHED PROPERTY DISPOSITION
Sep 15, 2017P00103$1.6MXENON ION PROPULSION SYSTEM ORIFICE WELD REWORK REQUEST FOR EQUITABLE ADJUSTMENT
Sep 15, 2017P00104$47.6KX-BAND MITIGATION AND ANTI-JAM ENHANCEMENT INCREMENTAL FUNDING
Sep 5, 2017P00102$0ADMINSITRATIVE UPDATED TO THE LINE OF ACCOUNTING AND PAYMENT INSTRUCTIONS FOR POINT OF USE FUEL SAMPLING
Aug 29, 2017P00101$12.4MWIDEBAND GLOBAL SATCOM SPACE SYSTEM RESILIENCY UPGRADE X-BAND MITIGATION
Aug 25, 2017P00098$0CONTRACT DATA REQUIREMENTS LIST, COMPLIANCE DOCUMENT LIST, AND LAUNCH MONTH UPDATE
Aug 10, 2017P00100$799.3KPAYMENT FOR POINT OF USE FUEL SAMPLING FOR WIDEBAND GLOBAL SATCOM SPACE VEHICLES 8 AND 9
Jul 26, 2017P00099$30.0KADDITIONAL FUNDING FOR TRAVEL IN SUPPORT OF THE HOSTED PAYLOAD STUDY EFFORT
Jul 24, 2017P00097$0NO COST EXCHANGE OF 2 SECURE TELEPHONES
May 30, 2017P00096$14.9MFUNDS ADDITIONAL 9 MONTHS OF STORAGE FOR WIDEBAND GLOBAL SATCOM SPACE VEHICLE 10 FOR A TOTAL OF 12 MONTHS
May 15, 2017P00093$0ADMINISTRATIVE UPDATE TO PERFORMANCE BASED PAYMENT MILESTONES AND WGS 10 STORAGE LINE ITEM DESCRIPTIONS
Mar 23, 2017P00095$2.1MHOSTED PAYLOAD STUDY
Mar 2, 2017A00009$0WGS BLOCK II FOLLOW ON
Feb 23, 2017P00094$0ADDITION OF CALENDAR YEAR 2017 ENGINEERING SUPPORT RATES TO SPECIAL CONTRACT REQUIREMENT CLAUSE H100 ENGINEERING SUPPORT
Feb 8, 2017A00008$0WGS BLOCK II FOLLOW ON
Jan 30, 2017P00092$6.3MINCREMENTAL FUNDING FOR WIDEBAND GLOBAL SATCOM X-BAND MITIGATION AND ANTI JAM ENHANCEMENT
Jan 24, 2017P00091$2.8MEXERCISE OF OPTION TO EXTEND WIDEBAND GLOBAL SATCOM VEHICLE 10 STORAGE FOR 3 MONTHS
Jan 19, 2017P00086$260.0KADDITIONAL STORAGE FOR WIDEBAND GLOBAL SATCOM SPACE VEHICLE 10
Dec 19, 2016P00087$0WIDEBAND GLOBAL SATELLITE COMMUNICATIONS CLAUSE CORRECTION FROM MODIFICATION P00066
Dec 9, 2016P00090$4.7MWIDEBAND GLOBAL SATCOM 7-10 INCREMENTAL FUNDING FOR PENSION PROTECTION ACT HARMONIZATION
Dec 8, 2016P00088$0NO COST ADMINISTRATIVE UPDATE TO CONTRACT DATA REQUIREMENTS LISTS AND LAUNCH DATES
Nov 28, 2016P00089$0UPDATE TO PAYLOAD HARDWARE EQUIPMENT CHAN LANGUAGE IN STATEMENT OF WORK FOR WIDEBAND GLOBAL SATCOM 7-10
Oct 26, 2016P00085$0WIDEBAND GLOBAL SATELLITE COMMUNICATIONS 7-10, MODIFICATION TO ATTACHMENT 11 PERFORMANCE BASED PAYMENT MILESTONES
Sep 29, 2016P00084$8.2MWIDEBAND GLOBAL SATELLITE COMMUNICATION 7-10 CONTRACT: BOEING PENSION PROTECTION ACT (PPA) HARMONIZATION MODIFICATION
Jun 16, 2016P00083$0WIDE BAND GLOBAL 7-10: ADDED DFARS CLAUSES 252.223-7002, 252.223-7003 AND UPDATE TO EXHIBITS SATELLITE COMMUNICATIONS
May 17, 2016P00082$0MISSION ASSURANCE FOR AEROSPACE PRESIDENT'S REVIEW UPDATE
May 3, 2016A00007$0WGS BLOCK II FOLLOW ON
May 2, 2016P00081$0NO COST CHANGES
Apr 25, 2016P00080$16.6MADDITIONAL MISSION ASSURANCE FOR WIDEBAND GLOBAL SATELLITE COMMUNICATIONS VEHICLES 8 THROUGH 10.
