Federal contract award
GS11P08MKC0080
RECOVERY ACT AWARD ARRA FUNDED CODE: TAS::47 4543::TAS 1) CONTRACTOR TO PROVIDE ARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY (DHS) CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC PER THE SCOPE OF WORK DATED 3/19/2010. (FEMA, TSA, ICE, CBP)
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | General Services Administration |
| Office | PBS R11 CONSTRUCTION SERVICES DIVSION CTR 2 |
| NAICS | 541310 — Architectural Services |
| PSC | C211 — Architect - Engineer Services (including landscaping, interior layout, and designing) |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $123.9M |
| Current contract value | $123.9M |
| Potential contract value / ceiling | $123.9M |
| Start date | Mar 30, 2010 |
| Current end date | Jan 1, 2028 |
| Potential end date | Aug 18, 2028 |
| Latest award activity | Aug 27, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 176 of 176 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 27, 2026 | PSI7 | $86.6K | ADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC. |
| Jun 17, 2026 | PCI5 | $3.4M | ADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC. |
| Jun 2, 2026 | PSI4 | $299.6K | ADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC. |
| Apr 20, 2026 | PSI3 | $279.6K | ADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC. |
| Mar 10, 2026 | PSI2 | $55.2K | ADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC. |
| Feb 25, 2026 | PSI1 | $89.1K | ADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC. |
| Feb 4, 2026 | PCH9 | $3.0M | ADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC. |
| Jan 6, 2026 | PSH8 | $381.0K | ADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC. |
| Nov 21, 2025 | PCH7 | $1.3M | ADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC. |
| Nov 18, 2025 | PCH6 | $2.1M | ADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC. |
| Oct 31, 2025 | PCH5 | $700.0K | ADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC. |
| Aug 7, 2025 | PCH4 | $1.3M | ADDITIONAL PROFESSIONAL ARCHITECT ENGINEERING DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC. |
| Jul 30, 2025 | PSH3 | $129.1K | POP EXTENSION OF 26 WEEKS |
| Jul 2, 2025 | PCH2 | $300.0K | TASK 28 ICE HQ IRA ANALYSIS 300000 |
| Jun 30, 2025 | PSH1 | $189.2K | MODIFICATION REQUEST IS INTENDED TO EXTEND POP AND ADDITIONAL SITE SCOPE RESULTING FROM THE NEW GATE ENTRY CONFIGURATION REQUESTED BY DHS. |
| May 15, 2025 | PAG9 | $0 | REPLACE BA51 FUNDS WITH IRA FUNDS FOR THE GATE 6 GARAGE DESIGN, AWARDED IN PSG6. |
| Apr 29, 2025 | PSG8 | $1.0M | PROVIDE PROFESSIONAL SERVICES FOR TASK 15, RELATED TO THE CISA PROJECT IMPACT EXTENSION 2 |
| Apr 15, 2025 | PAG7 | $0 | UPDATE FIXED ASSETS |
| Apr 2, 2025 | PSG6 | $3.5M | GATE 6 PKG GARAGE DESIGN TASKS 1 AND 2 PREPARE DESIGN FOR NEW 1100 CAR PKG GARAGE, PRODUCTION OF BRIDGING DOCUMENTS, SITE SURVEY. TASK 3 TRANS IMPACT STUDY TO MEET DDOT AND NCPC REQS, REGL STUDY TO MATCH SCOPE OF 2020 STUDY WITH 44 INTERSECTIONS. |
| Apr 1, 2025 | PSG5 | $0 | IMPLEMENTATION OF CDS AND DRONES CLAUSE |
| Mar 25, 2025 | PSG4 | $13.7K | CONTRACTOR SHALL PROVIDE DESIGN SERVICES TO ADD 4 CURB CUTS TO THE PROJECT DRAWINGS TO SATISFY GSA CAMPUS ABAAS REQUIREMENTS. |
| Feb 20, 2025 | PSG3 | $59.9K | PROVIDE ARCHITECT-ENGINEER DESIGN SERVICES FOR A PRELIMINARY TRANSPORTATION ASSESSMENT FOR THE GATE 6 ADDITIONAL PARKING GARAGE |
| Dec 5, 2024 | PSG2 | $8.8K | ADDITIONAL SERVICES FOR THE DOEE PERMIT PLAN REIVEW AND APPROVAL PROCESS FOR THE RESILIENCE PLAZA PROJECT AND PRESENTATION PRINTING SERVICES |
| Nov 19, 2024 | PAG1 | $0 | UPDATE ACCOUNTING LINES TO INCLUDE RWA FUNDS. 2,051,812 OF BA51 FUNDS WILL BE REPLACED WITH RWA 5016691 FUNDS, REDUCING THE AMOUNT OF BA51 FUNDS FROM 6,217,613 TO 4,165,801. |
