Federal contract award
FA880810C0001
WGS BLOCK II FOLLOW ON
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | FA8807 MIL COMM AND PNT SSC/CGK |
| NAICS | 334220 — Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing |
| PSC | AC25 — NATIONAL DEFENSE R&D SVCS; ATOMIC ENERGY DEFENSE ACTIVITIES; R&D FACILITIES & MAJ EQUIP |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $2.5B |
| Current contract value | $5.7B |
| Potential contract value / ceiling | $5.7B |
| Start date | Aug 19, 2010 |
| Current end date | Jan 31, 2029 |
| Potential end date | Jan 31, 2029 |
| Latest award activity | May 6, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 193 of 193 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 6, 2026 | P00176 | $3.2M | WIDEBAND GLOBAL SATCOM FOLLOW ON |
| Mar 13, 2026 | P00174 | $0 | WIDEBAND GLOBAL SATELLITE COMMUNICATION FOLLOW ON |
| Dec 15, 2025 | P00173 | $0 | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK II FOLLOW ON |
| Oct 7, 2025 | P00172 | $400.0K | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK II FOLLOW ON. |
| Sep 22, 2025 | P00171 | $235.8K | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK II FOLLOW ON |
| Sep 16, 2025 | P00168 | $32.3M | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK II FOLLOW ON SPACE VEHICLE 12. |
| May 7, 2025 | P00167 | $0 | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK II FOLLOW ON SPACE VEHICLE 12. |
| Apr 7, 2025 | P00165 | $0 | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK II FOLLOW ON SPACE VEHICLE 12. |
| Feb 20, 2025 | P00166 | $12.4M | WIDEBAND GLOBAL SATCOM COMMUNICATIONS |
| Nov 14, 2024 | P00164 | $0 | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS |
| Sep 26, 2024 | P00162 | $28.9M | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS |
| Sep 9, 2024 | P00160 | $-567.8K | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS |
| Sep 9, 2024 | P00160 | $-24.6M | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS |
| Sep 9, 2024 | P00163 | $0 | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS |
| Aug 7, 2024 | P00161 | $0 | WIDEBAND GLOBAL SATCOM |
| Aug 1, 2024 | P00159 | $0 | WIDEBAND GLOBAL SATCOM |
| Apr 11, 2024 | P00158 | $252.2K | WIDEBAND GLOBAL SATCOM SPACE VEHICLE 12 |
| Apr 11, 2024 | P00158 | $1.6M | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK II FOLLOW ON SPACE VEHICLE 12. |
| Mar 14, 2024 | P00157 | $0 | WIDEBAND GLOBAL SATCOM SPACE VEHICLE 12 |