Mar 23, 2016P00078$0SATELLITE 9 CONTROLLED REENTRY OPTION EXERCISE
Mar 17, 2016P00079$23.0MCLIN 0016 NCREMENTAL FUNDING
Feb 29, 2016P00071$1.8MCCP 023 WIDEBAND GLOBAL SATELLITE COMMUNICATIONS SATELLITES 8-10 LAUNCH CAMPAIGN SUPPORT ALTERNATIVE 1
Feb 16, 2016P00066$13.2MWIDEBAND GLOBAL SATCOM MITIGATION AND ANTI-JAM ENHANCEMENT
Jan 27, 2016P00076$0NO COST EXTENSION FOR CLIN 0404 WGS 8-10 MISSION ASSURANCE FOR AEROSPACE PRESIDENT'S REVIEW
Jan 19, 2016P00075$39.1KREQUEST FOR EQUITABLE ADJUSTMENT FOR WGS-7 LAUNCH SUPPORT
Dec 17, 2015P00061$115.7KGLOBAL COMMUNICATIONS SATELLITES.
Dec 1, 2015P00073$463.3KENGINEERING SUPPORT RATE FOR CY 2016 AND MISSION ASSURANCE FOR AEROSPACE PRESIDENT'S REVIEW
Dec 1, 2015P00074$658.8KCLIN 0015AC SATELLITE 8 CONTROLLED REENTRY OPTION EXERCISE
Nov 16, 2015P00072$740.0KCY 15 MISSION ASSURANCE FOR AEROSPACE PRESIDENT'S REVIEW
Oct 20, 2015P00065$0NO COST CHANGES
Aug 14, 2015P00070$0NO COST CHANGES AND UPDATES TO COMPLIANCE ATTACHMENT 2.
Jun 30, 2015P00069$0UPDATING SPECIFICATIONS
May 21, 2015P00068$299.8KADDITIONAL RISK REDUCTION ACTIVITIES
May 1, 2015P00067$367.7KORBIT TRANSFER ACTIVITIES
Mar 26, 2015A00006$5.8MWGS BLOCK II FOLLOW ON
Mar 25, 2015P00064$131.7KMISSION ASSURANCE WGS-7 TASKS 2-4
Feb 25, 2015P00063$64.3KCCP-015 WGS-7 MISSION ASSURANCE ACTIVITIES - TASK 1
Feb 18, 2015P00058$0CHANGES TO: SCR--H094 SATELLITE LAUNCH DATES, PERFORMANCE BASED PAYMENT MILESTONES;&DELETE ATCH 16 REFERENCES
Feb 18, 2015P00062$0CY2015 ENGINEERING SUPPORT RATES
Jan 7, 2015P00060$0UPDATE TO ATTACHMENT 2 "COMPLIANCE DOCUMENTS LIST" BY REVISING THE INTERFACE DESIGN DESCRIPTION (IDD), FROM REV F TO RE
Dec 19, 2014A00005$0WGS BLOCK II FOLLOW ON
Nov 19, 2014P00059$214.5KINTERNATIONAL TRAFFIC IN ARMS REGULATIONS EXPORT TRAINING AND MATERIAL REVIEW FOR WIDEBAND GLOBAL SATCOM (WGS)7-8
Sep 9, 2014P00057$0WGS-8 DELTA CRYOGENIC SECOND STAGE REENTRY STUDY PERIOD OF PERFORMANCE EXTENSION
Jun 30, 2014P00056$0CHANGES TO: OFFICE SPACE, FILTER INTALLATION, ON-ORBIT PROCEDURES, LAUNCH GRACE PERIOD; DELETE:ECONOMIC PRICE ADJUSTMENT
May 8, 2014P00054$567.8KCCP 011 ESTABLISH CLIN 402, AMEND CLAUSE B058&UPDATE ATTACH 9
Mar 31, 2014P00055$0OOHA POP EXTENSION
Mar 19, 2014P00052$0SMC H100 CY2014 LABOR RATE
Dec 23, 2013P00053$0REVISE ATTACH 2 - SCN1 UPDATE
Oct 30, 2013P00051$-3.7MCLIN 0001 FINAL PRICE SETTLEMENT
Sep 18, 2013P00050$0ATTACHMENT 2 REV ROLL AND OTHER NO COST UPDATES
Aug 28, 2013P00048$-5.8MCLIN 0003 AND CLIN 0005 FINAL PRICE SETTLEMENT
Aug 14, 2013A00004$0CLIN 0001 FINAL PRICE SETTLEMENT.
