Federal contract award

GS11P08MKC0080

RECOVERY ACT AWARD ARRA FUNDED CODE: TAS::47 4543::TAS 1) CONTRACTOR TO PROVIDE ARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY (DHS) CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC PER THE SCOPE OF WORK DATED 3/19/2010. (FEMA, TSA, ICE, CBP)

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyGeneral Services Administration
OfficePBS R11 CONSTRUCTION SERVICES DIVSION CTR 2
NAICS541310 — Architectural Services
PSCC211 — Architect - Engineer Services (including landscaping, interior layout, and designing)
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$123.9M
Current contract value$123.9M
Potential contract value / ceiling$123.9M
Start dateMar 30, 2010
Current end dateJan 1, 2028
Potential end dateAug 18, 2028
Latest award activityAug 27, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 176 of 176 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 27, 2026PSI7$86.6KADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC.
Jun 17, 2026PCI5$3.4MADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC.
Jun 2, 2026PSI4$299.6KADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC.
Apr 20, 2026PSI3$279.6KADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC.
Mar 10, 2026PSI2$55.2KADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC.
Feb 25, 2026PSI1$89.1KADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC.
Feb 4, 2026PCH9$3.0MADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC.
Jan 6, 2026PSH8$381.0KADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC.
Nov 21, 2025PCH7$1.3MADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC.
Nov 18, 2025PCH6$2.1MADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC.
Oct 31, 2025PCH5$700.0KADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC.
Aug 7, 2025PCH4$1.3MADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC.
Jul 30, 2025PSH3$129.1KPOP EXTENSION OF 26 WEEKS
Jul 2, 2025PCH2$300.0KTASK 28 ICE HQ IRA ANALYSIS 300000
Jun 30, 2025PSH1$189.2KMODIFICATION REQUEST IS INTENDED TO EXTEND POP AND ADDITIONAL SITE SCOPE RESULTING FROM THE NEW GATE ENTRY CONFIGURATION REQUESTED BY DHS.
May 15, 2025PAG9$0REPLACE BA51 FUNDS WITH IRA FUNDS FOR THE GATE 6 GARAGE DESIGN, AWARDED IN PSG6.
Apr 29, 2025PSG8$1.0MPROVIDE PROFESSIONAL SERVICES FOR TASK 15, RELATED TO THE CISA PROJECT IMPACT EXTENSION 2
Apr 15, 2025PAG7$0UPDATE FIXED ASSETS
Apr 2, 2025PSG6$3.5MGATE 6 PKG GARAGE DESIGN TASKS 1 AND 2 PREPARE DESIGN FOR NEW 1100 CAR PKG GARAGE, PRODUCTION OF BRIDGING DOCUMENTS, SITE SURVEY. TASK 3 TRANS IMPACT STUDY TO MEET DDOT AND NCPC REQS, REGL STUDY TO MATCH SCOPE OF 2020 STUDY WITH 44 INTERSECTIONS.
Apr 1, 2025PSG5$0IMPLEMENTATION OF CDS AND DRONES CLAUSE
Mar 25, 2025PSG4$13.7KCONTRACTOR SHALL PROVIDE DESIGN SERVICES TO ADD 4 CURB CUTS TO THE PROJECT DRAWINGS TO SATISFY GSA CAMPUS ABAAS REQUIREMENTS.
Feb 20, 2025PSG3$59.9KPROVIDE ARCHITECT-ENGINEER DESIGN SERVICES FOR A PRELIMINARY TRANSPORTATION ASSESSMENT FOR THE GATE 6 ADDITIONAL PARKING GARAGE
Dec 5, 2024PSG2$8.8KADDITIONAL SERVICES FOR THE DOEE PERMIT PLAN REIVEW AND APPROVAL PROCESS FOR THE RESILIENCE PLAZA PROJECT AND PRESENTATION PRINTING SERVICES
Nov 19, 2024PAG1$0UPDATE ACCOUNTING LINES TO INCLUDE RWA FUNDS. 2,051,812 OF BA51 FUNDS WILL BE REPLACED WITH RWA 5016691 FUNDS, REDUCING THE AMOUNT OF BA51 FUNDS FROM 6,217,613 TO 4,165,801.
Nov 14, 2024PSF9$1.9MPROVIDE PROFESIONAL SERVICES FOR CISA POR REVISIONS TASK 8, CISA GATE 4 PARKING GARAGE ACCESS, ICE HQ REVISIONS INA IN HQ
Oct 25, 2024PSF8$714.1KCONTRACTOR SHALL DEVELOP A CONCEPT LEVEL STUDY ALTER PARKING SOLUTIONS FOR THE ST. ELIZABETHS WEST CAMPUS. CONTRACTOR SHALL PERFORM ADDITIONAL GEOTECHNICAL SOIL BORINGS AT GATE 6, TO SUPPORT THE DESIGN EFFORT FOR THE GARAGE STUDIES.
Oct 24, 2024PCF7$4.0MCONTRACTOR SHALL PROVIDE CONSTRUCTION ADMINISTRATION,CONSTRUCTION PHASE SERVICES IN SUPPORT OF CISA HQ CONSTRUCTION PHASE SERVICES ASSOCIATED WITH CISA HQ CONSTRUCTION AND OVERALL SITE DEVELOPMENT EFFORTS.
Oct 17, 2024PSF6$6.2MTASK 4/BRIDGING DOCUMENTS. CONTRACTOR SHALL DEVELOP THE CORE AND SHELL OF THE NEW ICE BUILDING TO A MINIMUM 75 PERCENT DESIGN DEVELOPMENT LEVEL OF COMPLETION FOR CIVIL, ARCHITECTURE, AND STRUCTURE.