| Mar 1, 2024 | P00156 | $439.6M | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK II FOLLOW ON SPACE VEHICLE 12. |
| Sep 29, 2023 | P00155 | $567.8K | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK II FOLLOW ON |
| Sep 29, 2023 | P00155 | $24.9M | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK II FOLLOW ON |
| Sep 11, 2023 | P00170 | $0 | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK II FOLLOW ON |
| Aug 11, 2023 | P00153 | $1.2M | WIDEBAND GLOBAL SATCOM BLOCK II FOLLOW ON AUTHORITY TO OPERATE SPECIAL STUDY |
| May 22, 2023 | P00150 | $-4.6M | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK II FOLLOW ON |
| Apr 20, 2023 | P00151 | $85.1K | WIDEBAND GLOBAL SATCOM BLOCK II FOLLOW ON PAYLOAD HARDWARE ENGINEERING CHANGE (PHEC) ANOMALY STUDY |
| Apr 7, 2023 | P00148 | $220.0K | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS LOCK II FOLLOW ON |
| Mar 15, 2023 | P00149 | $0 | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS LOCK II FOLLOW ON CONTRACTING OFFICE ID CHANGED FROM FA8808 TO FA8807. |
| Dec 15, 2022 | P00147 | $0 | WIDEBAND GLOBAL BLOCK II FOLLOW-ON SPACE VEHICLE 11 LAUNCH AND MISSION OPERATIONS IMPLEMENTATION |
| Dec 6, 2022 | P00143 | $36.7M | WIDEBAND GLOBAL BLOCK II FOLLOW-ON SPACE VEHICLE 11 LAUNCH AND MISSION OPERATIONS IMPLEMENTATION |
| Nov 28, 2022 | A00014 | $0 | WGS BLOCK II FOLLOW ON |
| Sep 27, 2022 | P00144 | $1.1M | WIDEBAND GLOBAL SATCOM BLOCK II FOLLOW ON-ORBIT HAZARD ANALYSIS OPTION |
| Sep 27, 2022 | P00146 | $0 | WIDEBAND GLOBAL SATELLITE COMMUNICATION BLOCK II FOLLOW ON CONTRACT |
| Sep 20, 2022 | P00145 | $0 | WIDEBAND GLOBAL SATCOM BLOCK II FOLLOW ON |
| Sep 8, 2022 | P00142 | $-759.8K | WIDEBAND GLOBAL SATCOM BLOCK II FOLLOW ON |
| Jun 7, 2022 | P00141 | $4.9K | WIDEBAND GLOBAL SATCOM BLOCK II FOLLOW ON CLIN 0026 INCREMENTAL FUNDING |
| May 31, 2022 | P00140 | $0 | WIDEBAND GLOBAL SATCOM BLOCK II FOLLOW ON |
| May 17, 2022 | P00139 | $600.0K | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS |
| May 16, 2022 | P00135 | $0 | WIDEBAND GLOBAL SATCOM BLOCK II FOLLOW ON OPTION CONTRACT LINE ITEM NUMBER TO INCLUDE ON-ORBIT HAZARD ANALYSIS |
| Apr 19, 2022 | P00138 | $0 | WIDEBAND GLOBAL SATCOM BLOCK II FOLLOW ON |
| Apr 5, 2022 | P00136 | $0 | PROTECTED TACTICAL SATELLITE COMMUNICATION ATTACHMENT UPDATE |
| Mar 1, 2022 | P00133 | $0 | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK 2 FOLLOW-ON |
| Feb 25, 2022 | P00137 | $0 | PROTECTED TACTICAL SATELLITE COMMUNICATION INTEGRATION AND TEST EFFORT |
