Federal contract award

FA945124CX009

HIGH-POWER ELECTROMAGNETIC (HPEM) NUMERICAL SIMULATION TOOL DEVELOPMENT

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeFA9451 AFRL RDK
NAICS541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
PSCAC12 — NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; APPLIED RESEARCH
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$1.8M
Current contract value$3.7M
Potential contract value / ceiling$3.7M
Start dateDec 15, 2023
Current end dateDec 15, 2028
Potential end dateDec 15, 2028
Latest award activityMay 7, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 19 of 19 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 7, 2026P00018$152.5KHIGH POWER ELECTROMAGNETIC (HPEM) NUMERICAL SIMULATION TOOL DEVELOPMENT INCORPORATES HPEM SYSTEM PERFORMANCE MODELING AND SIMULATION CAPABILITIES OR THEIR RESULTS INTO MISSION AND CAMPAIGN LEVEL MODELING TOOLS.
Mar 23, 2026P00017$375.0KHIGH POWER ELECTROMAGNETIC (HPEM) NUMERICAL SIMULATION TOOL DEVELOPMENT
Aug 20, 2025P00016$35.0KHIGH POWER ELECTROMAGNETIC (HPEM) NUMERICAL SIMULATION TOOL DEVELOPMENT
Jul 31, 2025P00015$165.0KHIGH POWER ELECTROMAGNETIC (HPEM) NUMERICAL SIMULATION TOOL DEVELOPMENT
Jul 8, 2025P00014$55.0KHIGH POWER ELECTROMAGNETIC (HPEM) NUMERICAL SIMULATION TOOL DEVELOPMENT
May 9, 2025P00013$0HIGH POWER ELECTROMAGNETIC (HPEM) NUMERICAL SIMULATION TOOL DEVELOPMENT
Feb 21, 2025P00012$195.0KHIGH POWER ELECTROMAGNETIC (HPEM) NUMERICAL SIMULATION TOOL DEVELOPMENT
Nov 13, 2024P00011$100.0KHIGH POWER ELECTROMAGNETIC (HPEM) NUMERICAL SIMULATION TOOL DEVELOPMENT
Sep 23, 2024P00010$23.5KHIGH POWER ELECTROMAGNETIC (HPEM) NUMERICAL SIMULATION TOOL DEVELOPMENT
Sep 18, 2024P00009$2.2KHIGH POWER ELECTROMAGNETIC (HPEM) NUMERICAL SIMULATION TOOL DEVELOPMENT
Sep 12, 2024P00008$32.3KHIGH POWER ELECTROMAGNETIC (HPEM) NUMERICAL SIMULATION TOOL DEVELOPMENT
Sep 3, 2024P00007$55.0KHIGH POWER ELECTROMAGNETIC (HPEM) NUMERICAL SIMULATION TOOL DEVELOPMENT
Aug 21, 2024P00006$0HIGH POWER ELECTROMAGNETIC (HPEM) NUMERICAL SIMULATION TOOL DEVELOPMENT
Mar 29, 2024P00005$75.0KHIGH POWER ELECTROMAGNETIC (HPEM) NUMERICAL SIMULATION TOOL DEVELOPMENT
Mar 26, 2024P00004$0HIGH POWER ELECTROMAGNETIC (HPEM) NUMERICAL SIMULATION TOOL DEVELOPMENT
Mar 15, 2024P00003$180.0KHIGH POWER ELECTROMAGNETIC (HPEM) NUMERICAL SIMULATION TOOL DEVELOPMENT
Mar 4, 2024P00002$202.0KHIGH POWER ELECTROMAGNETIC (HPEM) NUMERICAL SIMULATION TOOL DEVELOPMENT
Jan 26, 2024P00001$0HIGH-POWER ELECTROMAGNETIC (HPEM) NUMERICAL SIMULATION TOOL DEVELOPMENT
Dec 13, 20230$150.0KHIGH-POWER ELECTROMAGNETIC (HPEM) NUMERICAL SIMULATION TOOL DEVELOPMENT

Estimated positioning window

Dec 15, 2027 – Jun 15, 2028

Recompete signal:
50/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 50/100. Available recorded signals: 45 points.

Contract end 2028-12-15 (782 days from calculation)
+15 points
44 historical awards in this buyer and category group
+15 points
19 recorded award transactions
+10 points
Latest award action: 2026-05-07
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.