Jul 30, 2024PSF5$650.0KPROVIDE PROFESSIONAL DESIGN SERVICES OF THE GATE 6 WAREHOUSE, SPECIFICALLY TASKS 1/PROJECT INITIATION AND TASK 2/PROGRAMMING (3 MONTHS)
Jul 1, 2024PAF4$-796.8KDEOBLIGATION OF BA51 FUNDS IN EXCESS OF CONTRACT VALUE FOR CONTRACT CONVERSION IN EASI
Jun 26, 2024PAF3$0ADD BLDG NUMBER TO ACCTG STRING
Jun 11, 2024PSF2$156.3KPROVIDE PROFESSIONAL A/E SERVICES TO EXPAND THE POR FOR THE I&A PROJECT TO ORGANIZE THEIR PROGRAM WITHIN THE ICE HQ BUILDING
May 23, 2024PSF1$69.3KPROVIDE DOC 2D CONSTRUCTION ADMINISTRATION SERVICES FOR AN ADDITIONAL THREE MONTHS
Apr 22, 2024PSE9$839.6KCISA HQ BIDDER NEGOTIATION SUPPORT PROPOSAL TASK 25 CISA HQ STANDALONE ELECTRIFICATION PROPOSAL TASK 24 CISA HQ CUP2 ELECTRIFICATION (PHASE 2) ANALYSIS PROPOSAL TASK 23
Mar 28, 2024PSE8$71.8KPROVIDE A DHS ICE HQ FEASIBILITY STUDY TO INCLUDE I-A AS TENANT
Feb 26, 2024PAE7$0CORRECT THE CLIN 0099 MOD SOW PERIOD OF PERFORMANCE COMPLETION DATE FROM 02/09/2024 TO 04/25/2024.
Feb 21, 2024PSE6$163.7KICE HQ TENANT FIT-OUT DOCUMENT, GATE 1 GARAGE HISTORIC PRESERVATION SERVICES, HISTORIC PRESERVATION SERVICES ICE HQ, DOC 2D COLD-FORMED METAL FRAMING TESTING, NO COST EXTENSION OF THE PERIOD OF PERFORMANCE UNDER CLIN 0053
Dec 22, 2023PSE5$211.8KCONTRACTOR SHALL PROVIDE PROFESSIONAL SERVICES TO INCLUDE CISA HQ BID SERVICES TASK 18B, CISA HQ - IRA COMPLIANCE ANALYSIS TASK 21, CISA HQ - CUP2 ELECTRIFICATION ANALYSIS TASK 22
Oct 27, 2023PSE4$52.3KCONTRACTOR SHALL PROVIDE EXISTING UTILITY LOCATING SERVICES TO SUPPORT THE RESILIENCE PLAZA PROJECT. THE EXISTING STEAM TUNNEL WILL BE SURVEYED TO LOCATE AND DOCUMENT THE EXISTING TOP OF THE TUNNEL AND SLOPE ACROSS THE RESILIENCE PLAZA SITE.
Sep 28, 2023PSE3$0174 NO COST CALENDAR DAY EXTENSION (6 MONTHS)
Sep 21, 2023PSE2$485.4KPROVIDE PROFESSIONAL SERVICES FOR TH EST. ELIZABETHS RESILIENCE PLAZA TASKS 3, 4 AND 5 AND GEOTECHNICAL ENGINEERING REPORT TASK 7
Aug 29, 2023PSE1$292.2KADD ODCS ICE DIRECT EXPENSES
Aug 7, 2023PSD9$13.3MPROVIDE PROFESSIONAL DESIGN SERVICES FOR THE POR, SURVEY, CONCEPTS DESIGN FOR THE ICE HQ AND FOR THE PARKING GARAGE 1 BRIDGING DESIGN UNDER THE DHS CONSOLIDATION ON THE ST ELIZABETHS WEST CAMPUS
Jun 13, 2023PCD8$175.0KPDL/NTE TASK 3, RESILIENCE PLAZA. CONTRACTOR SHALL BEGIN TASK 3 - TO PREPARE A COST EST AND DEVELOP CONSTRUCTION DWGS AND SPEC FOR GARDEN SITE AND DISPLAY RESILIENCE PLAZA ST E WEST CAMPUS. SOW GARDEN SITE 05302023, CLIN COMPLETION: 08.31.23
May 15, 2023PSD7$170.2KREVIEW BIDDER RFIS PROVIDE RESPONSES, EVALUATE VIABILITY OF SUBSTITUTION REQUESTS, PREPARE ADDENDUM TO ADDRESS SUBSTITUTIONS OR CHANGES, ASSIST WITH PREBID CONFERENCES OR PREAWARD CONFERENCES, IF REQD, CONDUCT 2 SITE VISITS FOR PROSPECTIVE BIDDERS.
Apr 19, 2023PSD6$0POP EXTENSION FOR PROGRAM OF REQUIREMENTS - DHS OFFICE OF INTELLIGENCE AND ANALYSIS
Feb 28, 2023PSD5$34.1KCONTRACTOR TO PROVIDE ADDITIONAL SERVICES, DOCUMENT CHANGES AND RELATED WORK IN RESPONSE TO PROJECT UPDATES AND REQUESTS THAT IMPACT THE DOC 2D ISSUE FOR CONSTRUCTION DOCUMENT SET DATED 4.27.22.
Feb 7, 2023PSD4$23.7KEXTEND TASK 17 EFFORTS OF ARCHL DESIGN/DETAILING REVIEW, DOC COORDINATION, AND ADMIN-RELATED TASKS FOR WATER LEAK DIAGNOSIS AND EVAL AT ADDL AREA: CTYD FOUNTAIN, MOAT, AND ABANDONED DRAIN BODY. ADDL TESTING, ETC.
Jan 18, 2023PSD2$0POP EXTENSION TO ALLOW THE GOVERNMENT TO PROVIDE COMMENTS ON DELIVERABLES.
Oct 6, 2022PAD1$0CORRECT ORG CODE ON ACCTG STRING FROM P1140001 TO P11J0001
Sep 26, 2022PSC9$242.2KDEVELOP MICRO POR BASED ON REV'D SOW/DHS OFF OF INTELLIGENCE AND ANALYSIS. 1/EXISTING FACILITIES SURVEY, DOCUMENTATION 2/DHS I&S INTERVIEWS, VISIONING SESSIONS, SURVEYS, INVENTORY 3/POR DEV, DOCUMENTATION, REFINEMENT AND 4/PERFORMANCE MATRIX DEV.
Aug 22, 2022PSC8$95.1KCONTRACTOR SHALL PROVIDE COORDINATION, ARCH DESIGN, CONSTR DOC PRODUCTION, AND CONSTR ADMIN SVCS, RELATED TO CWMD'S NBIC SPACE AT LL8 TO CREATE GLASS-WALLED ENCLOSURE AT CURRENT WATCH WALL DISPLAY AREA, TO SEPARATE FROM ADJACENT WORKSTATIONS.
Aug 2, 2022PSC7$120.4KCONTRACTOR SHALL PROVIDE FIELD OBSERVATIONS, ARCHITECTURAL DETAILING, AND DOCUMENT COORDINATION RESULTING FROM ON-SITE FIELD TESTING FOR WATER INTRUSION AT THE MUNRO LL7 STAIR #8 VESTIBULE AND THE LL1 COURTYARD FOUNDATION DRAIN.