| Dec 30, 2021 | P00131 | $2.0M | PROTECTED TACTICAL SATILITE COMMUNICATION INTEGRATION AND TEST EFFORT |
| Oct 21, 2021 | P00129 | $0 | WIDEBAND GLOBAL SATCOM BLOCK II FOLLOW ON |
| Sep 30, 2021 | P00134 | $230.1K | 11 PLUS LAUNCH VEHICLE INTERFACE ENGINEERING SUPPORT EXTENSION |
| Sep 16, 2021 | A00013 | $0 | WGS BLOCK II FOLLOW ON |
| Aug 25, 2021 | P00132 | $2.3M | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS |
| Jul 30, 2021 | P00130 | $41.2M | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS BLOCK 2 FOLLOW-ON |
| Jun 21, 2021 | P00127 | $20.6M | WIDEBAND GLOBAL SATCOM SPACE VEHICLE 11 LAUNCH AND MISSION OPERATIONS DESIGN AND PRODUCTS - CLIN 0023 |
| Feb 25, 2021 | P00128 | $0 | WIDEBAND GLOBA SATELLITE COMMUNICATIONS |
| Dec 17, 2020 | P00120 | $0 | CONTRACT CLEAN-UP, ADMINISTRATIVE UPDATES TO EXHIBIT AND ATTACHMENTS |
| Oct 1, 2020 | P00121 | $4.9M | WIDEBAND GLOBAL SATCOM BLOCK II FOLLOW-ON SATELLITES 7 THROUGH 11. ENGINEERING SUPPORT FOR HOSTED PAYLOAD ACCOMMODATION EFFORT |
| Sep 29, 2020 | PZ0125 | $1.5M | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS HIGH SPEED TELEMETRY UNPRICED CHANGE ORDER DEFINITIZATION |
| Sep 22, 2020 | P00126 | $0 | WIDEBAND GLOBAL SATCOM BLOCK II FOLLOW-ON SATELLITES 7 THROUGH 11 |
| Sep 10, 2020 | P00124 | $729.4K | LAUNCH VEHICLE INTERFACE ENGINEERING SUPPORT |
| Aug 19, 2020 | A00012 | $0 | UPDATE THE CONTRACTOR'S ADDRESS AND DATA UNIVERSAL NUMBERING SYSTEM |
| Aug 19, 2020 | A00012 | $0 | WGS BLOCK II FOLLOW ON |
| Aug 19, 2020 | A00012 | $0 | UPDATE THE CONTRACTOR'S ADDRESS AND DATA UNIVERSAL NUMBERING SYSTEM |
| Aug 3, 2020 | P00122 | $5.2M | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS SPACE VEHICLE 11 HIGH SPEED TELEMETRY UNPRICED CHANGE ORDER. |
| Jul 30, 2020 | P00119 | $4.8M | ESTABLISH SPACE AND MISSILE SYSTEMS CENTER H100 COLORADO SPRINGS CY 2020-2021 LABOR RATES AND CLIN 0500 CONTROL SEGMENT ENGINEERING SUPPORT |
| Jul 30, 2020 | P00123 | $0 | CLIN 0408 NO COST PERIOD OF PERFORMANCE EXTENSION |
| Apr 13, 2020 | P00118 | $1.6M | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS. |
| Feb 10, 2020 | PZ0112 | $299.5M | WIDEBAND GLOBAL SATCOM SPACE VEHICLE 11 UNDEFINITIZED CONTRACT ACTION DEFINITIZATION - CLIN 0021 SATELLITE PRODUCTION AND GROUND INTERFACES DEFINITION. |
| Jan 22, 2020 | P00117 | $0 | CLAUSE MODIFICATION AND INCORPORATION OF CALENDAR YEAR 2020-2022 RATES |
| Jan 14, 2020 | P00116 | $0 | WIDEBAND GLOBAL SATELLITE COMMUNICATION ADMINISTRATIVE UPDATES |
