Federal contract award

FA945123CA010

HIGH POWERED ELECTROMAGNETIC (HPEM) MODELING SIMULATION AND ANALYSIS

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA9451 AFRL RDK
NAICS541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
PSCAC12 — NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; APPLIED RESEARCH
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$1.5M
Current contract value$3.7M
Potential contract value / ceiling$3.7M
Start dateJun 8, 2023
Current end dateJun 7, 2028
Potential end dateJun 7, 2028
Latest award activityJun 9, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 15 of 15 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 9, 2026P00014$150.0KHIGH POWER ELECTROMAGNETICS (HPEM) MODELING SIMULATION AND ANALYSIS
Jul 1, 2025P00013$35.0KHIGH POWERED ELECTROMAGNETIC (HPEM) MODELING SIMULATION AND ANALYSIS
Jun 30, 2025P00012$27.5KHIGH POWERED ELECTROMAGNETIC (HPEM) MODELING SIMULATION AND ANALYSIS
Jun 24, 2025P00011$75.0KHIGH POWERED ELECTROMAGNETIC (HPEM) MODELING SIMULATION AND ANALYSIS
Apr 17, 2025P00010$0HIGH POWERED ELECTROMAGNETIC (HPEM) MODELING SIMULATION AND ANALYSIS
Nov 25, 2024P00009$60.0KHIGH POWERED ELECTROMAGNETIC (HPEM) MODELING SIMULATION AND ANALYSIS
Sep 26, 2024P00008$76.2KHIGH POWERED ELECTROMAGNETIC (HPEM) MODELING SIMULATION AND ANALYSIS
Sep 10, 2024P00007$32.3KHIGH POWERED ELECTROMAGNETIC (HPEM) MODELING SIMULATION AND ANALYSIS
Jun 4, 2024P00006$60.0KHIGH POWERED ELECTROMAGNETIC (HPEM) MODELING SIMULATION AND ANALYSIS
Mar 19, 2024P00005$530.0KHIGH POWERED ELECTROMAGNETIC (HPEM) MODELING SIMULATION AND ANALYSIS
Dec 15, 2023P00004$100.0KHIGH POWERED ELECTROMAGNETIC (HPEM) MODELING SIMULATION AND ANALYSIS
Aug 18, 2023P00003$200.0KHIGH POWERED ELECTROMAGNETIC (HPEM) MODELING SIMULATION AND ANALYSIS
Aug 4, 2023P00002$0HIGH POWERED ELECTROMAGNETIC (HPEM) MODELING SIMULATION AND ANALYSIS
Jul 19, 2023P00001$0HIGH POWERED ELECTROMAGNETIC (HPEM) MODELING SIMULATIONAND ANALYSIS
Jun 1, 20230$200.0KHIGH POWERED ELECTROMAGNETIC (HPEM) MODELING SIMULATION AND ANALYSIS

Estimated positioning window

Jun 7, 2027 – Dec 7, 2027

Recompete signal:
60/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 60/100. Available recorded signals: 55 points.

Contract end 2028-06-07 (591 days from calculation)
+25 points
44 historical awards in this buyer and category group
+15 points
15 recorded award transactions
+10 points
Latest award action: 2026-06-09
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.