Jul 25, 2022PSC6$117.6KPROVIDE PROFESSIONAL SERVICES FOR CLIN 0076 3D LASER SCANNING, CLIN 0077 TEMPORARY PARKING NEAR CISA HQ TASK 20
Jun 27, 2022PAC5$0CORRECT RWA FUNDING
Jun 7, 2022PSC4$95.2KCONTINUED CONSTRUCTION ADMINISTRATION (CA) SERVICES FOR THE G801 SECURITY PROJECT, FOR THE CONSTRUCTION OF THE LL7 PRIVATE OFFICES IN THE MUNRO BUILDING AND FOR SMOKESTACK NO. 2 UNANTICIPATED SURVEY TASK
Mar 22, 2022PSC3$0POP EXTENSION
Feb 16, 2022PSC2$191.8KPROVIDE PROFESSIONAL SERVICES FOR ADDITIONAL DESIGN WORK TO CORRECT DEFICIENCIES ON THE SMOKE EVACUATION AND STAIR PRESSURIZATION SYSTEMS IN THE DOC
Dec 28, 2021PSC1$30.6KREMEDIAL SERVICES FOR DOC A 2B, CA PHASE SCHEDULE ADJUSTMENT/LABOR RATE INCREASE - DOC A PHASE 2D
Nov 23, 2021PSB8$0EO14042 ENSURING ADEQUATE COVID SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS
Nov 23, 2021PSB9$161.1KCONTRACTOR SHALL PROVIDE CONSTRUCTION PHASE SERVICES ASSOCIATED WITH CONTRACT ADMINISTRATION FOR THE EARLY SITE PACKAGE ISSUED IN MAY 2021.
Sep 28, 2021PSB7$311.8KPROVIDE PROFESSIONAL SERVICES FOR TASK 12, 13, 14, AND 15, RELATED TO THE MUNRO REPROGRAMMING DESIGN WORK
Jul 2, 2021PSB6$48.2KADDITIONAL WORK TO INCORPORATE THE GDIT PROGRAM UPDATE INTO THE 90% CD PACKAGE FOR THE DOC 2D,
May 3, 2021PSB5$61.9KTASK 11, MECHANICAL ENGINEERING CHANGES REQUIRED FOR THE MUNRO OPTIMIZATION WORK
Apr 12, 2021PSB4$158.5KPROVIDE ANALYSIS OF SMOKESTACK CONSTRUCTION DOCUMENTATION, REVIEW OF RENOVATION OR PREVIOUS STABILIZATION DOCUMENTATION, ETC. TO PROVIDE RECOMMENDATIONS FOR IMMEDIATE REPAIRS NEEDED TO MAINTAIN OR IMPROVE STRUCTURAL INTEGRITY OF THE SMOKESTACKS.
Mar 8, 2021PSB3$181.7KTASK 11 - INTERIM LEVEL 5 FENCE TASK 13 - FOOD SERVICE CONSULTATION
Feb 1, 2021PSB2$30.1KPROVIDE ADDITIONAL AE SERVICES FOR CENTER BUILDING G801 SECURITY UPGRADES
Jan 21, 2021PSB1$342.1KADDITIONAL SMOKESTACK DESIGN AND SINGLE CUBE MODIFICATION RE-DESIGN
Oct 28, 2020PSA9$449.3KCONTRACTOR SHALL PROVIDE A ED PROGRAM OF REQUIREMENTS, TOGETHER WITH COST ESTIMATES AND DESIGN INTENT DOCUMENTS FOR THE GARDEN SITE AND DISPLAY TO BE DEVELOPED WITHIN THE ST. ELIZABETHS WEST CAMPUS.
Sep 14, 2020PSA8$127.9KPROVIDE CONSTRUCTION OPERATIONS BUILDING INFORMATION EXCHANGE(COBIE) SERVICES TO THE CURRENT DESIGN AND CONSTRUCTION ADMINISTRATION WORK ON DOC A - PHASE 2D
Jun 24, 2020PSA7$5.1MTASK 2 BUILDING 56.57 STABILIZATION TASK 3 HISTORIC SMOKESTACKS STABILIZATION TASK 4 PLATEAU SITEWORK STABILIZATION AND TASK 5 CISA HQ PLAZA.
Jun 3, 2020PSA6$313.4KMUNRO OPTIMIZATION - DID 2, CD AND CA PHASES AND LIMITED SURVEY CONTRACTOR SHALL CONTINUE DESIGN SERVICES, AS WELL AS CONSTRUCTION PHASE SERVICES FOR THE OPTIMIZATION OF THE DHS HQ DID 2, CD AND CA PHASES.
Apr 14, 2020PSA5$15.4MPROVIDE PROFESSIONAL AE DESIGN SERVICES FOR THE CISA HEADQUARTER DEVELOPMENT TASK 00 AND TASK 01
Mar 30, 2020PSA3$0IMPLEMENT SECTION 889
Mar 30, 2020PSA4$257.3KAE DESIGN SERVICES FOR THE CENTER BUILDING G 801 UPGRADES
Mar 20, 2020PSA2$932.5KPROVIDE PROFESSIONAL AE DESIGN SERVICES FOR DOC A - PHASE 2D
Jan 23, 2020PSA1$296.3KTASK 5 PHASE 1 DID FOR MUNRO BLDG REPROGRAMMING
Nov 22, 2019PS99$1.2MMASTER PLAN AMENDMENT2 DOCUMENT DEVELOPMENT ETC, MASTER PLAN AMENDMENT2 SUPPLEMENTAL EIS ETC. AND PLATEAU SITE GEOTECHNICAL INVESTIGATIONS
Oct 22, 2019PS98$75.4KPROVIDE PROFESSIONAL SERVICES FOR AN ASSESSMENT AND REMEDIATION PLAN FOR THE BIRCH STREET SINKHOLE, LOCATED ON THE ST. ELIZABETHS WEST CAMPUS
Oct 17, 2019PS97$104.7KTASK 20A EXTENSION OF CA SERVICES FROM APRIL 2019 THROUGH SEPTEMBER 2019 TASK 20B WATER INTRUSION MITIGATION AND ADDITIONAL WATERPROOFING AT STAIR CHARLIE CONNECTOR TUNNEL. TASK 20C STAIR DELTA FIRE SUPPRESSION MODIFICATIONS
Sep 17, 2019PS96$238.1KCONTRACTOR TO PROVIDE DESIGN SERVICES TO SUPPORT DHS IN MUNRO PROGRAM VALIDATION EFFORTS TASK 4
Jul 22, 2019PS95$238.4KPROVIDE MUNRO PROGRAM VALIDATION WHICH IS DESIGN SERVICES TO SUPPORT DHS IN DEPARTMENTAL GROUP PRE POR MEETINGS, PERFORMING A LIMITED INTERIOR EXISTING CONDITIONS SURVEY, AND VALIDATING THE POR ONCE FINALIZED BY DHS.
