Federal contract award

FA945319C0009

THIS REQUIREMENT IS TO PERFORM RESEARCH AND DEVELOPMENT TO IMPROVE THE DENSITY, PERFORMANCE AND POWER CONSUMPTION OF FUTURE SPACE-SYSTEM MEMORY BY ADAPTING AND HARDENING ADVANCED STATE-OF-ART TECHNOLOGIES.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeDCMA MID-ATLANTIC
NAICS541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
PSCAC22 — NATIONAL DEFENSE R&D SERVICES; ATOMIC ENERGY DEFENSE ACTIVITIES; APPLIED RESEARCH
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$21.5M
Current contract value$21.6M
Potential contract value / ceiling$21.6M
Start dateJun 18, 2019
Current end dateMar 3, 2026
Potential end dateMar 3, 2029
Latest award activityApr 21, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 25 of 25 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 21, 2026A00001$-51.6KRESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY). MOD ISSUED TO DEOBLIGATE FUNDS.
Mar 13, 2026P00023$0STOP WORK EXTENSION
Feb 20, 2025P00022$0NO COST EXTENSION (NCE) - SET ADVANCED MEMORY FOR SPACE APPLICATIONS PROGRAM
Jun 3, 2024P00021$0SPACE ELECTRONIC TECHNOLOGY (SET)
Mar 15, 2024P00020$0SPACE ELECTRONIC TECHNOLOGY (SET) NO COST EXTENSION (NCE)
Jan 29, 2024P00019$4.7MINCREMENTAL FUNDING- SPACE ELECTRONIC TECHNOLOGY (SET) PROGRAM
Mar 6, 2023P00018$1.0MSPACE ELECTRONIC TECHNOLOGY (SET) PROGRAM
Feb 15, 2023P00017$0SPACE ELECTRONIC TECHNOLOGY (SET) PRGM -- NO COST EXTENSION (NCE) - INCORPORATE REVISED SOW AT NO CHANGE IN CPFF VALUE AND OVERALL TERMS AND CONDITIONS, AND EXTEND THE POP
Mar 21, 2022P00016$260.0KTHIS REQUIREMENT IS TO PERFORM RESEARCH AND DEVELOPMENT TO IMPROVE THE DENSITY, PERFORMANCE AND POWER CONSUMPTION OF FUTURE SPACE-SYSTEM MEMORY BY ADAPTING AND HARDENING ADVANCED STATE-OF-ART TECHNOLOGIES. INCREMENTAL FUNDING
Jan 30, 2022P00015$2.5MTHIS REQUIREMENT IS TO PERFORM RESEARCH AND DEVELOPMENT TO IMPROVE THE DENSITY, PERFORMANCE AND POWER CONSUMPTION OF FUTURE SPACE-SYSTEM MEMORY BY ADAPTING AND HARDENING ADVANCED STATE-OF-ART TECHNOLOGIES.
Nov 30, 2021P00014$2.5MTHIS REQUIREMENT IS TO PERFORM RESEARCH AND DEVELOPMENT TO IMPROVE THE DENSITY, PERFORMANCE AND POWER CONSUMPTION OF FUTURE SPACE-SYSTEM MEMORY BY ADAPTING AND HARDENING ADVANCE STATE OF THE ART SYSTEMS. EO 14042
Nov 3, 2021P00013$0THIS REQUIREMENT IS TO PERFORM RESEARCH AND DEVELOPMENT TO IMPROVE THE DENSITY, PERFORMANCE AND POWER CONSUMPTION OF FUTURE SPACE-SYSTEM MEMORY BY ADAPTING AND HARDENING ADVANCE STATE-OF-ART TECHNOLOGY. EO 14042
Jul 1, 2021P00012$5.3MTHIS REQUIREMENT IS TO PERFORM RESEARCH AND DEVELOPMENT TO IMPROVE THE DENSITY, PERFORMANCE AND POWER CONSUMPTION OF FUTURE SPACE-SYSTEM MEMORY BY ADAPTING AND HARDENING ADVANCE STATE-OF-ART TECHNOLOGY.
Apr 16, 2021P00011$100.0KTHIS REQUIREMENT IS TO PERFORM RESEARCH AND DEVELOPMENT TO IMPROVE THE DENSITY, PERFORMANCE AND POWER CONSUMPTION OF FUTURE SPACE-SYSTEM MEMORY BY ADAPTING AND HARDENING ADVANCE STATE-OF-ART TECHNOLOGY.