| Nov 14, 2024 | PSF9 | $1.9M | PROVIDE PROFESIONAL SERVICES FOR CISA POR REVISIONS TASK 8, CISA GATE 4 PARKING GARAGE ACCESS, ICE HQ REVISIONS INA IN HQ |
| Oct 25, 2024 | PSF8 | $714.1K | CONTRACTOR SHALL DEVELOP A CONCEPT LEVEL STUDY ALTER PARKING SOLUTIONS FOR THE ST. ELIZABETHS WEST CAMPUS. CONTRACTOR SHALL PERFORM ADDITIONAL GEOTECHNICAL SOIL BORINGS AT GATE 6, TO SUPPORT THE DESIGN EFFORT FOR THE GARAGE STUDIES. |
| Oct 24, 2024 | PCF7 | $4.0M | CONTRACTOR SHALL PROVIDE CONSTRUCTION ADMINISTRATION,CONSTRUCTION PHASE SERVICES IN SUPPORT OF CISA HQ CONSTRUCTION PHASE SERVICES ASSOCIATED WITH CISA HQ CONSTRUCTION AND OVERALL SITE DEVELOPMENT EFFORTS. |
| Oct 17, 2024 | PSF6 | $6.2M | TASK 4/BRIDGING DOCUMENTS. CONTRACTOR SHALL DEVELOP THE CORE AND SHELL OF THE NEW ICE BUILDING TO A MINIMUM 75 PERCENT DESIGN DEVELOPMENT LEVEL OF COMPLETION FOR CIVIL, ARCHITECTURE, AND STRUCTURE. |
| Jul 30, 2024 | PSF5 | $650.0K | PROVIDE PROFESSIONAL DESIGN SERVICES OF THE GATE 6 WAREHOUSE, SPECIFICALLY TASKS 1/PROJECT INITIATION AND TASK 2/PROGRAMMING (3 MONTHS) |
| Jul 1, 2024 | PAF4 | $-796.8K | DEOBLIGATION OF BA51 FUNDS IN EXCESS OF CONTRACT VALUE FOR CONTRACT CONVERSION IN EASI |
| Jun 26, 2024 | PAF3 | $0 | ADD BLDG NUMBER TO ACCTG STRING |
| Jun 11, 2024 | PSF2 | $156.3K | PROVIDE PROFESSIONAL A/E SERVICES TO EXPAND THE POR FOR THE I&A PROJECT TO ORGANIZE THEIR PROGRAM WITHIN THE ICE HQ BUILDING |
| May 23, 2024 | PSF1 | $69.3K | PROVIDE DOC 2D CONSTRUCTION ADMINISTRATION SERVICES FOR AN ADDITIONAL THREE MONTHS |
| Apr 22, 2024 | PSE9 | $839.6K | CISA HQ BIDDER NEGOTIATION SUPPORT PROPOSAL TASK 25 CISA HQ STANDALONE ELECTRIFICATION PROPOSAL TASK 24 CISA HQ CUP2 ELECTRIFICATION (PHASE 2) ANALYSIS PROPOSAL TASK 23 |
| Mar 28, 2024 | PSE8 | $71.8K | PROVIDE A DHS ICE HQ FEASIBILITY STUDY TO INCLUDE I-A AS TENANT |
| Feb 26, 2024 | PAE7 | $0 | CORRECT THE CLIN 0099 MOD SOW PERIOD OF PERFORMANCE COMPLETION DATE FROM 02/09/2024 TO 04/25/2024. |
| Feb 21, 2024 | PSE6 | $163.7K | ICE HQ TENANT FIT-OUT DOCUMENT, GATE 1 GARAGE HISTORIC PRESERVATION SERVICES, HISTORIC PRESERVATION SERVICES ICE HQ, DOC 2D COLD-FORMED METAL FRAMING TESTING, NO COST EXTENSION OF THE PERIOD OF PERFORMANCE UNDER CLIN 0053 |
| Dec 22, 2023 | PSE5 | $211.8K | CONTRACTOR SHALL PROVIDE PROFESSIONAL SERVICES TO INCLUDE CISA HQ BID SERVICES TASK 18B, CISA HQ - IRA COMPLIANCE ANALYSIS TASK 21, CISA HQ - CUP2 ELECTRIFICATION ANALYSIS TASK 22 |
| Oct 27, 2023 | PSE4 | $52.3K | CONTRACTOR SHALL PROVIDE EXISTING UTILITY LOCATING SERVICES TO SUPPORT THE RESILIENCE PLAZA PROJECT. THE EXISTING STEAM TUNNEL WILL BE SURVEYED TO LOCATE AND DOCUMENT THE EXISTING TOP OF THE TUNNEL AND SLOPE ACROSS THE RESILIENCE PLAZA SITE. |
| Sep 28, 2023 | PSE3 | $0 | 174 NO COST CALENDAR DAY EXTENSION (6 MONTHS) |
| Sep 21, 2023 | PSE2 | $485.4K | PROVIDE PROFESSIONAL SERVICES FOR TH EST. ELIZABETHS RESILIENCE PLAZA TASKS 3, 4 AND 5 AND GEOTECHNICAL ENGINEERING REPORT TASK 7 |
| Aug 29, 2023 | PSE1 | $292.2K | ADD ODCS ICE DIRECT EXPENSES |
| Aug 7, 2023 | PSD9 | $13.3M | PROVIDE PROFESSIONAL DESIGN SERVICES FOR THE POR, SURVEY, CONCEPTS DESIGN FOR THE ICE HQ AND FOR THE PARKING GARAGE 1 BRIDGING DESIGN UNDER THE DHS CONSOLIDATION ON THE ST ELIZABETHS WEST CAMPUS |
| Jun 13, 2023 | PCD8 | $175.0K | PDL/NTE TASK 3, RESILIENCE PLAZA. CONTRACTOR SHALL BEGIN TASK 3 - TO PREPARE A COST EST AND DEVELOP CONSTRUCTION DWGS AND SPEC FOR GARDEN SITE AND DISPLAY RESILIENCE PLAZA ST E WEST CAMPUS. SOW GARDEN SITE 05302023, CLIN COMPLETION: 08.31.23 |
| May 15, 2023 | PSD7 | $170.2K | REVIEW BIDDER RFIS PROVIDE RESPONSES, EVALUATE VIABILITY OF SUBSTITUTION REQUESTS, PREPARE ADDENDUM TO ADDRESS SUBSTITUTIONS OR CHANGES, ASSIST WITH PREBID CONFERENCES OR PREAWARD CONFERENCES, IF REQD, CONDUCT 2 SITE VISITS FOR PROSPECTIVE BIDDERS. |