Apr 22, 2019PS94$49.9KCONTRACT NO. GS-11P-08-MK-C-0080 PROFESSIONAL AE DESIGN SERVICES FOR THE ST ELIZABETHS CONSOLIDATION SE WASH DC MOD PS94 - SMOKESTACK STABILITY REMEDIATION PLAN THE CONTRACTOR'S SIGNATURE IN BLOCK 15B INDICATES HIS AGREEMENT TO PROVIDE ALL LABOR, SUPERVISION, MATERIAL, AND EQUIPMENT FOR THE FOLLOWING CLIN AS AN AGGREGATE ADD TO THE CONTRACT IN THE AMOUNT OF $49,926.00. IN ACCORDANCE WITH FAR 52.243 - CHANGE CLAUSE (FIXED PRICE), YOU ARE HEREBY AUTHORIZED TO PROCEED WITH THE FOLLOWING: (REFER TO INDIVIDUAL CE'S, SCOPE OF WORK). CLIN 0042: SMOKESTACK STABILITY REMEDIATION PLAN ADD: $49,926.00 CONTRACTOR TO PROVIDE A SMOKESTACK STABILITY REMEDIATION PLAN TO OUTLINE REMEDIATION EFFORTS NEEDED FOR THE SMOKESTACKS DUE TO THEIR CURRENT POOR CONDITION AND RECENT REPORTS OF SIGNIFICANT MOVEMENTS. REF ZGF PROPOSAL DATED 01/04/2019 ALL WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALL APPLICABLE CONTRACT REQUIREMENTS, REGULATIONS AND STANDARDS. SETTLEMENT OF THIS CHANGE INCLUDES ALL ASSOCIATED COSTS, DIRECT AND INDIRECT, IMPACT AND DELAY. ALL TERMS AND CONDITIONS REMAIN IN FULL FORCE AND EFFECT.
Mar 28, 2019PS93$280.5KCONTRACT NO. GS-11P-08-MK-C-0080 PROFESSIONAL AE DESIGN SERVICES FOR THE ST ELIZABETHS CONSOLIDATION SE WASH DC MOD PS93 - SUPPLEMENTAL ENVIRONMENTAL IMPACT PROCESS - TASK 14 AND 15 THE CONTRACTOR'S SIGNATURE IN BLOCK 15B INDICATES HIS AGREEMENT TO PROVIDE ALL LABOR, SUPERVISION, MATERIAL, AND EQUIPMENT FOR THE FOLLOWING CLIN AS AN AGGREGATE ADD TO THE CONTRACT IN THE AMOUNT OF $280,503.00. IN ACCORDANCE WITH FAR 52.243 - CHANGE CLAUSE (FIXED PRICE), YOU ARE HEREBY AUTHORIZED TO PROCEED WITH THE FOLLOWING: (REFER TO INDIVIDUAL CE'S, SCOPE OF WORK). CLIN 0041: SUPPLEMENTAL ENVIRONMENTAL IMPACT PROCESS - TASK 14 AND 15 ADD: $280,503.00 CONTRACTOR TO PROVIDE FOR THE DEVELOPMENT OF THE DHS HQ CONSOLIDATION AT ST. ELIZABETHS MASTER PLAN AMENDMENT #2 SUPPLEMENTAL EIS PROCESS. THIS WORK WILL BE BASED ON THE PRELIMINARY CONSENSUS CONCEPT DEFINED WITH THE CONSULTING PARTIES IN LATE NOVEMBER 2018, AND DEVELOPED AS PART OF THE MASTER PLAN AMENDMENT 2 DOCUMENT. THE SOW INCLUDES ADDENDUMS TO TWO TASKS OF THE 2018 MASTER PLAN AMENDMENT EFFORTS: TASK 14 AND 15. REFERENCE: PROPOSAL DATED ON FEBRUARY 13, 2019. ALL WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALL APPLICABLE CONTRACT REQUIREMENTS, REGULATIONS AND STANDARDS. SETTLEMENT OF THIS CHANGE INCLUDES ALL ASSOCIATED COSTS, DIRECT AND INDIRECT, IMPACT AND DELAY. ALL TERMS AND CONDITIONS REMAIN IN FULL FORCE AND EFFECT.
Jan 7, 2019PS92$89.8KCONTRACT NO. GS-11P-08-MK-C-0080 PROFESSIONAL AE DESIGN SERVICES MOD PS92- ADDITIONAL DESIGN AND DOCUMENTATION SERVICES THE CONTRACTOR'S SIGNATURE IN BLOCK 15B INDICATES HIS AGREEMENT TO PROVIDE PROFESSIONAL AE DESIGN SERVICES FOR THE FOLLOWING CLIN'S AS AN AGGREGATE ADD TO THE CONTRACT IN THE AMOUNT OF $89,831.00. IN ACCORDANCE WITH FAR 52.243 - CHANGE CLAUSE (FIXED PRICE), YOU ARE HEREBY AUTHORIZED TO PROCEED WITH THE FOLLOWING: (REFER TO INDIVIDUAL CE'S, SCOPE OF WORK). CLIN 0039: ADD'L CONSTRUCTION ADMINISTRATION SERVICES - DOC ADD: $75,049.00 CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT TO INCORPORATE TENANT'S REQUESTED DESIGN CHANGES, WHICH WERE ISSUED AFTER CONTRACT AWARD. THE DESIGN CHANGES INCLUDE: ADJUSTING ELECTRICAL PATHWAYS; CHANGES TO RECEIVE AND OPERATE THE TURNSTILES; AND SECURITY FEATURES ADDED TO EACH TRAILER. THE INTERIOR DOORS ARE TO BE CHANGED TO STAINLESS STEEL AND ALL INTERIOR WINDOWS ARE TO BE REMOVED. ADDITIONALLY, DEDICATED CIRCUITS ARE TO BE INSTALLED IN CONDUIT FOR RADIATION DETECTORS AND FOR DISTRESSED PANIC BUTTONS. ALL THIS WORK IS TO BE COMPLETED IN ACCORDANCE WITH THE MANUFACTURE RECOMMENDATIONS. REFERENCE: PROPOSAL DATED ON NOVEMBER 30, 2018 CLIN 0040: GATE 3- O&A MODIFICATIONS CONSTRUCTION REQUIREMENTS FOR DOC PHASE 2A ADD: $14,782.00 CONTRACTOR SHALL PROVIDE ADDITIONAL SERVICES NEEDED TO INCORPORATE THE CHANGES REQUESTED FOR THE DOC - I&A MODIFICATIONS CONSTRUCTION REQUIREMENTS INTO THE PHASE 2A CONSTRUCTION DOCUMENTS AND WILL ISSUE A BULLETIN TO THE CONSTRUCTION CONTRACTOR COVERING THE SCOPE OF THE CHANGES. REFERENCE: PROPOSAL DATED ON DECEMBER 20, 2018 ALL WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALL APPLICABLE CONTRACT REQUIREMENTS, REGULATIONS AND STANDARDS. SETTLEMENT OF THIS CHANGE INCLUDES ALL ASSOCIATED COSTS, DIRECT AND INDIRECT, IMPACT AND DELAY. ALL TERMS AND CONDITIONS REMAIN IN FULL FORCE AND EFFECT.