| Sep 16, 2019 | P00115 | $3.1M | REQUEST FOR EQUITABLE ADJUSTMENT FOR THE LAUNCH DELAY AND ENCAPSULATION INCIDENT OF THE WIDEBAND GLOBAL SATELLITE COMMUNICATION - BLOCK II FOLLOW-ON PROGRAM - SPACE VEHICLE 10. |
| Aug 5, 2019 | P00114 | $457.0K | WIDE GLOBAL SATELLITE COMMUNICATION BLOCK II FOLLOW-ON |
| Apr 19, 2019 | P00109 | $300.0M | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS SPACE VEHICLE 11 UNDEFINITIZED CONTRACT ACTION |
| Apr 8, 2019 | P00113 | $99.4K | MITIGATION AND ANTI-JAM ENHANCEMENT HARDWARE |
| Mar 6, 2019 | P00111 | $0 | CALENDAR 2019 ENGINEERING SUPPORT RATES. |
| Nov 21, 2018 | P00110 | $14.0M | MITIGATION AND ANTIJAM ENHANCEMENTS ADDITIONAL STRINGS |
| Oct 10, 2018 | P00108 | $0 | PROCUREMENT OF WIDEBAND GLOBAL SATCOM SPACE VEHICLES 11 AND 12 |
| Sep 5, 2018 | A00010 | $-309.9K | WGS BLOCK II FOLLOW ON |
| Sep 5, 2018 | A00011 | $-309.9K | WGS BLOCK II FOLLOW ON |
| Feb 28, 2018 | P00107 | $682.0K | OPTION 0015AG EXERCISE TRANSFERS SATELLITE VEHICLE 10 TO FINAL DESTINATION, CLAUSE CORRECTIONS, UPDATE MASS OF SATELLITE |
| Jan 18, 2018 | ARZ998 | $0 | WGS BLOCK II FOLLOW ON |
| Nov 8, 2017 | P00106 | $0 | ESTABLISH WIDE GLOBAL SATCOM-10 LAUNCH DATE, UPDATE CONTRACT DATA REQUIREMENTS LIST&COST&SOFTWARE DATA REPORING PLAN |
| Oct 6, 2017 | P00105 | $0 | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS GOVERNMENT FURNISHED PROPERTY DISPOSITION |
| Sep 15, 2017 | P00103 | $1.6M | XENON ION PROPULSION SYSTEM ORIFICE WELD REWORK REQUEST FOR EQUITABLE ADJUSTMENT |
| Sep 15, 2017 | P00104 | $47.6K | X-BAND MITIGATION AND ANTI-JAM ENHANCEMENT INCREMENTAL FUNDING |
| Sep 5, 2017 | P00102 | $0 | ADMINSITRATIVE UPDATED TO THE LINE OF ACCOUNTING AND PAYMENT INSTRUCTIONS FOR POINT OF USE FUEL SAMPLING |
| Aug 29, 2017 | P00101 | $12.4M | WIDEBAND GLOBAL SATCOM SPACE SYSTEM RESILIENCY UPGRADE X-BAND MITIGATION |
| Aug 25, 2017 | P00098 | $0 | CONTRACT DATA REQUIREMENTS LIST, COMPLIANCE DOCUMENT LIST, AND LAUNCH MONTH UPDATE |
| Aug 10, 2017 | P00100 | $799.3K | PAYMENT FOR POINT OF USE FUEL SAMPLING FOR WIDEBAND GLOBAL SATCOM SPACE VEHICLES 8 AND 9 |
| Jul 26, 2017 | P00099 | $30.0K | ADDITIONAL FUNDING FOR TRAVEL IN SUPPORT OF THE HOSTED PAYLOAD STUDY EFFORT |
| Jul 24, 2017 | P00097 | $0 | NO COST EXCHANGE OF 2 SECURE TELEPHONES |
| May 30, 2017 | P00096 | $14.9M | FUNDS ADDITIONAL 9 MONTHS OF STORAGE FOR WIDEBAND GLOBAL SATCOM SPACE VEHICLE 10 FOR A TOTAL OF 12 MONTHS |
