Federal contract award

FA910125FB025

THE PRIMARY PURPOSE OF THE REQUIREMENT IS TO OBTAIN A NON-INTRUSIVE MEASUREMENT SYSTEM CAPABLE OF MEASURING STATIC PRESSURE, STATIC TEMPERATURE, VELOCITY, UNBURNED FUEL, AND MASS FLOW AT THE DIRECT CONNECT NOZZLE AND FREEJET NOZZLE EXITS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA9101 AEDC PKP PROCRMNT BR
NAICS334516 — Analytical Laboratory Instrument Manufacturing
PSC6675 — Drafting, Surveying, and Mapping Instruments
Parent award / vehicleFA910125DB008
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$2.2M
Current contract value$2.2M
Potential contract value / ceiling$2.2M
Start dateMay 16, 2025
Current end dateJul 21, 2026
Potential end dateJul 21, 2026
Latest award activityMar 4, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Mar 4, 2026P00002$0THE PRIMARY PURPOSE OF THE REQUIREMENT IS TO OBTAIN A NON-INTRUSIVE MEASUREMENT SYSTEM CAPABLE OF MEASURING STATIC PRESSURE, STATIC TEMPERATURE, VELOCITY, UNBURNED FUEL, AND MASS FLOW AT THE DIRECT CONNECT NOZZLE AND FREEJET NOZZLE EXITS.
Aug 4, 2025P00001$0THE PRIMARY PURPOSE OF THE REQUIREMENT IS TO OBTAIN A NON-INTRUSIVE MEASUREMENT SYSTEM CAPABLE OF MEASURING STATIC PRESSURE, STATIC TEMPERATURE, VELOCITY, UNBURNED FUEL, AND MASS FLOW AT THE DIRECT CONNECT NOZZLE AND FREEJET NOZZLE EXITS.
May 16, 20250$2.2MTHE PRIMARY PURPOSE OF THE REQUIREMENT IS TO OBTAIN A NON-INTRUSIVE MEASUREMENT SYSTEM CAPABLE OF MEASURING STATIC PRESSURE, STATIC TEMPERATURE, VELOCITY, UNBURNED FUEL, AND MASS FLOW AT THE DIRECT CONNECT NOZZLE AND FREEJET NOZZLE EXITS.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.