Sep 25, 2018PC91$-6.5MCONTRACT GS-11P-08-MK-C-0080, PROFESSIONAL AE DESIGN SERVICES FOR ST ELIZABETHS WEST CAMPUS CONSOLIDATION PROGRAM (PHASE 3) MOD PC91 DEOBLIGATION OF $6,521,237.00 (PHASE 3) EFFECTIVE WITH THE ISSUANCE OF THIS MODIFICATION, GSA IS HEREBY DEOBLIGATING FUNDS IN THE AMOUNT OF $6,521,237.00 AS EXECUTED UNDER MOD PS63, CLIN 0006 CORRESPONDING TO DESIGN SERVICES FOR NEW CONSTRUCTION BUILDINGS ON THE PLATEAU ON ST ELIZABETHS WEST CAMPUS, SE, WASH., DC. REFERENCE JUSTIFCATION: DEOBLIGATION NOTIFICATION AND AGREEMENT, DATED 09/14/18, SIGNED BY GSA AND ZGF ON 09/17/2018. THIS MOD HAS NO EFFECT ON COMPLETION DATE. ALL WORK, AND REMAINING WORK, IS TO BE ACCOMPLISHED IN ACCORDANCE WITH ALL APPLICABLE STANDARDS, REQUIREMENTS AND REGULATIONS. ALL TERMS AND CONDITIONS REMAIN IN FULL FORCE AND EFFECT.
Sep 17, 2018PS90$529.0KCONTRACT NUMBER- GS-11P-08-MK-C-0080 MOD PS90: AE DESIGN SERVICE - TENANT FIT-OUT CONSTRUCTION DOC A PHASE 2C THE CONTRACTOR'S SIGNATURE IN BLOCK 15B INDICATES HIS AGREEMENT TO PROVIDE AE DESIGN SERVICES FOR THE FOLLOWING CLIN AS AN AGGREGATE ADD TO THE CONTRACT IN THE AMOUNT OF $528,957.00 ALL WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALL APPLICABLE CONTRACT REQUIREMENTS, REGULATIONS AND STANDARDS. IN ACCORDANCE WITH FAR 52.243 - CHANGE CLAUSE (FIXED PRICE), YOU ARE HEREBY AUTHORIZED TO PROCEED WITH THE FOLLOWING: (REFER TO INDIVIDUAL CES, SCOPE OF WORK). CLIN 0038 : ADD: $528,957.00 AE TO PROVIDE DESIGN SERVICES FOR THE TENANT BUILD-OUT OF PHASE 2C OF THE DOC A FIT OUT, INCLUDING: CONFIRMING THE PROGRAM OF REQUIREMENTS, PROVIDING COST ESTIMATES, DEVELOPING DIDS, CONSTRUCTION DRAWINGS AND SPECIFICATIONS. REF. ZGF PROPOSAL DATED (05/10/2018) ALL WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALL APPLICABLE CONTRACT REQUIREMENTS, REGULATIONS AND STANDARDS. SETTLEMENT OF THIS CHANGE INCLUDES ALL ASSOCIATED COSTS, DIRECT AND INDIRECT, IMPACT AND DELAY. ALL TERMS AND CONDITIONS REMAIN IN FULL FORCE AND EFFECT.
Jul 24, 2018PS89$70.6KANTENNA PATHWAY AND CA PHASE EXTENSION
Jun 19, 2018PS88$534.0KMASTER PLAN STUDY 2018
Apr 10, 2018PS87$24.3KEXTEND BID PHASE SERVICES
Jan 18, 2018PS85$-1.1MNEW DESIGN SERVICES AE FOR PHASE 2 AND 3, CREDITS AND ADDS.
Oct 30, 2017PS84$119.2KTASK 3.2, TASK 4.1 AND 4.2 22 WEEK CONSTRUCTION ADMINISTRATION EXTENSION
Sep 22, 2017PS83$123.4KFINALIZE THE RIGHT OF WAY TRANSFER AND THE PREPARATION OF THE TRANSFER OF JURISDICTION (TOJ) FOR THE EXISTING ACCESS ROAD, RELATED TO THE I295 /MALCOLM X INTERCHANGE
Aug 1, 2017PS82$600.8KMOD PS82 TENANT SUITE COST ESTIMATE CONTRACTOR TO PROVIDE A COST ESTIMATE FOR THE DOC PHASE 2B, BROKEN OUT BY TENANT SUITE AND OTHER COMPONENTS OF THE BUILD-OUT FOR THE PURPOSES OF SUPPORTING GSA AND DHS PROJECT PLANNING. AND BIDDING AND CONSTRUCTION CONTRACTOR TO PROVIDE BIDDING/NEGOTIATION AND CONSTRUCTION ADMINISTRATION SERVICES FOR BUILD-OUT IN DOC BLOCK A, INCLUDING THE NATIONAL OPERATIONS CENTER, THE INTELLIGENCE WATCH /WARNINGS AND THE OPS COMPONENT.
Jun 20, 2017PS81$13.8KPROFESSIONAL AE DESIGN SERVICES ADDITIONAL SCOPE REQUESTS: EOC/NOC BREAK ROOM MODIFICATIONS.