| Apr 19, 2023 | PSD6 | $0 | POP EXTENSION FOR PROGRAM OF REQUIREMENTS - DHS OFFICE OF INTELLIGENCE AND ANALYSIS |
| Feb 28, 2023 | PSD5 | $34.1K | CONTRACTOR TO PROVIDE ADDITIONAL SERVICES, DOCUMENT CHANGES AND RELATED WORK IN RESPONSE TO PROJECT UPDATES AND REQUESTS THAT IMPACT THE DOC 2D ISSUE FOR CONSTRUCTION DOCUMENT SET DATED 4.27.22. |
| Feb 7, 2023 | PSD4 | $23.7K | EXTEND TASK 17 EFFORTS OF ARCHL DESIGN/DETAILING REVIEW, DOC COORDINATION, AND ADMIN-RELATED TASKS FOR WATER LEAK DIAGNOSIS AND EVAL AT ADDL AREA: CTYD FOUNTAIN, MOAT, AND ABANDONED DRAIN BODY. ADDL TESTING, ETC. |
| Jan 18, 2023 | PSD2 | $0 | POP EXTENSION TO ALLOW THE GOVERNMENT TO PROVIDE COMMENTS ON DELIVERABLES. |
| Oct 6, 2022 | PAD1 | $0 | CORRECT ORG CODE ON ACCTG STRING FROM P1140001 TO P11J0001 |
| Sep 26, 2022 | PSC9 | $242.2K | DEVELOP MICRO POR BASED ON REV'D SOW/DHS OFF OF INTELLIGENCE AND ANALYSIS. 1/EXISTING FACILITIES SURVEY, DOCUMENTATION 2/DHS I&S INTERVIEWS, VISIONING SESSIONS, SURVEYS, INVENTORY 3/POR DEV, DOCUMENTATION, REFINEMENT AND 4/PERFORMANCE MATRIX DEV. |
| Aug 22, 2022 | PSC8 | $95.1K | CONTRACTOR SHALL PROVIDE COORDINATION, ARCH DESIGN, CONSTR DOC PRODUCTION, AND CONSTR ADMIN SVCS, RELATED TO CWMD'S NBIC SPACE AT LL8 TO CREATE GLASS-WALLED ENCLOSURE AT CURRENT WATCH WALL DISPLAY AREA, TO SEPARATE FROM ADJACENT WORKSTATIONS. |
| Aug 2, 2022 | PSC7 | $120.4K | CONTRACTOR SHALL PROVIDE FIELD OBSERVATIONS, ARCHITECTURAL DETAILING, AND DOCUMENT COORDINATION RESULTING FROM ON-SITE FIELD TESTING FOR WATER INTRUSION AT THE MUNRO LL7 STAIR #8 VESTIBULE AND THE LL1 COURTYARD FOUNDATION DRAIN. |
| Jul 25, 2022 | PSC6 | $117.6K | PROVIDE PROFESSIONAL SERVICES FOR CLIN 0076 3D LASER SCANNING, CLIN 0077 TEMPORARY PARKING NEAR CISA HQ TASK 20 |
| Jun 27, 2022 | PAC5 | $0 | CORRECT RWA FUNDING |
| Jun 7, 2022 | PSC4 | $95.2K | CONTINUED CONSTRUCTION ADMINISTRATION (CA) SERVICES FOR THE G801 SECURITY PROJECT, FOR THE CONSTRUCTION OF THE LL7 PRIVATE OFFICES IN THE MUNRO BUILDING AND FOR SMOKESTACK NO. 2 UNANTICIPATED SURVEY TASK |
| Mar 22, 2022 | PSC3 | $0 | POP EXTENSION |
| Feb 16, 2022 | PSC2 | $191.8K | PROVIDE PROFESSIONAL SERVICES FOR ADDITIONAL DESIGN WORK TO CORRECT DEFICIENCIES ON THE SMOKE EVACUATION AND STAIR PRESSURIZATION SYSTEMS IN THE DOC |
| Dec 28, 2021 | PSC1 | $30.6K | REMEDIAL SERVICES FOR DOC A 2B, CA PHASE SCHEDULE ADJUSTMENT/LABOR RATE INCREASE - DOC A PHASE 2D |
| Nov 23, 2021 | PSB8 | $0 | EO14042 ENSURING ADEQUATE COVID SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS |
| Nov 23, 2021 | PSB9 | $161.1K | CONTRACTOR SHALL PROVIDE CONSTRUCTION PHASE SERVICES ASSOCIATED WITH CONTRACT ADMINISTRATION FOR THE EARLY SITE PACKAGE ISSUED IN MAY 2021. |
| Sep 28, 2021 | PSB7 | $311.8K | PROVIDE PROFESSIONAL SERVICES FOR TASK 12, 13, 14, AND 15, RELATED TO THE MUNRO REPROGRAMMING DESIGN WORK |
| Jul 2, 2021 | PSB6 | $48.2K | ADDITIONAL WORK TO INCORPORATE THE GDIT PROGRAM UPDATE INTO THE 90% CD PACKAGE FOR THE DOC 2D, |
| May 3, 2021 | PSB5 | $61.9K | TASK 11, MECHANICAL ENGINEERING CHANGES REQUIRED FOR THE MUNRO OPTIMIZATION WORK |
| Apr 12, 2021 | PSB4 | $158.5K | PROVIDE ANALYSIS OF SMOKESTACK CONSTRUCTION DOCUMENTATION, REVIEW OF RENOVATION OR PREVIOUS STABILIZATION DOCUMENTATION, ETC. TO PROVIDE RECOMMENDATIONS FOR IMMEDIATE REPAIRS NEEDED TO MAINTAIN OR IMPROVE STRUCTURAL INTEGRITY OF THE SMOKESTACKS. |
| Mar 8, 2021 | PSB3 | $181.7K | TASK 11 - INTERIM LEVEL 5 FENCE TASK 13 - FOOD SERVICE CONSULTATION |
| Feb 1, 2021 | PSB2 | $30.1K | PROVIDE ADDITIONAL AE SERVICES FOR CENTER BUILDING G801 SECURITY UPGRADES |
| Jan 21, 2021 | PSB1 | $342.1K | ADDITIONAL SMOKESTACK DESIGN AND SINGLE CUBE MODIFICATION RE-DESIGN |
