Federal contract award
FA882321C0001
SPACE BASED INFRARED SYSTEMS CONTRACTOR LOGISTICS SUPPORT. PRODUCT SUPPORT INTEGRATION, CONTRACT EVOLUTION
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | FA8815 SUSTAINMENT SN SSC/PKL |
| NAICS | 336414 — Guided Missile and Space Vehicle Manufacturing |
| PSC | R425 — Engineering and Technical Services |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIXED PRICE INCENTIVE |
| Obligations | $1.5B |
| Current contract value | $1.5B |
| Potential contract value / ceiling | $2.3B |
| Start date | Jul 2, 2021 |
| Current end date | Aug 30, 2030 |
| Potential end date | Aug 30, 2030 |
| Latest award activity | May 18, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 143 of 143 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 18, 2026 | P00142 | $19.6M | INCREMENTAL FUNDING AND UPDATE ATTACHMENT 2A |
| Apr 14, 2026 | P00141 | $44.4M | OPTION YEAR 5 4-MONTH EXTENSION |
| Apr 6, 2026 | P00140 | $0 | UPDATE ATTACHMENTS 3 AND 4, ALSO PERIOD OF PERFORMANCE EXTENSION FOR CONTRACT LINE ITEM NUMBERS 6005 AND 6014. |
| Mar 11, 2026 | P00139 | $0 | CONTRACT LINE ITEM NUMBER 6016 PERIOD OF PERFORMANCE EXTENSION |
| Mar 10, 2026 | P00138 | $76.1M | INCREMENTAL FUNDING FOR CONTRACT LINE ITEM NUMBERS 1500, 2500, 5101, 5102, 5104, 5105 AND 7500. |
| Mar 4, 2026 | P00137 | $62.3M | SURVIVABLE MOBILE GROUND SYSTEM POST INITIAL OPERATIONAL CAPABILITY MODIFICATIONS |
| Feb 10, 2026 | P00136 | $0 | UPDATE ATTACHMENT 4 AND CONTRACT LINE ITEM NUMBER 4400 PERIOD OR PERFORMANCE EXTENSION |
| Jan 27, 2026 | P00135 | $11.5M | INCREMENTAL FUNDING FOR CONTRACT LINE ITEM NUMBERS 5101, 5102, 5104 AND 5105 |
| Jan 13, 2026 | P00134 | $3.1M | CONTRACT LINE ITEM NUMBER 9000 INCREMENTAL FUNDING |
| Jan 8, 2026 | P00132 | $251.3K | PERIOD OF PERFORMANCE EXTENSION FOR CONTRACT LINE ITEM NUMBERS 5002 AND 6005 AND PROPOSAL PREPARATION COSTS ON CONTRACT LINE ITEM NUMBER 6010 |
| Jan 8, 2026 | P00133 | $67.7M | EXERCISE CONTRACT LINE ITEM NUMBERS 1500, 2500, 4500, 5101, 5102, 5103, 5104, 5105, 5106 AND 7500 WITH INCREMENTAL FUNDING. |
| Dec 11, 2025 | P00131 | $0 | UPDATE CONTRACT LINE ITEM NUMBERS 5101, 5102, 5104 AND 5105 |
| Dec 3, 2025 | P00129 | $0 | UPDATE ATTACHMENT 13 AND CONTRACT LINE ITEM NUMBER 6008 PERIOD OF PERFORMANCE EXTENSION |
| Dec 3, 2025 | P00130 | $2.0M | CONTRACT LINE ITEM NUMBER 9000 INCREMENTAL FUNDING |