May 15, 2017PS80$95.5KEXTENSION OF PROJECT MANAGEMENT SERVICES FOR SOUTH CAPITOL STREET INTERCHANGE, TASK 17, INCLUDING THE DCRA FINAL PERMIT WORK
Apr 18, 2017PS79$246.1KSITE LIGHTING DESIGN, ELEVATOR SUBSTITUTION SUBMITTAL REVIEW, EXTENDED CONSTRUCTION ADMINISTRATION SCHEDULE , ADDITIONAL SERVICES
Apr 7, 2017PS78$31.1KENVIRONMENTAL PERMITTING APPROVAL
Mar 13, 2017PS77$343.1KMUNRO OPTIMIZATION, DD THROUGH CA
Mar 2, 2017PS76$289.7KUPDATES TO THE STRUCTURAL DESIGN ON SEVERAL BRIDGES AT THE REQUEST OF DDOT DURING THE 100% DESIGN SUBMITTAL AND TO INCLUDE ADDITIONAL DESIGN TASKS EVOLVING FROM THE DHS REQUEST TO MAKE THE EXISTING ACCESS ROADWAY AND INTERCHANGE CONNECTIONS TO THE ST. ELIZABETHS CAMPUS PRIVATE .
Feb 14, 2017PS75$261.5KDDOT REVIEW TASK 14
Jan 30, 2017PS86$109.2KADDITIONAL SERVICES FOR THE EXTENSION OF DOC A PHASE 2A (LL2&3)
Jan 27, 2017PS74$71.3KADDITIONAL PROFESSIONAL SERVICES FOR DESIGN, CA SERVICES FOR NOC ANTENNA EQUIPMENT ROOM TASK 9
Dec 6, 2016PC73$-57.2KDEOB FUNDS IN EXCESS OF CLIN 0016 VALUE UNDER MOD PS50 FOR BLDG REDESIGN DUE TO BALLSTON MOVE
Oct 31, 2016PS72$576.3KPROFESSIONAL SERVICES FOR A FINAL DESIGN TASK 13 TO COMPLETE 100% DESIGN
Sep 1, 2016PA71$171.1KDE-SCOPING FOR ADD'L SVCS TO INCLUDE SURVEY, BIM MODELING, DRAWINGS, AND SPECIFICATIONS FOR: LOWER LEVEL 2 BREAK ROOM.-- NEW ENTRANCE VESTIBULE AT FUTURE CONNECTION TO WEST ADDITION.--MAINTENANCE CATWALK (INCLUDING ACCESS AND ANY REQUIRED MEP RE-ROUTING, AND SAFETY LIGHTING) TO SERVE GDIT PULLBOX IN LL2 SHELL SPACE.--RESOLUTION OF PRE-EXISTING AC DEFICIENCY IN UPS ROOM.
Aug 17, 2016PA70$-171.1KDE-SCOPED ITEMS: PORS, DIDS, CDS FOR VARIOUS TENANTS
Aug 17, 2016PS69$1.7MASK 4 AND TASK 5 / MUNRO OPTIMIZATION
Aug 1, 2016PA68$1.5MREOBLIGATION OF FUNDS UNDER PROJECT NDC00256
Jul 20, 2016AA67$-1.5MDEOBLIGATION OF NDC00254 FUNDS FROM CLIN 0009. REOBLIGATION TO BE UNDER NDC00256
Jun 27, 2016PS66$1.5MPROVIDE UTILITY DESIGN SERVICES FOR PHASE 2 AND 3 AT THE ST ELIZABETHS WEST CAMPUS; AS BUILT DOCUMENTATION FOR PHASE 1 UTILITY DESIGN
Jun 16, 2016PS65$113.3KI-295 MALCOLM X INTERCHANGE PROJECT - 60 INCH STORM DRAIN INVESTIGATION, WASHINGTON, DC; ADDITIONAL SERVICES RELATED TO FINANCIAL PLAN ( FHWA REQUIREMENTS)
May 26, 2016PS63$10.1MADDITIONAL SERVICES-GEOTECHNICAL INVESTIGATING AND TESTING ADDITIONAL GEOTECHNICAL ENGINEERING - DRILLING, TESTING, EVALUATION, SOIL CORROSION TESTING DESIGN SERVICES; MASTER PLAN AMENDMENT #2; REVISIONS TO PRELIMINARY CONCEPTS, POR'S, FEMA TO BRIDGING DOCUMENTS AND FINAL CONCEPTS FOR ICE AND CBP
Mar 24, 2016PS62$148.2KSTREAM RESTORATION PERMITTING AND POST ADVERTISEMENT SERVICES
Feb 23, 2016PS61$1.2MARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC; I295/MX ST. FINAL DESIGN
Jan 14, 2016PS59$1.8MARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC / ADDITIONAL DESIGN SERVICES
Jan 12, 2016PS60$7.5MARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC; I295/MX ST. FINAL DESIGN
Oct 13, 2015PS57$288.2KA-E DESIGN SERVICES FRO ST ELIZABETHS WEST CAMPUS, SE, WASH., DC: DESIGN SERVICES - I295/MX ST.
Oct 13, 2015PS58$-175.8KARRA FUNDED AE DESIGN SERVICES AT ST ELIZABETHS/DHS CONSOLIDATION, WASH., DC: DEOBLIGATION OF EXCESS ARRA FUNDS
Aug 26, 2015PS54$0ARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC : COMPILATION SURVEY, PACKAGE REISSUE, EXTENSION OF SVCS, HILL STABILIZATION
Aug 26, 2015PS55$0ARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC : ANALYZE BILLING OVERTIME
Aug 26, 2015PS56$0ARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC : ADD'L DESIGN SERVICES
Jul 23, 2015PS53$0ARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC: ELECTRICAL REMODEL
Jul 7, 2015PS51$0ARRA FUNDED AE PROFESSIONAL DESIGN SERVICES FOR ST ELIZABETHS CONSOLIDATION PROGRAM, SE, WASH., DC: STREAM RESTORATION AND STOCKPILE ASSESSMENT
Jul 7, 2015PS52$0ARRA FUNDED ARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC : TOILET FACILITIES EXPANSION
Jun 25, 2015PS50$247.9KPROFESSIONAL A/E DESIGN SERVICES FOR THE ST ELIZABETHS CAMPUS, SE, WASH., DC: BLDG RE-DESIGN DUE TO BALLSTON PERSONNEL RELOCATION
Jun 24, 2015PS49$0ARRA FUNDED: PROFESSIONAL A/E DESIGN SERVICES, ST ELIZABETHS WEST CAMPUS, SE, WASH., DC: STAGE 2 IT, AV AND SECURITY DESIGN SERVICES
Jun 10, 2015PS47$0ARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC
Jun 10, 2015PS48$0ARRA FUNDED: PROFESSIONAL A/E DESIGN SERVICES, ST ELIZABETHS WEST CAMPUS, SE, WASH., DC: CORRECT MATH ERROR; GEOTECHNICAL CONSULTING, CIVIL ENGINEERING, AND STAGE 2 IT, AV AND SECURITY DESIGN SERVICES RELATED TO THE DOC A PHASE 2 PROJECT.