| May 15, 2017 | P00093 | $0 | ADMINISTRATIVE UPDATE TO PERFORMANCE BASED PAYMENT MILESTONES AND WGS 10 STORAGE LINE ITEM DESCRIPTIONS |
| Mar 23, 2017 | P00095 | $2.1M | HOSTED PAYLOAD STUDY |
| Mar 2, 2017 | A00009 | $0 | WGS BLOCK II FOLLOW ON |
| Feb 23, 2017 | P00094 | $0 | ADDITION OF CALENDAR YEAR 2017 ENGINEERING SUPPORT RATES TO SPECIAL CONTRACT REQUIREMENT CLAUSE H100 ENGINEERING SUPPORT |
| Feb 8, 2017 | A00008 | $0 | WGS BLOCK II FOLLOW ON |
| Jan 30, 2017 | P00092 | $6.3M | INCREMENTAL FUNDING FOR WIDEBAND GLOBAL SATCOM X-BAND MITIGATION AND ANTI JAM ENHANCEMENT |
| Jan 24, 2017 | P00091 | $2.8M | EXERCISE OF OPTION TO EXTEND WIDEBAND GLOBAL SATCOM VEHICLE 10 STORAGE FOR 3 MONTHS |
| Jan 19, 2017 | P00086 | $260.0K | ADDITIONAL STORAGE FOR WIDEBAND GLOBAL SATCOM SPACE VEHICLE 10 |
| Dec 19, 2016 | P00087 | $0 | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS CLAUSE CORRECTION FROM MODIFICATION P00066 |
| Dec 9, 2016 | P00090 | $4.7M | WIDEBAND GLOBAL SATCOM 7-10 INCREMENTAL FUNDING FOR PENSION PROTECTION ACT HARMONIZATION |
| Dec 8, 2016 | P00088 | $0 | NO COST ADMINISTRATIVE UPDATE TO CONTRACT DATA REQUIREMENTS LISTS AND LAUNCH DATES |
| Nov 28, 2016 | P00089 | $0 | UPDATE TO PAYLOAD HARDWARE EQUIPMENT CHAN LANGUAGE IN STATEMENT OF WORK FOR WIDEBAND GLOBAL SATCOM 7-10 |
| Oct 26, 2016 | P00085 | $0 | WIDEBAND GLOBAL SATELLITE COMMUNICATIONS 7-10, MODIFICATION TO ATTACHMENT 11 PERFORMANCE BASED PAYMENT MILESTONES |
| Sep 29, 2016 | P00084 | $8.2M | WIDEBAND GLOBAL SATELLITE COMMUNICATION 7-10 CONTRACT: BOEING PENSION PROTECTION ACT (PPA) HARMONIZATION MODIFICATION |
| Jun 16, 2016 | P00083 | $0 | WIDE BAND GLOBAL 7-10: ADDED DFARS CLAUSES 252.223-7002, 252.223-7003 AND UPDATE TO EXHIBITS SATELLITE COMMUNICATIONS |
| May 17, 2016 | P00082 | $0 | MISSION ASSURANCE FOR AEROSPACE PRESIDENT'S REVIEW UPDATE |
| May 3, 2016 | A00007 | $0 | WGS BLOCK II FOLLOW ON |
| May 2, 2016 | P00081 | $0 | NO COST CHANGES |
| Apr 25, 2016 | P00080 | $16.6M | ADDITIONAL MISSION ASSURANCE FOR WIDEBAND GLOBAL SATELLITE COMMUNICATIONS VEHICLES 8 THROUGH 10. |
| Mar 23, 2016 | P00078 | $0 | SATELLITE 9 CONTROLLED REENTRY OPTION EXERCISE |
| Mar 17, 2016 | P00079 | $23.0M | CLIN 0016 NCREMENTAL FUNDING |
| Feb 29, 2016 | P00071 | $1.8M | CCP 023 WIDEBAND GLOBAL SATELLITE COMMUNICATIONS SATELLITES 8-10 LAUNCH CAMPAIGN SUPPORT ALTERNATIVE 1 |
| Feb 16, 2016 | P00066 | $13.2M | WIDEBAND GLOBAL SATCOM MITIGATION AND ANTI-JAM ENHANCEMENT |