| Nov 24, 2025 | P00128 | $-215.8K | UPDATE CONTRACT LINE ITEM NUMBERS 5001, 5002, 5004 AND 5005 VALUES |
| Oct 23, 2025 | P00127 | $960.2K | INCREMENTALLY FUND CONTRACT LINE ITEM NUMBERS 6008 & 9000 |
| Sep 30, 2025 | P00121 | $7.7M | DEFINITIZE CONTRACT LINE-ITEM NUMBERS 5001, 5002, 5004 AND 5005 |
| Sep 30, 2025 | P00126 | $1.9M | CONTRACT LINE ITEM NUMBER 6011 INCREASE AND CONTRACT LINE ITEM NUMBER 6005 PERIOD OF PERFORMANCE EXTENSION |
| Sep 25, 2025 | P00125 | $5.5M | FINANCIAL IMPROVEMENT AND AUDIT READINESS CONTRACTOR INVENTORY CONTROL POINT |
| Sep 24, 2025 | P00124 | $141.3K | CONTRACT LINE ITEM NUMBER 7400 VALUE AND FUNDING INCREASE |
| Sep 23, 2025 | P00123 | $463.6K | CONTRACT LINE ITEM NUMBER 5002 INCREMENTAL FUNDING |
| Sep 18, 2025 | P00122 | $2.2M | CONTRACT LINE ITEM NUMBER 4400 INCREMENTAL FUNDING |
| Sep 8, 2025 | P00119 | $0 | UPDATE ATTACHMENTS 4 AND 13 |
| Sep 8, 2025 | P00120 | $385.7K | CONTRACT LINE ITEM NUMBER 6008 INCREMENTAL FUNDING |
| Aug 28, 2025 | P00118 | $12.2M | CONTRACT LINE ITEM NUMBER 1400 ANNUAL MAINTENANCE AND SERVICE AGREEMENTS. |
| Aug 1, 2025 | P00115 | $0 | UPDATE ATTACHMENT 3 - DEPARTMENT OF DEFENSE FORM 254 |
| Jul 21, 2025 | P00116 | $0 | REALIGN FUNDING FROM CONTRACT LINE ITEM NUMBER 9000 TO 6008 |
| Jul 21, 2025 | P00117 | $6.6M | PROVIDE FUNDING AND UPDATE NOT TO EXCEED AMOUNTS FOR CONTRACT LINE ITEM NUMBERS 5001, 5002, 5004 AND 5005. |
| Jul 16, 2025 | P00112 | $1.2M | CONTRACT LINE ITEM NUMBER 6023 BUCKLEY WAREHOUSE RELOCATION DEFINITIZATION |
| Jul 8, 2025 | P00114 | $0 | INCREASE THE NOT-TO-EXCEED AMOUNT FOR CONTRACT LINE ITEM NUMBER 5001 |
| Jul 2, 2025 | P00113 | $400.0K | INCREMENTAL FUNDING FOR CONTRACT LINE ITEM NUMBER 6008 |
| Jun 10, 2025 | P00111 | $0 | PERIOD OF PERFORMANCE AND UPDATE THE NOT TO EXCEED AMOUNT TO INCLUDE OPTION YEAR 4 |
| Jun 5, 2025 | P00110 | $0 | CONTRACT LINE ITEM NUMBER 6022 NO COST PERIOD OF PERFORMANCE EXTENSION |
| May 28, 2025 | P00109 | $1.0M | CONTRACT LINE ITEM NUMBER 6023 INCREMENTAL FUNDING |
| May 21, 2025 | P00107 | $178.2K | CONTRACT LINE ITEM NUMBER 6020 VALUE INCREASE AND CONTRACT LINE ITEM NUMBER 6010 VALUE DECREASE |
| May 14, 2025 | P00108 | $113.1M | INCREMENTAL FUNDING TO THE FULL AMOUNT FOR CONTRACT LINE ITEM NUMBERS 1400, 2400 AND 7400. |
| May 8, 2025 | P00106 | $1.6M | PROPOSAL PREPARATION COSTS FOR CONTRACT LINE ITEM NUMBER 6010 |