| Oct 28, 2020 | PSA9 | $449.3K | CONTRACTOR SHALL PROVIDE A ED PROGRAM OF REQUIREMENTS, TOGETHER WITH COST ESTIMATES AND DESIGN INTENT DOCUMENTS FOR THE GARDEN SITE AND DISPLAY TO BE DEVELOPED WITHIN THE ST. ELIZABETHS WEST CAMPUS. |
| Sep 14, 2020 | PSA8 | $127.9K | PROVIDE CONSTRUCTION OPERATIONS BUILDING INFORMATION EXCHANGE(COBIE) SERVICES TO THE CURRENT DESIGN AND CONSTRUCTION ADMINISTRATION WORK ON DOC A - PHASE 2D |
| Jun 24, 2020 | PSA7 | $5.1M | TASK 2 BUILDING 56.57 STABILIZATION TASK 3 HISTORIC SMOKESTACKS STABILIZATION TASK 4 PLATEAU SITEWORK STABILIZATION AND TASK 5 CISA HQ PLAZA. |
| Jun 3, 2020 | PSA6 | $313.4K | MUNRO OPTIMIZATION - DID 2, CD AND CA PHASES AND LIMITED SURVEY CONTRACTOR SHALL CONTINUE DESIGN SERVICES, AS WELL AS CONSTRUCTION PHASE SERVICES FOR THE OPTIMIZATION OF THE DHS HQ DID 2, CD AND CA PHASES. |
| Apr 14, 2020 | PSA5 | $15.4M | PROVIDE PROFESSIONAL AE DESIGN SERVICES FOR THE CISA HEADQUARTER DEVELOPMENT TASK 00 AND TASK 01 |
| Mar 30, 2020 | PSA3 | $0 | IMPLEMENT SECTION 889 |
| Mar 30, 2020 | PSA4 | $257.3K | AE DESIGN SERVICES FOR THE CENTER BUILDING G 801 UPGRADES |
| Mar 20, 2020 | PSA2 | $932.5K | PROVIDE PROFESSIONAL AE DESIGN SERVICES FOR DOC A - PHASE 2D |
| Jan 23, 2020 | PSA1 | $296.3K | TASK 5 PHASE 1 DID FOR MUNRO BLDG REPROGRAMMING |
| Nov 22, 2019 | PS99 | $1.2M | MASTER PLAN AMENDMENT2 DOCUMENT DEVELOPMENT ETC, MASTER PLAN AMENDMENT2 SUPPLEMENTAL EIS ETC. AND PLATEAU SITE GEOTECHNICAL INVESTIGATIONS |
| Oct 22, 2019 | PS98 | $75.4K | PROVIDE PROFESSIONAL SERVICES FOR AN ASSESSMENT AND REMEDIATION PLAN FOR THE BIRCH STREET SINKHOLE, LOCATED ON THE ST. ELIZABETHS WEST CAMPUS |
| Oct 17, 2019 | PS97 | $104.7K | TASK 20A EXTENSION OF CA SERVICES FROM APRIL 2019 THROUGH SEPTEMBER 2019 TASK 20B WATER INTRUSION MITIGATION AND ADDITIONAL WATERPROOFING AT STAIR CHARLIE CONNECTOR TUNNEL. TASK 20C STAIR DELTA FIRE SUPPRESSION MODIFICATIONS |
| Sep 17, 2019 | PS96 | $238.1K | CONTRACTOR TO PROVIDE DESIGN SERVICES TO SUPPORT DHS IN MUNRO PROGRAM VALIDATION EFFORTS TASK 4 |
| Jul 22, 2019 | PS95 | $238.4K | PROVIDE MUNRO PROGRAM VALIDATION WHICH IS DESIGN SERVICES TO SUPPORT DHS IN DEPARTMENTAL GROUP PRE POR MEETINGS, PERFORMING A LIMITED INTERIOR EXISTING CONDITIONS SURVEY, AND VALIDATING THE POR ONCE FINALIZED BY DHS. |
| Apr 22, 2019 | PS94 | $49.9K | CONTRACT NO. GS-11P-08-MK-C-0080 PROFESSIONAL AE DESIGN SERVICES FOR THE ST ELIZABETHS CONSOLIDATION SE WASH DC MOD PS94 - SMOKESTACK STABILITY REMEDIATION PLAN THE CONTRACTOR'S SIGNATURE IN BLOCK 15B INDICATES HIS AGREEMENT TO PROVIDE ALL LABOR, SUPERVISION, MATERIAL, AND EQUIPMENT FOR THE FOLLOWING CLIN AS AN AGGREGATE ADD TO THE CONTRACT IN THE AMOUNT OF $49,926.00. IN ACCORDANCE WITH FAR 52.243 - CHANGE CLAUSE (FIXED PRICE), YOU ARE HEREBY AUTHORIZED TO PROCEED WITH THE FOLLOWING: (REFER TO INDIVIDUAL CE'S, SCOPE OF WORK). CLIN 0042: SMOKESTACK STABILITY REMEDIATION PLAN ADD: $49,926.00 CONTRACTOR TO PROVIDE A SMOKESTACK STABILITY REMEDIATION PLAN TO OUTLINE REMEDIATION EFFORTS NEEDED FOR THE SMOKESTACKS DUE TO THEIR CURRENT POOR CONDITION AND RECENT REPORTS OF SIGNIFICANT MOVEMENTS. REF ZGF PROPOSAL DATED 01/04/2019 ALL WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALL APPLICABLE CONTRACT REQUIREMENTS, REGULATIONS AND STANDARDS. SETTLEMENT OF THIS CHANGE INCLUDES ALL ASSOCIATED COSTS, DIRECT AND INDIRECT, IMPACT AND DELAY. ALL TERMS AND CONDITIONS REMAIN IN FULL FORCE AND EFFECT. |