Apr 1, 2021P00010$200.0KTHIS REQUIREMENT IS TO PERFORM RESEARCH AND DEVELOPMENT TO IMPROVE THE DENSITY, PERFORMANCE AND POWER CONSUMPTION OF FUTURE SPACE-SYSTEM MEMORY BY ADAPTING AND HARDENING ADVANCE STATE-OF-ART TECHNOLOGY.
Mar 9, 2021P00009$464.4KTHIS REQUIREMENT IS TO PERFORM RESEARCH AND DEVELOPMENT TO IMPROVE THE DENSITY, PERFORMANCE AND POWER CONSUMPTION OF FUTURE SPACE-SYSTEM MEMORY BY ADAPTING AND HARDENING ADVANCE STATE-OF-ART TECHNOLOGY.
Jan 27, 2021P00008$250.0KTHIS REQUIREMENT IS TO PERFORM RESEARCH AND DEVELOPMENT TO IMPROVE THE DENSITY, PERFORMANCE AND POWER CONSUMPTION OF FUTURE SPACE-SYSTEM MEMORY BY ADAPTING AND HARDENING ADVANCE STATE-OF-ART TECHNOLOGY.
Nov 18, 2020P00007$200.0KTHIS REQUIREMENT IS TO PERFORM RESEARCH AND DEVELOPMENT TO IMPROVE THE DENSITY, PERFORMANCE AND POWER CONSUMPTION OF FUTURE SPACE-SYSTEMS.
Jun 25, 2020P00006$0THIS REQUIREMENT IS TO PERFORM RESEARCH AND DEVELOPMENT TO IMPROVE THE DENSITY, PERFORMANCE AND POWER CONSUMPTION OF FUTURE SPACE-SYSTEM MEMORY BY ADAPTING AND HARDENING ADVANCE STATE-OF-ART TECHNOLOGY.
May 1, 2020P00005$123.0KTHIS REQUIREMENT IS TO PERFORM RESEARCH AND DEVELOPMENT TO IMPROVE THE DENSITY, PERFORMANCE AND POWER CONSUMPTION OF FUTURE SPACE-SYSTEM MEMORY BY ADAPTING AND HARDENING ADVANCE STATE-OF-ART TECHNOLOGY.
Apr 14, 2020P00004$2.4MTHIS REQUIREMENT IS TO PERFORM RESEARCH AND DEVELOPMENT TO IMPROVE THE DENSITY, PERFORMANCE AND POWER CONSUMPTION OF FUTURE SPACE-SYSTEM MEMORY BY ADAPTING AND HARDENING ADVANCED STATE-OF-ART TECHNOLOGY
Nov 25, 2019P00003$826.8KTHIS REQUIREMENT IS TO PERFORM RESEARCH AND DEVELOPMENT TO IMPROVE THE DENSITY, PERFORMANCE AND POWER CONSUMPTION OF FUTURE SPACE-SYSTEM MEMORY BY ADAPTING AND HARDENING ADVANCED STATE-OF-ART TECHNOLOGY
Oct 7, 2019P00002$-826.8KTHIS REQUIREMENT IS TO PERFORM RESEARCH AND DEVELOPMENT TO IMPROVE THE DENSITY, PERFORMANCE AND POWER CONSUMPTION OF FUTURE SPACE-SYSTEM MEMORY BY ADAPTING AND HARDENING ADVANCED STATE-OF-ART TECHNOLOGIES
Sep 30, 2019P00001$1.3MTHIS REQUIREMENT IS TO PERFORM RESEARCH AND DEVELOPMENT TO IMPROVE THE DENSITY, PERFORMANCE AND POWER CONSUMPTION OF FUTURE SPACE-SYSTEM MEMORY BY ADAPTING AND HARDENING ADVANCED STATE-OF-ART TECHNOLOGIES.
Jun 18, 20190$260.0KTHIS REQUIREMENT IS TO PERFORM RESEARCH AND DEVELOPMENT TO IMPROVE THE DENSITY, PERFORMANCE AND POWER CONSUMPTION OF FUTURE SPACE-SYSTEM MEMORY BY ADAPTING AND HARDENING ADVANCED STATE-OF-ART TECHNOLOGIES.

Estimated positioning window

Mar 3, 2028 – Sep 3, 2028

Recompete signal:
60/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 60/100. Available recorded signals: 55 points.

Contract end 2029-03-03 (853 days from calculation)
+15 points
5 historical awards in this buyer and category group
+15 points
25 recorded award transactions
+10 points
Latest award action: 2026-04-21
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Check the stated set-aside against the solicitation and current certifications.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.