| Apr 29, 2025 | P00105 | $13.1M | SPACE BASED INFRARED SYSTEMS MOBILE GROUND SYSTEM SUSTAINMENT AND OPERATIONS UNPRICED CHANGE ORDER |
| Apr 14, 2025 | P00102 | $430.0K | PROPOSAL PREPARATION COSTS ON CONTRACT LINE ITEM NUMBER 6010 AND PERIOD OF PERFORMANCE EXTENSION FOR CONTRACT LINE ITEM NUMBER 6011 |
| Apr 7, 2025 | P00104 | $2.6M | CONTRACT LINE ITEM NUMBER 6008 INCREMENTAL FUNDING |
| Mar 14, 2025 | P00098 | $400.3K | CONTRACT LINE ITEM NUMBER 6008 VALUE AND OBLIGATION INCREASE |
| Mar 4, 2025 | P00097 | $239.6K | BALLISTIC MISSILE DEFENSE SYSTEM OVERHEAD PERSISTENT INFRARED ARCHITECTURE |
| Feb 26, 2025 | P00100 | $32.8M | INCREMENTAL FUNDING FOR CONTRACT LINE ITEM NUMBERS 1400, 2400 AND 7400 |
| Feb 24, 2025 | P00099 | $2.0M | BUCKLEY WAREHOUSE RELOCATION UNPRICED CHANGE ORDER |
| Feb 12, 2025 | P00095 | $-713.7K | CONTRACT LINE ITEM NUMBER 6003 VALUE AND OBLIGATION DECREASE |
| Feb 4, 2025 | P00092 | $0 | UPDATE ATTACHMENT 11 |
| Feb 4, 2025 | P00094 | $3.0M | CONTRACT LINE ITEM NUMBER 9000 ADDITIONAL SCOPE |
| Jan 29, 2025 | P00093 | $1.1M | CONTRACT LINE ITEM NUMBER 6014 REQUEST FOR EQUITABLE ADJUSTMENT |
| Jan 29, 2025 | P00096 | $3.0M | CONTRACT LINE ITEM NUMBER 6008 INCREMENTAL FUNDING |
| Jan 8, 2025 | P00091 | $0 | UPDATE ATTACHMENT 3 DD254 |
| Dec 12, 2024 | P00090 | $0 | CONTRACT LINE ITEM NUMBER 6003 PERIOD OF PERFORMANCE EXTENSION |
| Nov 20, 2024 | P00088 | $0 | UPDATE CONTRACT LINE ITEM NUMBER 2400 SECTION B LANGUAGE |
| Nov 19, 2024 | P00089 | $857.7K | CONTRACT LINE ITEM NUMBER 6010 VALUE AND OBLIGATION INCREASE FOR PROPOSAL PREPARATION COSTS. |
| Nov 13, 2024 | P00086 | $2.0M | CONTRACT LINE ITEM NUMBER 6007 VALUE AND OBLIGATION AMOUNT INCREASE |
| Nov 7, 2024 | P00087 | $50.9M | EXERCISE OPTION YEAR 4 AND INCREMENTAL FUNDING |
| Oct 30, 2024 | P00085 | $0 | CONTRACT LINE ITEM NUMBER 2200 PERIOD OF PERFORMANCE EXTENSION AND UNIT OF MEASURE CHANGE. |
| Oct 28, 2024 | P00084 | $5.6M | CONTRACT LINE ITEM NUMBER 6008 INCREMENTAL FUNDING |
| Oct 7, 2024 | P00082 | $3.3M | CONTRACT LINE ITEM NUMBER 9000 ADDITIONAL SCOPE AND FUNDING |
| Sep 30, 2024 | P00083 | $980.3K | CONTRACT LINE ITEM NUMBER 6012 VALUE AND OBLIGATION INCREASE |
| Sep 24, 2024 | P00081 | $13.4M | CONTRACT LINE ITEM NUMBER 1300 MATERIAL CONTRACTOR ACQUIRED PROPERTY AND CONTRACT LINE ITEM NUMBER 7300 ENVIRONMENTAL ADDER. |
| Sep 18, 2024 | P00080 | $8.8M | CROSS DOMAIN SOLUTION PHASE 2 |