| Mar 28, 2019 | PS93 | $280.5K | CONTRACT NO. GS-11P-08-MK-C-0080 PROFESSIONAL AE DESIGN SERVICES FOR THE ST ELIZABETHS CONSOLIDATION SE WASH DC MOD PS93 - SUPPLEMENTAL ENVIRONMENTAL IMPACT PROCESS - TASK 14 AND 15 THE CONTRACTOR'S SIGNATURE IN BLOCK 15B INDICATES HIS AGREEMENT TO PROVIDE ALL LABOR, SUPERVISION, MATERIAL, AND EQUIPMENT FOR THE FOLLOWING CLIN AS AN AGGREGATE ADD TO THE CONTRACT IN THE AMOUNT OF $280,503.00. IN ACCORDANCE WITH FAR 52.243 - CHANGE CLAUSE (FIXED PRICE), YOU ARE HEREBY AUTHORIZED TO PROCEED WITH THE FOLLOWING: (REFER TO INDIVIDUAL CE'S, SCOPE OF WORK). CLIN 0041: SUPPLEMENTAL ENVIRONMENTAL IMPACT PROCESS - TASK 14 AND 15 ADD: $280,503.00 CONTRACTOR TO PROVIDE FOR THE DEVELOPMENT OF THE DHS HQ CONSOLIDATION AT ST. ELIZABETHS MASTER PLAN AMENDMENT #2 SUPPLEMENTAL EIS PROCESS. THIS WORK WILL BE BASED ON THE PRELIMINARY CONSENSUS CONCEPT DEFINED WITH THE CONSULTING PARTIES IN LATE NOVEMBER 2018, AND DEVELOPED AS PART OF THE MASTER PLAN AMENDMENT 2 DOCUMENT. THE SOW INCLUDES ADDENDUMS TO TWO TASKS OF THE 2018 MASTER PLAN AMENDMENT EFFORTS: TASK 14 AND 15. REFERENCE: PROPOSAL DATED ON FEBRUARY 13, 2019. ALL WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALL APPLICABLE CONTRACT REQUIREMENTS, REGULATIONS AND STANDARDS. SETTLEMENT OF THIS CHANGE INCLUDES ALL ASSOCIATED COSTS, DIRECT AND INDIRECT, IMPACT AND DELAY. ALL TERMS AND CONDITIONS REMAIN IN FULL FORCE AND EFFECT. |
| Jan 7, 2019 | PS92 | $89.8K | CONTRACT NO. GS-11P-08-MK-C-0080 PROFESSIONAL AE DESIGN SERVICES MOD PS92- ADDITIONAL DESIGN AND DOCUMENTATION SERVICES THE CONTRACTOR'S SIGNATURE IN BLOCK 15B INDICATES HIS AGREEMENT TO PROVIDE PROFESSIONAL AE DESIGN SERVICES FOR THE FOLLOWING CLIN'S AS AN AGGREGATE ADD TO THE CONTRACT IN THE AMOUNT OF $89,831.00. IN ACCORDANCE WITH FAR 52.243 - CHANGE CLAUSE (FIXED PRICE), YOU ARE HEREBY AUTHORIZED TO PROCEED WITH THE FOLLOWING: (REFER TO INDIVIDUAL CE'S, SCOPE OF WORK). CLIN 0039: ADD'L CONSTRUCTION ADMINISTRATION SERVICES - DOC ADD: $75,049.00 CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT TO INCORPORATE TENANT'S REQUESTED DESIGN CHANGES, WHICH WERE ISSUED AFTER CONTRACT AWARD. THE DESIGN CHANGES INCLUDE: ADJUSTING ELECTRICAL PATHWAYS; CHANGES TO RECEIVE AND OPERATE THE TURNSTILES; AND SECURITY FEATURES ADDED TO EACH TRAILER. THE INTERIOR DOORS ARE TO BE CHANGED TO STAINLESS STEEL AND ALL INTERIOR WINDOWS ARE TO BE REMOVED. ADDITIONALLY, DEDICATED CIRCUITS ARE TO BE INSTALLED IN CONDUIT FOR RADIATION DETECTORS AND FOR DISTRESSED PANIC BUTTONS. ALL THIS WORK IS TO BE COMPLETED IN ACCORDANCE WITH THE MANUFACTURE RECOMMENDATIONS. REFERENCE: PROPOSAL DATED ON NOVEMBER 30, 2018 CLIN 0040: GATE 3- O&A MODIFICATIONS CONSTRUCTION REQUIREMENTS FOR DOC PHASE 2A ADD: $14,782.00 CONTRACTOR SHALL PROVIDE ADDITIONAL SERVICES NEEDED TO INCORPORATE THE CHANGES REQUESTED FOR THE DOC - I&A MODIFICATIONS CONSTRUCTION REQUIREMENTS INTO THE PHASE 2A CONSTRUCTION DOCUMENTS AND WILL ISSUE A BULLETIN TO THE CONSTRUCTION CONTRACTOR COVERING THE SCOPE OF THE CHANGES. REFERENCE: PROPOSAL DATED ON DECEMBER 20, 2018 ALL WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALL APPLICABLE CONTRACT REQUIREMENTS, REGULATIONS AND STANDARDS. SETTLEMENT OF THIS CHANGE INCLUDES ALL ASSOCIATED COSTS, DIRECT AND INDIRECT, IMPACT AND DELAY. ALL TERMS AND CONDITIONS REMAIN IN FULL FORCE AND EFFECT. |
| Sep 25, 2018 | PC91 | $-6.5M | CONTRACT GS-11P-08-MK-C-0080, PROFESSIONAL AE DESIGN SERVICES FOR ST ELIZABETHS WEST CAMPUS CONSOLIDATION PROGRAM (PHASE 3) MOD PC91 DEOBLIGATION OF $6,521,237.00 (PHASE 3) EFFECTIVE WITH THE ISSUANCE OF THIS MODIFICATION, GSA IS HEREBY DEOBLIGATING FUNDS IN THE AMOUNT OF $6,521,237.00 AS EXECUTED UNDER MOD PS63, CLIN 0006 CORRESPONDING TO DESIGN SERVICES FOR NEW CONSTRUCTION BUILDINGS ON THE PLATEAU ON ST ELIZABETHS WEST CAMPUS, SE, WASH., DC. REFERENCE JUSTIFCATION: DEOBLIGATION NOTIFICATION AND AGREEMENT, DATED 09/14/18, SIGNED BY GSA AND ZGF ON 09/17/2018. THIS MOD HAS NO EFFECT ON COMPLETION DATE. ALL WORK, AND REMAINING WORK, IS TO BE ACCOMPLISHED IN ACCORDANCE WITH ALL APPLICABLE STANDARDS, REQUIREMENTS AND REGULATIONS. ALL TERMS AND CONDITIONS REMAIN IN FULL FORCE AND EFFECT. |