Jun 19, 2013P00049$0NO COST UPDATES TO ATTACHMENT 2 AND ATTACHMENT 11
May 23, 2013A00003$0DEFINITIZE FPI CLIN 0003 AND 0005
May 21, 2013P00047$0PAYMENT MILESTONE REALIGNMENT
May 7, 2013P00034$0UPDATING DD254 REQUIREMENTS AND TO REFLECT NOVATION AGREEMENT CHANGE
Mar 15, 2013P00046$3.1MCCP 008 TEST BATTERY REFURBISHMENT
Mar 6, 2013P00029$0ICD UPDATE TO ATTACHMENT 2 WGS BLK 7-10
Feb 5, 2013P00044$0WGS 7-10 - CHANNELIZER FUNDING REALIGNMENT FROM US TO INTERNATIONAL PARTNERS
Jan 31, 2013P00043$1.2MCCP 009 SYSTEM SAFETY AUGMENTAINAND HAZARD ANALYSIS STUDY
Jan 30, 2013P00039$-265.9KDE-OBLIGATFUNDS FROM RF BYPASS CLINS 0008&0009
Jan 29, 2013P00045$0NOVATION AGREEMENT
Oct 29, 2012P00042$0WGS 7-10 ADMINISTRATIVE CORRECTIONS
Sep 18, 2012P00041$0ATTACHMENT 20 REVISION
Aug 13, 2012P00040$0CLARIFICATION OF SMC H100
Jul 27, 2012PZ0026$328.2MWGS 7-10 SV10 PROCUREMENT AND PARTS UCA DEFINITIZATION
Jul 10, 2012P00036$0CLARIFICATIONS - ATCH 4 - GFP; ATCH 6 - DD254&ATCH 16 - EPA CLAUSE
Jul 3, 2012P00038$0CORRECT LONG LINE OF ACCOUNTING
Jun 28, 2012P00033$2.5MWGS 7-10, CLIN 0001 OBLIGATION OF FUNDS FOR LOA REALIGNMENT
Jun 28, 2012P00037$0WGS 7-10, CLIN 0010 POP EXTENSION
Jun 26, 2012P00028$110.9MWIDEBAND DIGITAL CHANNELIZER UPGRADE
Jun 15, 2012P00035$0ATTACHMENT 2, WGS 7-10 SYSTEM SPECIFICATION UPDATE
May 30, 2012P00032$-2.5MCLIN 0001&CLIN 0006 FUNDING LOA REALIGNMENT AND ADMINISTRATIVE CORRECTION
May 30, 2012P00032$-540CLIN 0001&CLIN 0006 FUNDING LOA REALIGNMENT AND ADMINISTRATIVE CORRECTION
May 21, 2012P00027$0P00027 - ADMINISTRATIVE CORRECTIONS AND POP EXTENSION
May 8, 2012P00031$10.5MSV10 PARTS UCA
May 1, 2012A00001$-540SP
Apr 11, 2012P00017$0CDRL UPDATE AND ATTACHMENT 11 CORRECTION
Apr 9, 2012P00024$777.0KSYSTEM SPECIFICATION UPDATE FOR NATIONAL TELECOMMUNICATIONS&INFO ADMIN (NTIA) REQUIREMENTS
Feb 9, 2012P00016$4.4MSV 7 REDUNDANT PORT ACTIVATION CLIN 0006
Jan 31, 2012P00025$51.1MSV8 INCREMENTAL FUNDING FOR CLIN 0008
Jan 23, 2012P00023$0SYSTEM SPECIFICATION UPDATE FOR END-OF-LIFE DE-ORBIT RELIABILITY REQUIREMENTS
Jan 13, 2012P00020$376.5MOPTION EXERCISE SV9