| Sep 17, 2024 | P00078 | $5.1M | GROUND CONTROL NETWORK ROADMAP PROJECT |
| Sep 9, 2024 | P00079 | $0 | UPDATE TO ATTACHMENTS 11 AND 16 |
| Aug 15, 2024 | P00077 | $0 | CONTRACT LINE ITEM NUMBER 9001 PERIOD OF PERFORMANCE EXTENSION, UPDATE UNIT OF MEASURE AND QUANTITY. |
| Aug 13, 2024 | P00076 | $0 | UPDATE EXHIBIT A TO INCLUDE FINANCIAL IMPROVEMENT AND AUDIT READINESS REQUIREMENT |
| Aug 2, 2024 | A00002 | $0 | RESCIND A00001 |
| Aug 1, 2024 | P00075 | $0 | PERIOD OF PERFORMANCE EXTENSION FOR CONTRACT LINE ITEM NUMBERS 2200 AND 9001. |
| Jul 31, 2024 | P00074 | $534 | INCREMENTAL FUNDING FOR CONTRACT LINE ITEM NUMBER 9001 |
| Jul 18, 2024 | A00001 | $0 | ADD CLAUSE FAR 52.245-7005 MANAGEMENT AND REPORTING OF GOVERNMENT PROPERTY |
| Jul 18, 2024 | P00073 | $0 | CONTRACT LINE ITEM NUMBER 9000 PERIOD OF PERFORMANCE EXTENSION AND ATTACHMENT 4 UPDATE |
| Jul 9, 2024 | P00072 | $4.0M | CONTRACT LINE ITEM NUMBER 6008 $4,000,000.00 INCREMENTAL FUNDING |
| Jun 12, 2024 | P00071 | $0 | CONTRACT LINE ITEM NUMBER 6003 PERIOD OF PERFORMANCE EXTENSION AND ATTACHMENT 4 UPDATE. |
| Apr 23, 2024 | P00069 | $9.5M | CONTRACT LINE ITEM NUMBER 6016 ANTENNA CONTROL SYSTEM PROJECT |
| Apr 18, 2024 | P00070 | $82.0M | INCREMENTAL FUNDING FOR OPTION YEAR 3 CONTRACT LINE ITEM NUMBERS |
| Apr 3, 2024 | P00068 | $800.0K | CONTRACT LINE ITEM NUMBER 6004 OVERRUN FUNDING |
| Apr 1, 2024 | P00067 | $0 | PERIOD OF PERFORMANCE EXTENSION FOR CONTRACT LINE ITEM NUMBERS 6003 AND 9000. |
| Mar 5, 2024 | P00066 | $17.4M | INCREMENTAL FUNDING FOR CONTRACT LINE ITEM NUMBERS 1300, 2300, 4300 AND 7300. |
| Mar 1, 2024 | P00064 | $46.2M | NETWORK AND FIREWALL OBSOLESCENCE |
| Feb 29, 2024 | P00065 | $4.0M | CONTRACT LINE ITEM NUMBER 6008 INCREMENTAL FUNDING |
| Jan 17, 2024 | P00062 | $0 | UPDATE ATTACHMENT 2A |
| Dec 20, 2023 | P00063 | $48.9M | INCREMENTAL FUNDING FOR CONTRACT LINE ITEM NUMBERS 1300, 2300, 4300 AND 7300. |
| Dec 7, 2023 | P00061 | $48.5M | EXERCISE OPTION YEAR 3 AND INCREMENTAL FUNDING |
| Nov 15, 2023 | P00060 | $10.4M | CONTRACT LINE ITEM NUMBER 6011 COMMAND TELEMETRY LINK EXTENDERS & SPACE CRYPTO OBSOLESCENCE. |
| Sep 27, 2023 | P00059 | $14.3M | CONTRACT LINE ITEM NUMBERS 1200 AND 6003 CONTRACT VALUE AND OBLIGATION AMOUNT INCREASE, PROPOSAL PREPARATION COSTS FOR CONTRACT LINE ITEM NUMBER 6010, AND EXTEND THE PERIOD OF PERFORMANCE FOR 6003. |
| Sep 12, 2023 | P00058 | $26.0M | FISCAL YEAR 2023 3410 FUNDED PROJECTS |