May 20, 2015PS44$0AARRA FUNDED AE PROFESSIONAL DESIGN SERVICES FOR ST ELIZABETHS CONSOLIDATION PROGRAM, SE, WASH., DC: REALLOCATION FOR STORMWATER RETENTION CREDIT CERTIFICATION
May 20, 2015PS45$0ARRA FUNDED AE PROFESSIONAL DESIGN SERVICES FOR ST ELIZABETHS CONSOLIDATION PROGRAM, SE, WASH., DC: ELECTRICAL STUDY OF THE ST. ELIZABETHS WEST CAMPUS
May 20, 2015PS46$0ARRA FUNDED AE PROFESSIONAL DESIGN SERVICES FOR ST ELIZABETHS CONSOLIDATION PROGRAM, SE, WASH., DC: WEST CAMPUS BLOCK AND STACKING STUDY FOR THE ST. ELIZABETHS WEST CAMPUS.
Apr 10, 2015PS42$0AE DESIGN SVCS, ST ELIZABETHS CAMPUS, SE, WASH., DC: OPTIMIZING OFFICE SPACE WITHIN THE DOUGLAS MINOR USCG HQ BUILDING (B50)
Apr 10, 2015PS43$0AE DESIGN SERVICES, ST ELIZABETHS CAMPUS, SE, WASH., DC ; BRING THE CENTRAL UTILITY PLANT (CUP) EXPANSION DESIGN UP TO A DESIGN/BUILD BRIDGING PACKAGE
Apr 6, 2015PS41$0AE DESIGN SVCS, ST ELIZABETHS CAMPUS, SE, WASH., DC: IMPROVEMENTS TO THE ST. ELIZABETH'S CAMPUS ACCESS ROAD AND THE I295/MX INTERCHANGE
Feb 26, 2015PS38$121.9KCONTRACT MODIFICATION FOR ADDITIONAL A/E DESIGN SERVICES AT THE DHS HQ CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC.
Feb 26, 2015PS39$0CONTRACT MODIFICATION FOR ADDITIONAL A/E DESIGN SERVICES USING FUNDS REALLOCATED WITHIN THE CONTRACT.
Feb 26, 2015PS40$0CONTRACT MODIFICATION FOR ADDITIONAL A/E DESIGN SERVICES USING FUNDS REALLOCATED WITHIN THE CONTRACT.
Jan 6, 2015PS36$0CONTRACT MODIFICATION FOR ADDITIONAL A/E DESIGN SERVICES USING FUNDS REALLOCATED WITHIN THE CONTRACT.
Dec 24, 2014PS37$0CONTRACT MODIFICATION FOR ADDITIONAL A/E DESIGN SERVICES USING FUNDS REALLOCATED WITHIN THE CONTRACT.
Dec 17, 2014PS35$0CONTRACT MODIFICATION FOR ADDITIONAL A/E DESIGN SERVICES USING FUNDS REALLOCATED WITHIN THE CONTRACT.
Nov 20, 2014PS34$28.1KCONTRACT MODIFICATION FOR ADDITIONAL A/E DESIGN SERVICES AT THE DHS HQ CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC.
Aug 29, 2014PS33$0CONTRACT MODIFICATION FOR ADDITIONAL SERVICES USING FUNDS REALLOCATED WITHIN THE CONTRACT.
Aug 1, 2014PS32$0CONTRACT MODIFICATION FOR ADDITIONAL SERVICES USING FUNDS REALLOCATED WITHIN THE CONTRACT.
Jul 2, 2014PA31$0ADMINISTRATIVE MODIFICATION TO CORRECT CODES.
Jun 27, 2014PC30$0CONTRACT MODIFICATION FOR ADDITIONAL SERVICES REALLOCATED WITHIN THE CONTRACT.
Jan 24, 2014PC29$-736.2KCONTRACT MODIFICATION FOR DEOBLIGATION OF FUNDS NOT NEEDED IN THE CONTRACT.
Dec 31, 2012PS28$0CONTRACT MODIFICATION FOR ADDITIONAL SERVICES REALLOCATED WITHIN THE CONTRACT.
Dec 18, 2012PC27$-98.1KCONTRACT MODIFICATION TO DEOBLIGATE FUNDS THAT ARE NOT NEEDED.
Aug 17, 2012PS25$-465.0KARRA MODIFICATION TAS::47 4543::TAS THIS MODIFICATION IS TO DEOBLIGATE FUNDS FROM THE CONTRACT.
Aug 17, 2012PS26$-573.5KARRA MODIFICATION TAS::47 4543::TAS THIS MODIFICATION IS TO DEOBLIGATE FUNDS FROM THE CONTRACT.
May 11, 2012PC23$650.7KARRA MODIFICATION TAS::47 4543::TAS CONTRACT MODIFICATION TO CANCEL MOD PS16 (DATED 12/27/2011) AND REOBLIGATE THE FUNDS.
May 11, 2012PC24$390.0KARRA MODIFICATION TAS::47 4543::TAS CONTRACT MODIFICATION TO CANCEL MOD PS18 (DATED 12/27/2011) AND REOBLIGATE THE FUNDS.
Mar 19, 2012PS22$-8.4MARRA RECOVERY ACT TAS::47 4543:: MODIFICATION TO REDUCE OBLIGATED FUNDING FOR A/E DESIGN SERVICES FOR THE DHS CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC.
Jan 3, 2012PS21$-1.6MRECOVERY ACT MODIFICATION TAS::47 4543::TAS IN SUPPORT OF THE ST. ELIZABETHS PROJECT - $1,643,479.70 IS DEOBLIGATED FROM THE BASE CONTRACT FOR PHASE 2B AND OPTION 17 HAS BEEN CREATED FOR THIS PORTION OF WORK BEING DELETED THAT MAY BE EXERCISED AT A LATER DATE.