| Jan 27, 2016 | P00076 | $0 | NO COST EXTENSION FOR CLIN 0404 WGS 8-10 MISSION ASSURANCE FOR AEROSPACE PRESIDENT'S REVIEW |
| Jan 19, 2016 | P00075 | $39.1K | REQUEST FOR EQUITABLE ADJUSTMENT FOR WGS-7 LAUNCH SUPPORT |
| Dec 17, 2015 | P00061 | $115.7K | GLOBAL COMMUNICATIONS SATELLITES. |
| Dec 1, 2015 | P00073 | $463.3K | ENGINEERING SUPPORT RATE FOR CY 2016 AND MISSION ASSURANCE FOR AEROSPACE PRESIDENT'S REVIEW |
| Dec 1, 2015 | P00074 | $658.8K | CLIN 0015AC SATELLITE 8 CONTROLLED REENTRY OPTION EXERCISE |
| Nov 16, 2015 | P00072 | $740.0K | CY 15 MISSION ASSURANCE FOR AEROSPACE PRESIDENT'S REVIEW |
| Oct 20, 2015 | P00065 | $0 | NO COST CHANGES |
| Aug 14, 2015 | P00070 | $0 | NO COST CHANGES AND UPDATES TO COMPLIANCE ATTACHMENT 2. |
| Jun 30, 2015 | P00069 | $0 | UPDATING SPECIFICATIONS |
| May 21, 2015 | P00068 | $299.8K | ADDITIONAL RISK REDUCTION ACTIVITIES |
| May 1, 2015 | P00067 | $367.7K | ORBIT TRANSFER ACTIVITIES |
| Mar 26, 2015 | A00006 | $5.8M | WGS BLOCK II FOLLOW ON |
| Mar 25, 2015 | P00064 | $131.7K | MISSION ASSURANCE WGS-7 TASKS 2-4 |
| Feb 25, 2015 | P00063 | $64.3K | CCP-015 WGS-7 MISSION ASSURANCE ACTIVITIES - TASK 1 |
| Feb 18, 2015 | P00058 | $0 | CHANGES TO: SCR--H094 SATELLITE LAUNCH DATES, PERFORMANCE BASED PAYMENT MILESTONES;&DELETE ATCH 16 REFERENCES |
| Feb 18, 2015 | P00062 | $0 | CY2015 ENGINEERING SUPPORT RATES |
| Jan 7, 2015 | P00060 | $0 | UPDATE TO ATTACHMENT 2 "COMPLIANCE DOCUMENTS LIST" BY REVISING THE INTERFACE DESIGN DESCRIPTION (IDD), FROM REV F TO RE |
| Dec 19, 2014 | A00005 | $0 | WGS BLOCK II FOLLOW ON |
| Nov 19, 2014 | P00059 | $214.5K | INTERNATIONAL TRAFFIC IN ARMS REGULATIONS EXPORT TRAINING AND MATERIAL REVIEW FOR WIDEBAND GLOBAL SATCOM (WGS)7-8 |
| Sep 9, 2014 | P00057 | $0 | WGS-8 DELTA CRYOGENIC SECOND STAGE REENTRY STUDY PERIOD OF PERFORMANCE EXTENSION |
| Jun 30, 2014 | P00056 | $0 | CHANGES TO: OFFICE SPACE, FILTER INTALLATION, ON-ORBIT PROCEDURES, LAUNCH GRACE PERIOD; DELETE:ECONOMIC PRICE ADJUSTMENT |
| May 8, 2014 | P00054 | $567.8K | CCP 011 ESTABLISH CLIN 402, AMEND CLAUSE B058&UPDATE ATTACH 9 |
| Mar 31, 2014 | P00055 | $0 | OOHA POP EXTENSION |
| Mar 19, 2014 | P00052 | $0 | SMC H100 CY2014 LABOR RATE |
| Dec 23, 2013 | P00053 | $0 | REVISE ATTACH 2 - SCN1 UPDATE |
| Oct 30, 2013 | P00051 | $-3.7M | CLIN 0001 FINAL PRICE SETTLEMENT |
| Sep 18, 2013 | P00050 | $0 | ATTACHMENT 2 REV ROLL AND OTHER NO COST UPDATES |
| Aug 28, 2013 | P00048 | $-5.8M | CLIN 0003 AND CLIN 0005 FINAL PRICE SETTLEMENT |