| Sep 7, 2023 | P00057 | $575.0K | CONTRACT LINE ITEM NUMBERS 6003 AND 7200 VALUE INCREASE, CONTRACT LINE ITEM NUMBER 6001 PERIOD OF PERFORMANCE EXTENSION, UPDATE ATTACHMENTS 4, 11, 14 AND 16 |
| Jul 24, 2023 | P00056 | $965.0K | CONTRACT LINE ITEM NUMBER 1000 FINAL PRICE DETERMINATION PAYMENT |
| Jul 20, 2023 | P00054 | $4.8M | FIGHT TONIGHT - FALSE TRACK REDUCTION |
| Jul 12, 2023 | P00055 | $0 | CORRECT THE LINE OF ACCOUNTING FOR MODIFICATION P00053 ON CONTRACT LINE ITEM NUMBER 6004 |
| Jun 28, 2023 | P00053 | $572.5K | CONTRACT LINE ITEM NUMBERS 6002 AND 6004 PERIOD OF PERFORMANCE EXTENSION, CONTRACT LINE ITEM NUMBERS 6003 AND 6004 VALUE INCREASE AND FUNDING, AND UPDATE ATTACHMENT 4. |
| May 23, 2023 | P00052 | $2.3M | CONTRACT LINE ITEM NUMBER 6003 OVERRUN, CONTRACT LINE ITEM NUMBERS 6003 AND 9000 PERIOD OF PERFORMANCE EXTENSION. |
| May 16, 2023 | P00050 | $1.8M | RADIOMETRIC CALIBRATION |
| Apr 19, 2023 | P00051 | $0 | ISSUED BY DEPARTMENT OF DEFENSE ACTIVITY ADDRESS CODE CHANGE FROM FA8823 TO FA8815. |
| Apr 5, 2023 | P00049 | $10.0M | FUTURE OPERATIONALLY RESILIENT GROUND EVOLUTION - AUDIO VISUAL SUB-SYSTEMS OBSOLESCENCE AND MISSION PERFORMANCE SCENARIOS AND UPDATE EXHIBIT B |
| Feb 23, 2023 | P00048 | $0 | CONTRACT LINE ITEM NUMBER 9000 PERIOD OF PERFORMANCE EXTENSION, ADD EXHIBIT B AND ATTACHMENT 12, AND INCLUDE CLOSE OUT LANGUAGE. |
| Feb 8, 2023 | P00047 | $0 | TRANSFER FUNDS FROM INACTIVE LINE OF ACCOUNTING TO NEW LINE OF ACCOUNTING FOR CONTRACT LINE ITEM NUMBER 9000 |
| Jan 31, 2023 | P00046 | $0 | CONTRACT LINE ITEM NUMBER 1100 AND 2100 PERIOD OF PERFORMANCE EXTENSION AND OVERRUN FUNDING FOR CONTRACT LINE ITEM NUMBER 6003. |
| Jan 12, 2023 | P00045 | $179.2M | FUND CONTRACT LINE ITEM NUMBERS 1200, 2200, 4200 AND 7200 TO FULL AMOUNTS |
| Dec 21, 2022 | P00044 | $0 | CONTRACT LINE ITEM NUMBER 6002 PERIOD OF PERFORMANCE EXTENSION |
| Dec 13, 2022 | P00043 | $16.7M | ENHANCED SPACE BASED INFRARED SYSTEM OPERATIONAL AGILE RESPONSE PROGRAM OF RECORD |
| Nov 28, 2022 | P00042 | $0 | CONTRACT LINE ITEM NUMBER 4100 PERIOD OF PERFORMANCE EXTENSION AND ADMINISTRATIVE UPDATE |
| Nov 10, 2022 | P00041 | $17.0M | EXERCISE OPTION YEAR 2 AND INCREMENTALLY FUND |
| Nov 9, 2022 | P00040 | $2.3M | INCREMENTALLY FUND CONTRACT LINE ITEM NUMBER 4100 |
| Oct 27, 2022 | P00039 | $0 | UPDATE ATTACHMENT 4 AND CORRECT THE ADMINISTERED BY ADDRESS |