| Sep 17, 2018 | PS90 | $529.0K | CONTRACT NUMBER- GS-11P-08-MK-C-0080 MOD PS90: AE DESIGN SERVICE - TENANT FIT-OUT CONSTRUCTION DOC A PHASE 2C THE CONTRACTOR'S SIGNATURE IN BLOCK 15B INDICATES HIS AGREEMENT TO PROVIDE AE DESIGN SERVICES FOR THE FOLLOWING CLIN AS AN AGGREGATE ADD TO THE CONTRACT IN THE AMOUNT OF $528,957.00 ALL WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALL APPLICABLE CONTRACT REQUIREMENTS, REGULATIONS AND STANDARDS. IN ACCORDANCE WITH FAR 52.243 - CHANGE CLAUSE (FIXED PRICE), YOU ARE HEREBY AUTHORIZED TO PROCEED WITH THE FOLLOWING: (REFER TO INDIVIDUAL CES, SCOPE OF WORK). CLIN 0038 : ADD: $528,957.00 AE TO PROVIDE DESIGN SERVICES FOR THE TENANT BUILD-OUT OF PHASE 2C OF THE DOC A FIT OUT, INCLUDING: CONFIRMING THE PROGRAM OF REQUIREMENTS, PROVIDING COST ESTIMATES, DEVELOPING DIDS, CONSTRUCTION DRAWINGS AND SPECIFICATIONS. REF. ZGF PROPOSAL DATED (05/10/2018) ALL WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALL APPLICABLE CONTRACT REQUIREMENTS, REGULATIONS AND STANDARDS. SETTLEMENT OF THIS CHANGE INCLUDES ALL ASSOCIATED COSTS, DIRECT AND INDIRECT, IMPACT AND DELAY. ALL TERMS AND CONDITIONS REMAIN IN FULL FORCE AND EFFECT. |
| Jul 24, 2018 | PS89 | $70.6K | ANTENNA PATHWAY AND CA PHASE EXTENSION |
| Jun 19, 2018 | PS88 | $534.0K | MASTER PLAN STUDY 2018 |
| Apr 10, 2018 | PS87 | $24.3K | EXTEND BID PHASE SERVICES |
| Jan 18, 2018 | PS85 | $-1.1M | NEW DESIGN SERVICES AE FOR PHASE 2 AND 3, CREDITS AND ADDS. |
| Oct 30, 2017 | PS84 | $119.2K | TASK 3.2, TASK 4.1 AND 4.2 22 WEEK CONSTRUCTION ADMINISTRATION EXTENSION |
| Sep 22, 2017 | PS83 | $123.4K | FINALIZE THE RIGHT OF WAY TRANSFER AND THE PREPARATION OF THE TRANSFER OF JURISDICTION (TOJ) FOR THE EXISTING ACCESS ROAD, RELATED TO THE I295 /MALCOLM X INTERCHANGE |
| Aug 1, 2017 | PS82 | $600.8K | MOD PS82 TENANT SUITE COST ESTIMATE CONTRACTOR TO PROVIDE A COST ESTIMATE FOR THE DOC PHASE 2B, BROKEN OUT BY TENANT SUITE AND OTHER COMPONENTS OF THE BUILD-OUT FOR THE PURPOSES OF SUPPORTING GSA AND DHS PROJECT PLANNING. AND BIDDING AND CONSTRUCTION CONTRACTOR TO PROVIDE BIDDING/NEGOTIATION AND CONSTRUCTION ADMINISTRATION SERVICES FOR BUILD-OUT IN DOC BLOCK A, INCLUDING THE NATIONAL OPERATIONS CENTER, THE INTELLIGENCE WATCH /WARNINGS AND THE OPS COMPONENT. |
| Jun 20, 2017 | PS81 | $13.8K | PROFESSIONAL AE DESIGN SERVICES ADDITIONAL SCOPE REQUESTS: EOC/NOC BREAK ROOM MODIFICATIONS. |
| May 15, 2017 | PS80 | $95.5K | EXTENSION OF PROJECT MANAGEMENT SERVICES FOR SOUTH CAPITOL STREET INTERCHANGE, TASK 17, INCLUDING THE DCRA FINAL PERMIT WORK |
| Apr 18, 2017 | PS79 | $246.1K | SITE LIGHTING DESIGN, ELEVATOR SUBSTITUTION SUBMITTAL REVIEW, EXTENDED CONSTRUCTION ADMINISTRATION SCHEDULE , ADDITIONAL SERVICES |
| Apr 7, 2017 | PS78 | $31.1K | ENVIRONMENTAL PERMITTING APPROVAL |
| Mar 13, 2017 | PS77 | $343.1K | MUNRO OPTIMIZATION, DD THROUGH CA |
| Mar 2, 2017 | PS76 | $289.7K | UPDATES TO THE STRUCTURAL DESIGN ON SEVERAL BRIDGES AT THE REQUEST OF DDOT DURING THE 100% DESIGN SUBMITTAL AND TO INCLUDE ADDITIONAL DESIGN TASKS EVOLVING FROM THE DHS REQUEST TO MAKE THE EXISTING ACCESS ROADWAY AND INTERCHANGE CONNECTIONS TO THE ST. ELIZABETHS CAMPUS PRIVATE . |
| Feb 14, 2017 | PS75 | $261.5K | DDOT REVIEW TASK 14 |
| Jan 30, 2017 | PS86 | $109.2K | ADDITIONAL SERVICES FOR THE EXTENSION OF DOC A PHASE 2A (LL2&3) |
| Jan 27, 2017 | PS74 | $71.3K | ADDITIONAL PROFESSIONAL SERVICES FOR DESIGN, CA SERVICES FOR NOC ANTENNA EQUIPMENT ROOM TASK 9 |
| Dec 6, 2016 | PC73 | $-57.2K | DEOB FUNDS IN EXCESS OF CLIN 0016 VALUE UNDER MOD PS50 FOR BLDG REDESIGN DUE TO BALLSTON MOVE |
| Oct 31, 2016 | PS72 | $576.3K | PROFESSIONAL SERVICES FOR A FINAL DESIGN TASK 13 TO COMPLETE 100% DESIGN |