Dec 27, 2011PS16$-650.7KARRA MODIFICATION TAS::47 4543::TAS CONTRACT MODIFICATION TO DEOBLIGATE FUNDS FROM THIS CONTRACT AND CREATE AN OPTION TO BE EXERCISED AT A LATER DATE.
Dec 27, 2011PS17$-44.2KARRA MODIFICATION TAS::47 4543::TAS CONTRACT MODIFICATION TO DEOBLIGATE FUNDS FROM THIS CONTRACT AND CREATE AN OPTION TO BE EXCERCISED AND FUNDED AT A LATER DATE.
Dec 27, 2011PS18$-390.0KARRA MODIFICATION TAS::47 4543::TAS CONTRACT MODIFICATION TO DEOBLIGATE FUNDS FROM THIS CONTRACT AND CREATE AN OPTION TO BE EXCERCISED AND FUNDED AT A LATER DATE.
Dec 27, 2011PS19$-39.4KARRA MODIFICATION TAS::47 4543::TAS CONTRACT MODIFICATION TO DEOBLIGATE FUNDS FROM THIS CONTRACT AND CREATE AN OPTION TO BE EXCERCISED AND FUNDED AT A LATER DATE.
Dec 27, 2011PS20$-73.8KARRA MODIFICATION TAS::47 4543::TAS CONTRACT MODIFICATION TO DEOBLIGATE FUNDS FROM THIS CONTRACT AND CREATE AN OPTION TO BE EXCERCISED AND FUNDED AT A LATER DATE.
Oct 27, 2011PC15$-48.2KARRA TAS::47 4543::TAS CHANGE ORDER TO DEOBLIGATE DUPLICATED FUNDS AND CORRECT FUNDING CODE ON SF30 ONLY.
Sep 30, 2011PC12$0ARRA RECOVERY ACT MODIFICATION TAS::47 4543:: CONTRACTOR TO PERFORM ADDITIONAL A/E DESIGN SERVICES FOR DHS CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC.
Sep 28, 2011PA11$0ARRA RECOVERY ACT MODIFICATION TAS::47 4543:: ADMINISTRATIVE MODIFICATION TO CORRECT ACCOUNTING LINE.
Sep 28, 2011PS13$-1.9MARRA RECOVERY MODIFICATION TAS::47 4743::TAS DEOBLIGATION OF FUNDS FROM THE CONTRACT.
Sep 28, 2011PS14$-358.3KARRA RECOVERY ACT MODIFICATION TAS::47 4543:: DEOBLIGATION OF FUNDS FROM THE CONTRACT.
Jul 27, 2011PS09$-2.1MARRA RECOVERY ACT MODIFICATION TAS:47 4543::TAS MODIFICATION TO DEOBLIGATE FUNDING FOR A/E DESIGN SERVICES FOR PHASE 3 AND CREATE AN OPTION TO EXERCISE AND FUND AT A LATER DATE.
Jul 27, 2011PS10$-8.1MARRA RECOVERY ACT MODIFICATION TAS:47 4543::TAS MODIFICATION TO DEOBLIGATE FUNDING FOR A/E DESIGN SERVICES FOR PHASE 3 AND CREATE OPTIONS TO EXERCISE AND FUND AT A LATER DATE.
Jul 1, 2011PC07$0ARRA RECOVERY ACT MODIFICATION TAS::47 4543::TAS CONTRACTOR TO PROVIDE ADDITIONAL A/E DESIGN SERVICES FOR PHASE 3A DESIGN SCOPE CHANGES (WEST CAMPUS INFRASTRUCTURE) TO DEVELOP THE CAMPUS-WIDE LANDSCAPE DESIGN VISION FOR THE DHS CAMPUS. THIS WORK WILL BE PERFORMED WITH MONEY ALREADY OBLIGATED FOR THE PROJECT.
Jul 1, 2011PC08$48.2KMODIFICATION FOR ADDITIONAL A/E SERVICES FOR THE DHS CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC
Sep 30, 2010PC05$698.0KARRA RECOVERY ACT MODIFICATION TAS::47 4543::TAS CONTRACTOR TO PROVIDE ADDITIONAL A/E DESIGN SERVICES FOR THE DHS CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS (FEMA, TSA, ICE, CBP) IN WASHINGTON, DC.
Sep 30, 2010PS06$2.7MARRA RECOVERY ACT MODIFICATION TAS::47 4543::TAS CONTRACTOR TO PROVIDE ADDITIONAL A/E DESIGN SERVICES FOR THE DHS CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS (FEMA, TSA, ICE, CBP) IN WASHINGTON, DC.
Mar 31, 2010PA04$0ADMINISTRATIVE MODIFICATION TO CORRECT COST ELEMENT CODE IN THE ACCOUNTING AND APPROPRIATION DATA.
Mar 30, 20100$7.9MRECOVERY ACT AWARD ARRA FUNDED CODE: TAS::47 4543::TAS 1) CONTRACTOR TO PROVIDE ARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY (DHS) CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC PER THE SCOPE OF WORK DATED 3/19/2010. (FEMA, TSA, ICE, CBP)
Mar 30, 2010PA01$2.0MNON-ARRA FUNDED AWARD CONTRACTOR TO PROVIDE ARCHITECT-ENGINEER DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY (DHS) CONSOLIDATION PROJECT (FEMA, TSA, ICE, CBP) PER THE SCOPE OF WORK DATED 3/19/2010.
Mar 30, 2010PA02$22.2MRECOVERY ACT AWARD ARRA FUNDED CODE: TAS::47 4543::TAS 1) CONTRACTOR TO PROVIDE ARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY (DHS) CONSOLIDATION PROJECT (FEMA, TSA, ICE, CBP) AT THE ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC PER THE SCOPE OF WORK DATED 3/19/2010.
Mar 30, 2010PA03$17.7MRECOVERY ACT AWARD ARRA FUNDED CODE: TAS::70 9011::TAS 1) CONTRACTOR TO PROVIDE ARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY (DHS) CONSOLIDATION PROJECT(FEMA, TSA, ICE, CBP) AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC PER THE SCOPE OF WORK DATED 3/19/2010.

Estimated positioning window

Aug 18, 2027 – Feb 18, 2028

Recompete signal:
60/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 60/100. Available recorded signals: 55 points.

Contract end 2028-08-18 (656 days from calculation)
+25 points
7 historical awards in this buyer and category group
+15 points
176 recorded award transactions
+10 points
Latest award action: 2026-08-27
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Check the stated set-aside against the solicitation and current certifications.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.