| Sep 29, 2022 | P00035 | $2.1M | CONTRACT LINE ITEM NUMBER 1100 MATERIAL BUY |
| Sep 28, 2022 | P00038 | $15.6M | FISCAL YEAR 22 PROJECTS CONTRACT LINE ITEM NUMBER 6005 |
| Sep 27, 2022 | P00036 | $161.1K | FUNDING ENVIRONMENTAL ADDER COST OVERRUN |
| Sep 26, 2022 | P00037 | $4.6M | CONTRACT LINE ITEM NUMBER 6006 COMMON DATABASE MIGRATION |
| Aug 4, 2022 | P00034 | $2.0M | INCREMENTAL FUNDING ON CONTRACT LINE ITEM NUMBER 1100 |
| Jul 12, 2022 | P00033 | $400.0K | GROUND COMMUNICATION NETWORK MODERNIZATION COST IMPACT PROJECT FOR RELOCATION |
| Jul 8, 2022 | P00032 | $0 | FINAL PRICE DETERMINATION FOR CONTRACT LINE ITEM NUMBER 1000 |
| Jun 13, 2022 | P00031 | $4.6M | FUND CONTRACT LINE ITEM NUMBERS 1100 AND 2100 TO FULL ESTIMATED VALUES |
| May 31, 2022 | P00030 | $20.3M | INCREMENTAL FUNDING FOR CONTRACT LINE ITEM NUMBERS 1100 AND 2100 |
| May 12, 2022 | P00029 | $89.6M | INCREMENTAL FUNDING FOR CONTRACT LINE ITEM NUMBERS 1100 AND 2100 |
| May 3, 2022 | P00028 | $0 | UPDATE CLAUSES AND ADD ATTACHMENT 11 |
| Apr 14, 2022 | P00027 | $2.5M | INCREMENTAL FUNDING FOR CONTRACT LINE ITEM NUMBERS 1100 AND 2100 |
| Mar 30, 2022 | P00025 | $0 | CONTRACT LINE ITEM NUMBER 9000 PERIOD OF PERFORMANCE EXTENSION AND UPDATE ATTACHMENT 2B |
| Mar 21, 2022 | P00026 | $24.7M | CONTRACT LINE ITEM NUMBER 1100 AND 2100 FUNDING AND ADMIN UPDATE TO DATA DESCRIPTION FOR CONTRACT LINE ITEM NUMBER 6004 |
| Mar 7, 2022 | P00024 | $6.0M | INCREMENTAL FUNDING FOR CONTRACT LINE ITEM NUMBERS 1100 AND 2100 |
| Feb 10, 2022 | P00023 | $0 | ADMINISTRATIVE MOD TO CORRECT "SHIP TO CODE" FROM F3LGSS TO FA8823 |
| Feb 4, 2022 | P00022 | $-1.3M | DEOBLIGATE CONTRACT LINE ITEM NUMBER 4100 AND FUND CONTRACT LINE ITEM NUMBER 7100 |
| Jan 25, 2022 | P00018 | $13.5M | PERIOD OF PERFORMANCE REALIGNMENT AND INCREMENTAL FUNDING FOR CONTRACT LINE ITEM NUMBER 1100 |
| Jan 19, 2022 | P00021 | $-13.8M | DEOBLIGATE FUNDS FROM CONTRACT LINE ITEM NUMBERS 1000, 2000 AND 7000 |
| Jan 5, 2022 | P00020 | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT LINE OF ACCOUNTING ON CONTRACT LINE ITEM NUMBER 6004 |
| Jan 3, 2022 | P00019 | $32.4M | EXERCISE OPTION YEAR 1 AND INCREMENTAL FUNDING |
| Dec 7, 2021 | P00017 | $8.5M | FUND CONTRACT LINE ITEM NUMBER 9000 TO THE ESTIMATED TOTAL PRICE |
| Nov 29, 2021 | P00016 | $6.4M | EXERCISE OPTION CONTRACT LINE ITEM NUMBER 6004 |