| Sep 1, 2016 | PA71 | $171.1K | DE-SCOPING FOR ADD'L SVCS TO INCLUDE SURVEY, BIM MODELING, DRAWINGS, AND SPECIFICATIONS FOR: LOWER LEVEL 2 BREAK ROOM.-- NEW ENTRANCE VESTIBULE AT FUTURE CONNECTION TO WEST ADDITION.--MAINTENANCE CATWALK (INCLUDING ACCESS AND ANY REQUIRED MEP RE-ROUTING, AND SAFETY LIGHTING) TO SERVE GDIT PULLBOX IN LL2 SHELL SPACE.--RESOLUTION OF PRE-EXISTING AC DEFICIENCY IN UPS ROOM. |
| Aug 17, 2016 | PA70 | $-171.1K | DE-SCOPED ITEMS: PORS, DIDS, CDS FOR VARIOUS TENANTS |
| Aug 17, 2016 | PS69 | $1.7M | ASK 4 AND TASK 5 / MUNRO OPTIMIZATION |
| Aug 1, 2016 | PA68 | $1.5M | REOBLIGATION OF FUNDS UNDER PROJECT NDC00256 |
| Jul 20, 2016 | AA67 | $-1.5M | DEOBLIGATION OF NDC00254 FUNDS FROM CLIN 0009. REOBLIGATION TO BE UNDER NDC00256 |
| Jun 27, 2016 | PS66 | $1.5M | PROVIDE UTILITY DESIGN SERVICES FOR PHASE 2 AND 3 AT THE ST ELIZABETHS WEST CAMPUS; AS BUILT DOCUMENTATION FOR PHASE 1 UTILITY DESIGN |
| Jun 16, 2016 | PS65 | $113.3K | I-295 MALCOLM X INTERCHANGE PROJECT - 60 INCH STORM DRAIN INVESTIGATION, WASHINGTON, DC; ADDITIONAL SERVICES RELATED TO FINANCIAL PLAN ( FHWA REQUIREMENTS) |
| May 26, 2016 | PS63 | $10.1M | ADDITIONAL SERVICES-GEOTECHNICAL INVESTIGATING AND TESTING ADDITIONAL GEOTECHNICAL ENGINEERING - DRILLING, TESTING, EVALUATION, SOIL CORROSION TESTING DESIGN SERVICES; MASTER PLAN AMENDMENT #2; REVISIONS TO PRELIMINARY CONCEPTS, POR'S, FEMA TO BRIDGING DOCUMENTS AND FINAL CONCEPTS FOR ICE AND CBP |
| Mar 24, 2016 | PS62 | $148.2K | STREAM RESTORATION PERMITTING AND POST ADVERTISEMENT SERVICES |
| Feb 23, 2016 | PS61 | $1.2M | ARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC; I295/MX ST. FINAL DESIGN |
| Jan 14, 2016 | PS59 | $1.8M | ARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC / ADDITIONAL DESIGN SERVICES |
| Jan 12, 2016 | PS60 | $7.5M | ARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC; I295/MX ST. FINAL DESIGN |
| Oct 13, 2015 | PS57 | $288.2K | A-E DESIGN SERVICES FRO ST ELIZABETHS WEST CAMPUS, SE, WASH., DC: DESIGN SERVICES - I295/MX ST. |
| Oct 13, 2015 | PS58 | $-175.8K | ARRA FUNDED AE DESIGN SERVICES AT ST ELIZABETHS/DHS CONSOLIDATION, WASH., DC: DEOBLIGATION OF EXCESS ARRA FUNDS |
| Aug 26, 2015 | PS54 | $0 | ARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC : COMPILATION SURVEY, PACKAGE REISSUE, EXTENSION OF SVCS, HILL STABILIZATION |
| Aug 26, 2015 | PS55 | $0 | ARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC : ANALYZE BILLING OVERTIME |
| Aug 26, 2015 | PS56 | $0 | ARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC : ADD'L DESIGN SERVICES |
| Jul 23, 2015 | PS53 | $0 | ARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC: ELECTRICAL REMODEL |
| Jul 7, 2015 | PS51 | $0 | ARRA FUNDED AE PROFESSIONAL DESIGN SERVICES FOR ST ELIZABETHS CONSOLIDATION PROGRAM, SE, WASH., DC: STREAM RESTORATION AND STOCKPILE ASSESSMENT |
| Jul 7, 2015 | PS52 | $0 | ARRA FUNDED ARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC : TOILET FACILITIES EXPANSION |
| Jun 25, 2015 | PS50 | $247.9K | PROFESSIONAL A/E DESIGN SERVICES FOR THE ST ELIZABETHS CAMPUS, SE, WASH., DC: BLDG RE-DESIGN DUE TO BALLSTON PERSONNEL RELOCATION |
| Jun 24, 2015 | PS49 | $0 | ARRA FUNDED: PROFESSIONAL A/E DESIGN SERVICES, ST ELIZABETHS WEST CAMPUS, SE, WASH., DC: STAGE 2 IT, AV AND SECURITY DESIGN SERVICES |
| Jun 10, 2015 | PS47 | $0 | ARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC |
| Jun 10, 2015 | PS48 | $0 | ARRA FUNDED: PROFESSIONAL A/E DESIGN SERVICES, ST ELIZABETHS WEST CAMPUS, SE, WASH., DC: CORRECT MATH ERROR; GEOTECHNICAL CONSULTING, CIVIL ENGINEERING, AND STAGE 2 IT, AV AND SECURITY DESIGN SERVICES RELATED TO THE DOC A PHASE 2 PROJECT. |
| May 20, 2015 | PS44 | $0 | AARRA FUNDED AE PROFESSIONAL DESIGN SERVICES FOR ST ELIZABETHS CONSOLIDATION PROGRAM, SE, WASH., DC: REALLOCATION FOR STORMWATER RETENTION CREDIT CERTIFICATION |
