Federal contract award
FA910125FB025
THE PRIMARY PURPOSE OF THE REQUIREMENT IS TO OBTAIN A NON-INTRUSIVE MEASUREMENT SYSTEM CAPABLE OF MEASURING STATIC PRESSURE, STATIC TEMPERATURE, VELOCITY, UNBURNED FUEL, AND MASS FLOW AT THE DIRECT CONNECT NOZZLE AND FREEJET NOZZLE EXITS.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | FA9101 AEDC PKP PROCRMNT BR |
| NAICS | 334516 — Analytical Laboratory Instrument Manufacturing |
| PSC | 6675 — Drafting, Surveying, and Mapping Instruments |
| Parent award / vehicle | FA910125DB008 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $2.2M |
| Current contract value | $2.2M |
| Potential contract value / ceiling | $2.2M |
| Start date | May 16, 2025 |
| Current end date | Jul 21, 2026 |
| Potential end date | Jul 21, 2026 |
| Latest award activity | Mar 4, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Mar 4, 2026 | P00002 | $0 | THE PRIMARY PURPOSE OF THE REQUIREMENT IS TO OBTAIN A NON-INTRUSIVE MEASUREMENT SYSTEM CAPABLE OF MEASURING STATIC PRESSURE, STATIC TEMPERATURE, VELOCITY, UNBURNED FUEL, AND MASS FLOW AT THE DIRECT CONNECT NOZZLE AND FREEJET NOZZLE EXITS. |
| Aug 4, 2025 | P00001 | $0 | THE PRIMARY PURPOSE OF THE REQUIREMENT IS TO OBTAIN A NON-INTRUSIVE MEASUREMENT SYSTEM CAPABLE OF MEASURING STATIC PRESSURE, STATIC TEMPERATURE, VELOCITY, UNBURNED FUEL, AND MASS FLOW AT THE DIRECT CONNECT NOZZLE AND FREEJET NOZZLE EXITS. |
| May 16, 2025 | 0 | $2.2M | THE PRIMARY PURPOSE OF THE REQUIREMENT IS TO OBTAIN A NON-INTRUSIVE MEASUREMENT SYSTEM CAPABLE OF MEASURING STATIC PRESSURE, STATIC TEMPERATURE, VELOCITY, UNBURNED FUEL, AND MASS FLOW AT THE DIRECT CONNECT NOZZLE AND FREEJET NOZZLE EXITS. |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.