| Aug 14, 2013 | A00004 | $0 | CLIN 0001 FINAL PRICE SETTLEMENT. |
| Jun 19, 2013 | P00049 | $0 | NO COST UPDATES TO ATTACHMENT 2 AND ATTACHMENT 11 |
| May 23, 2013 | A00003 | $0 | DEFINITIZE FPI CLIN 0003 AND 0005 |
| May 21, 2013 | P00047 | $0 | PAYMENT MILESTONE REALIGNMENT |
| May 7, 2013 | P00034 | $0 | UPDATING DD254 REQUIREMENTS AND TO REFLECT NOVATION AGREEMENT CHANGE |
| Mar 15, 2013 | P00046 | $3.1M | CCP 008 TEST BATTERY REFURBISHMENT |
| Mar 6, 2013 | P00029 | $0 | ICD UPDATE TO ATTACHMENT 2 WGS BLK 7-10 |
| Feb 5, 2013 | P00044 | $0 | WGS 7-10 - CHANNELIZER FUNDING REALIGNMENT FROM US TO INTERNATIONAL PARTNERS |
| Jan 31, 2013 | P00043 | $1.2M | CCP 009 SYSTEM SAFETY AUGMENTAINAND HAZARD ANALYSIS STUDY |
| Jan 30, 2013 | P00039 | $-265.9K | DE-OBLIGATFUNDS FROM RF BYPASS CLINS 0008&0009 |
| Jan 29, 2013 | P00045 | $0 | NOVATION AGREEMENT |
| Oct 29, 2012 | P00042 | $0 | WGS 7-10 ADMINISTRATIVE CORRECTIONS |
| Sep 18, 2012 | P00041 | $0 | ATTACHMENT 20 REVISION |
| Aug 13, 2012 | P00040 | $0 | CLARIFICATION OF SMC H100 |
| Jul 27, 2012 | PZ0026 | $328.2M | WGS 7-10 SV10 PROCUREMENT AND PARTS UCA DEFINITIZATION |
| Jul 10, 2012 | P00036 | $0 | CLARIFICATIONS - ATCH 4 - GFP; ATCH 6 - DD254&ATCH 16 - EPA CLAUSE |
| Jul 3, 2012 | P00038 | $0 | CORRECT LONG LINE OF ACCOUNTING |
| Jun 28, 2012 | P00033 | $2.5M | WGS 7-10, CLIN 0001 OBLIGATION OF FUNDS FOR LOA REALIGNMENT |
| Jun 28, 2012 | P00037 | $0 | WGS 7-10, CLIN 0010 POP EXTENSION |
| Jun 26, 2012 | P00028 | $110.9M | WIDEBAND DIGITAL CHANNELIZER UPGRADE |
| Jun 15, 2012 | P00035 | $0 | ATTACHMENT 2, WGS 7-10 SYSTEM SPECIFICATION UPDATE |
| May 30, 2012 | P00032 | $-2.5M | CLIN 0001&CLIN 0006 FUNDING LOA REALIGNMENT AND ADMINISTRATIVE CORRECTION |
| May 30, 2012 | P00032 | $-540 | CLIN 0001&CLIN 0006 FUNDING LOA REALIGNMENT AND ADMINISTRATIVE CORRECTION |
| May 21, 2012 | P00027 | $0 | P00027 - ADMINISTRATIVE CORRECTIONS AND POP EXTENSION |
| May 8, 2012 | P00031 | $10.5M | SV10 PARTS UCA |
| May 1, 2012 | A00001 | $-540 | SP |
| Apr 11, 2012 | P00017 | $0 | CDRL UPDATE AND ATTACHMENT 11 CORRECTION |
| Apr 9, 2012 | P00024 | $777.0K | SYSTEM SPECIFICATION UPDATE FOR NATIONAL TELECOMMUNICATIONS&INFO ADMIN (NTIA) REQUIREMENTS |
| Feb 9, 2012 | P00016 | $4.4M | SV 7 REDUNDANT PORT ACTIVATION CLIN 0006 |
| Jan 31, 2012 | P00025 | $51.1M | SV8 INCREMENTAL FUNDING FOR CLIN 0008 |