Jan 6, 2012P00022$0ADMIN CHANGES, AMT UPDATE CLIN 0005, CORRECT PBP M/S ATTACH 11
Dec 30, 2011P00021$9.5MSPACECRAFT MODERNIZATION INITIATIVE DIGITAL CHANNELIZER UPGRADE STUDY
Dec 22, 2011P00019$0INTER PARTNERS SUPPLIER AGREEMENT PROGRAM CLIN 0009, POP EXT. SV9 OPTION EXERCISE
Dec 15, 2011P00018$245.0MSV 8 OPTION EXERCISE CLIN 0008
Nov 15, 2011P00013$665.0KBPUD&PPUD UNDER CLIN 0005 FACTORY RESTART
Nov 1, 2011P00015$0REVISION TO SMC-H095 LANGUAGE AND FOREIGN EXCHANGE RATE FOR F9, ATTACH 4, ATTACH 11
Sep 21, 2011P00014$0ADMIN MOD TO CORRECT LOA
Aug 31, 2011P00006$441.1MWIDEBAND GLOBAL SYSTEM (WGS) BLOCK II FOLLOW-ON (B2FO)
Aug 18, 2011P00012$0WGS - BLOCK II FOLLOW-ON - INTERFACE DESIGN DOCUMENT (IDD) UPDATE
Aug 4, 2011P00011$1.5MNTE FOR SATELLITE 7 TRAVELING WAVE TUBES
Jul 26, 2011P00010$2.5MWGS - BLOCK II FOLLOW-ON CLIN 0001 INCREMENTAL FUNDING - SATELLITE NRE
Jul 18, 2011P00009$6.2MCLIN 0001 INCREMENTATL FUNDING, ATTCH 2 COMPLIANCE DOCUMENTS, ATTCH 8 CSDR,&CDRL G008 (IDD) UPDATES.
May 31, 2011P00008$0REVISION TO DD254 (REV. 2)- ATTACHMENT 06
Feb 24, 2011P00007$0WGS BLOCK II FOLLOW-ON - NO COST CHANGES: ATTCH 1 SOW CORRECTION / ATTCH 13 WBS UPDATE / ATTACH 1 SOW TABLES 2&3 UPDATE
Jan 31, 2011P00005$0NSA APPROVAL OF IN-PROCESS ACCOUNTING PROCEDURE (IPAP) FOR WGS CENTRAL TELEMETRY&COMMAND UNIT (CTCU) CDRLS G051 -G063.
Dec 16, 2010P00003$9.0MINCREMENTAL FUNDING OF NRE - CLIN 0001
Nov 29, 2010P00002$0WGS BLOCK II FOLLOW ON
Oct 21, 2010P00001$0ADMINISTRATIVE CHANGE
Aug 19, 20100$164.4MWGS BLOCK II FOLLOW ON
Aug 19, 20100$0WGS BLOCK II FOLLOW ON
Aug 19, 20100$0WGS BLOCK II FOLLOW ON
Aug 19, 20100$0WGS BLOCK II FOLLOW ON

Estimated positioning window

Jan 31, 2028 – Jul 31, 2028

Recompete signal:
35/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 35/100. Available recorded signals: 30 points.

Contract end 2029-01-31 (829 days from calculation)
+15 points
0 historical awards in this buyer and category group
+0 points
193 recorded award transactions
+10 points
Latest award action: 2026-05-06
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.