| Nov 22, 2021 | P00014 | $700.0K | GEOSYNCHRONOUS EARTH ORBIT-6 10G BANDWIDTH UPGRADE |
| Nov 17, 2021 | P00015 | $0 | DEOBLIGATE FUNDS ON CONTRACT LINE ITEM NUMBER 100015 AND OBLIGATE FUNDS ON CORRECTED CONTRACT LINE ITEM NUMBER 100017 |
| Nov 16, 2021 | P00012 | $0 | EO14042 - EXECUTIVE ORDER 14042 INCORPORATE CLAUSE 252.223-7999 |
| Nov 10, 2021 | P00013 | $0 | UPDATE ATTACHMENT 2A - PERFORMANCE WORK STATEMENT |
| Oct 22, 2021 | P00011 | $43.0M | INCREMENTAL FUNDING FOR CONTRACT LINE ITEM NUMBERS 1000 AND 2000, UPDATE PROGRESS PAYMENT AND LIQUIDATION RATE IN ACCORDANCE WITH FAR 52.232-16, PROGRESS PAYMENTS (DEVIATION 2020-O0010) |
| Sep 30, 2021 | P00010 | $1.1M | INCREMENTAL FUNDING ON CONTRACT LINE ITEM NUMBER 2000 |
| Sep 21, 2021 | P00009 | $26.9M | FISCAL YEAR 21 PROJECTS WITH INCREMENTAL FUNDING FOR CONTRACT LINE ITEM NUMBERS 1000 AND 2000. |
| Sep 15, 2021 | P00008 | $20.0M | ANTENNA CONTROL SYSTEM HARDWARE OBSOLESCENCE AND GEOSYNCHRONOUS EARTH ORBIT 6 EXPANSION PROJECTS, INCREMENTAL FUNDING FOR CONTRACT LINE ITEM NUMBERS 1000 AND 2000. |
| Aug 13, 2021 | P00007 | $3.0M | FUTURE OPERATIONALLY RESILIENT GROUND EVOLUTION AWARD |
| Aug 5, 2021 | P00006 | $8.6M | CONTRACT LINE ITEM NUMBER 1000 INCREMENTAL FUNDING AND UPDATE ATTACHMENT 2A |
| Jul 13, 2021 | P00005 | $0 | REALIGN FUNDS FROM CONTRACT LINE ITEM NUMBER 100001 TO 100006. |
| Jul 8, 2021 | P00004 | $0 | ADD CLAUSE: G001 SPECIAL PAY INSTRUCTIONS FOR PROGRESS PAYMENTS JANUARY 2015 |
| Jun 28, 2021 | P00003 | $5.5M | INCREMENTALLY FUND CONTRACT LINE ITEM NUMBER 2000 AND FULLY FUND CONTRACT LINE ITEM NUMBER 7000 |
| Jun 16, 2021 | P00002 | $22.3M | SPACE BASED INFRARED SYSTEMS CONTRACTOR LOGISTICS SUPPORT. PRODUCT SUPPORT INTEGRATION, CONTRACT EVOLUTION |
| Jun 10, 2021 | P00001 | $0 | UPDATE DEFENSE CONTRACT MANAGEMENT AGENCY ADDRESS, ATTACHMENT 3 AND 3B |
| Jun 4, 2021 | 0 | $0 | SPACE BASED INFRARED SYSTEMS CONTRACTOR LOGISTICS SUPPORT. PRODUCT SUPPORT INTEGRATION, CONTRACT EVOLUTION |
Estimated positioning window
Aug 30, 2029 – Feb 28, 2030
35/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 35/100. Available recorded signals: 30 points.
- Contract end 2030-08-30 (1398 days from calculation)
- +5 points
- 1 historical awards in this buyer and category group
- +0 points
- 143 recorded award transactions
- +10 points
- Latest award action: 2026-05-18
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.