| Jan 23, 2012 | P00023 | $0 | SYSTEM SPECIFICATION UPDATE FOR END-OF-LIFE DE-ORBIT RELIABILITY REQUIREMENTS |
| Jan 13, 2012 | P00020 | $376.5M | OPTION EXERCISE SV9 |
| Jan 6, 2012 | P00022 | $0 | ADMIN CHANGES, AMT UPDATE CLIN 0005, CORRECT PBP M/S ATTACH 11 |
| Dec 30, 2011 | P00021 | $9.5M | SPACECRAFT MODERNIZATION INITIATIVE DIGITAL CHANNELIZER UPGRADE STUDY |
| Dec 22, 2011 | P00019 | $0 | INTER PARTNERS SUPPLIER AGREEMENT PROGRAM CLIN 0009, POP EXT. SV9 OPTION EXERCISE |
| Dec 15, 2011 | P00018 | $245.0M | SV 8 OPTION EXERCISE CLIN 0008 |
| Nov 15, 2011 | P00013 | $665.0K | BPUD&PPUD UNDER CLIN 0005 FACTORY RESTART |
| Nov 1, 2011 | P00015 | $0 | REVISION TO SMC-H095 LANGUAGE AND FOREIGN EXCHANGE RATE FOR F9, ATTACH 4, ATTACH 11 |
| Sep 21, 2011 | P00014 | $0 | ADMIN MOD TO CORRECT LOA |
| Aug 31, 2011 | P00006 | $441.1M | WIDEBAND GLOBAL SYSTEM (WGS) BLOCK II FOLLOW-ON (B2FO) |
| Aug 18, 2011 | P00012 | $0 | WGS - BLOCK II FOLLOW-ON - INTERFACE DESIGN DOCUMENT (IDD) UPDATE |
| Aug 4, 2011 | P00011 | $1.5M | NTE FOR SATELLITE 7 TRAVELING WAVE TUBES |
| Jul 26, 2011 | P00010 | $2.5M | WGS - BLOCK II FOLLOW-ON CLIN 0001 INCREMENTAL FUNDING - SATELLITE NRE |
| Jul 18, 2011 | P00009 | $6.2M | CLIN 0001 INCREMENTATL FUNDING, ATTCH 2 COMPLIANCE DOCUMENTS, ATTCH 8 CSDR,&CDRL G008 (IDD) UPDATES. |
| May 31, 2011 | P00008 | $0 | REVISION TO DD254 (REV. 2)- ATTACHMENT 06 |
| Feb 24, 2011 | P00007 | $0 | WGS BLOCK II FOLLOW-ON - NO COST CHANGES: ATTCH 1 SOW CORRECTION / ATTCH 13 WBS UPDATE / ATTACH 1 SOW TABLES 2&3 UPDATE |
| Jan 31, 2011 | P00005 | $0 | NSA APPROVAL OF IN-PROCESS ACCOUNTING PROCEDURE (IPAP) FOR WGS CENTRAL TELEMETRY&COMMAND UNIT (CTCU) CDRLS G051 -G063. |
| Dec 16, 2010 | P00003 | $9.0M | INCREMENTAL FUNDING OF NRE - CLIN 0001 |
| Nov 29, 2010 | P00002 | $0 | WGS BLOCK II FOLLOW ON |
| Oct 21, 2010 | P00001 | $0 | ADMINISTRATIVE CHANGE |
| Aug 19, 2010 | 0 | $164.4M | WGS BLOCK II FOLLOW ON |
| Aug 19, 2010 | 0 | $0 | WGS BLOCK II FOLLOW ON |
| Aug 19, 2010 | 0 | $0 | WGS BLOCK II FOLLOW ON |
| Aug 19, 2010 | 0 | $0 | WGS BLOCK II FOLLOW ON |
Estimated positioning window
Jan 31, 2028 – Jul 31, 2028
35/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 35/100. Available recorded signals: 30 points.
- Contract end 2029-01-31 (829 days from calculation)
- +15 points
- 0 historical awards in this buyer and category group
- +0 points
- 193 recorded award transactions
- +10 points
- Latest award action: 2026-05-06
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.