| May 20, 2015 | PS45 | $0 | ARRA FUNDED AE PROFESSIONAL DESIGN SERVICES FOR ST ELIZABETHS CONSOLIDATION PROGRAM, SE, WASH., DC: ELECTRICAL STUDY OF THE ST. ELIZABETHS WEST CAMPUS |
| May 20, 2015 | PS46 | $0 | ARRA FUNDED AE PROFESSIONAL DESIGN SERVICES FOR ST ELIZABETHS CONSOLIDATION PROGRAM, SE, WASH., DC: WEST CAMPUS BLOCK AND STACKING STUDY FOR THE ST. ELIZABETHS WEST CAMPUS. |
| Apr 10, 2015 | PS42 | $0 | AE DESIGN SVCS, ST ELIZABETHS CAMPUS, SE, WASH., DC: OPTIMIZING OFFICE SPACE WITHIN THE DOUGLAS MINOR USCG HQ BUILDING (B50) |
| Apr 10, 2015 | PS43 | $0 | AE DESIGN SERVICES, ST ELIZABETHS CAMPUS, SE, WASH., DC ; BRING THE CENTRAL UTILITY PLANT (CUP) EXPANSION DESIGN UP TO A DESIGN/BUILD BRIDGING PACKAGE |
| Apr 6, 2015 | PS41 | $0 | AE DESIGN SVCS, ST ELIZABETHS CAMPUS, SE, WASH., DC: IMPROVEMENTS TO THE ST. ELIZABETH'S CAMPUS ACCESS ROAD AND THE I295/MX INTERCHANGE |
| Feb 26, 2015 | PS38 | $121.9K | CONTRACT MODIFICATION FOR ADDITIONAL A/E DESIGN SERVICES AT THE DHS HQ CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC. |
| Feb 26, 2015 | PS39 | $0 | CONTRACT MODIFICATION FOR ADDITIONAL A/E DESIGN SERVICES USING FUNDS REALLOCATED WITHIN THE CONTRACT. |
| Feb 26, 2015 | PS40 | $0 | CONTRACT MODIFICATION FOR ADDITIONAL A/E DESIGN SERVICES USING FUNDS REALLOCATED WITHIN THE CONTRACT. |
| Jan 6, 2015 | PS36 | $0 | CONTRACT MODIFICATION FOR ADDITIONAL A/E DESIGN SERVICES USING FUNDS REALLOCATED WITHIN THE CONTRACT. |
| Dec 24, 2014 | PS37 | $0 | CONTRACT MODIFICATION FOR ADDITIONAL A/E DESIGN SERVICES USING FUNDS REALLOCATED WITHIN THE CONTRACT. |
| Dec 17, 2014 | PS35 | $0 | CONTRACT MODIFICATION FOR ADDITIONAL A/E DESIGN SERVICES USING FUNDS REALLOCATED WITHIN THE CONTRACT. |
| Nov 20, 2014 | PS34 | $28.1K | CONTRACT MODIFICATION FOR ADDITIONAL A/E DESIGN SERVICES AT THE DHS HQ CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC. |
| Aug 29, 2014 | PS33 | $0 | CONTRACT MODIFICATION FOR ADDITIONAL SERVICES USING FUNDS REALLOCATED WITHIN THE CONTRACT. |
| Aug 1, 2014 | PS32 | $0 | CONTRACT MODIFICATION FOR ADDITIONAL SERVICES USING FUNDS REALLOCATED WITHIN THE CONTRACT. |
| Jul 2, 2014 | PA31 | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT CODES. |
| Jun 27, 2014 | PC30 | $0 | CONTRACT MODIFICATION FOR ADDITIONAL SERVICES REALLOCATED WITHIN THE CONTRACT. |
| Jan 24, 2014 | PC29 | $-736.2K | CONTRACT MODIFICATION FOR DEOBLIGATION OF FUNDS NOT NEEDED IN THE CONTRACT. |
| Dec 31, 2012 | PS28 | $0 | CONTRACT MODIFICATION FOR ADDITIONAL SERVICES REALLOCATED WITHIN THE CONTRACT. |
| Dec 18, 2012 | PC27 | $-98.1K | CONTRACT MODIFICATION TO DEOBLIGATE FUNDS THAT ARE NOT NEEDED. |
| Aug 17, 2012 | PS25 | $-465.0K | ARRA MODIFICATION TAS::47 4543::TAS THIS MODIFICATION IS TO DEOBLIGATE FUNDS FROM THE CONTRACT. |
| Aug 17, 2012 | PS26 | $-573.5K | ARRA MODIFICATION TAS::47 4543::TAS THIS MODIFICATION IS TO DEOBLIGATE FUNDS FROM THE CONTRACT. |
| May 11, 2012 | PC23 | $650.7K | ARRA MODIFICATION TAS::47 4543::TAS CONTRACT MODIFICATION TO CANCEL MOD PS16 (DATED 12/27/2011) AND REOBLIGATE THE FUNDS. |
| May 11, 2012 | PC24 | $390.0K | ARRA MODIFICATION TAS::47 4543::TAS CONTRACT MODIFICATION TO CANCEL MOD PS18 (DATED 12/27/2011) AND REOBLIGATE THE FUNDS. |
| Mar 19, 2012 | PS22 | $-8.4M | ARRA RECOVERY ACT TAS::47 4543:: MODIFICATION TO REDUCE OBLIGATED FUNDING FOR A/E DESIGN SERVICES FOR THE DHS CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC. |
| Jan 3, 2012 | PS21 | $-1.6M | RECOVERY ACT MODIFICATION TAS::47 4543::TAS IN SUPPORT OF THE ST. ELIZABETHS PROJECT - $1,643,479.70 IS DEOBLIGATED FROM THE BASE CONTRACT FOR PHASE 2B AND OPTION 17 HAS BEEN CREATED FOR THIS PORTION OF WORK BEING DELETED THAT MAY BE EXERCISED AT A LATER DATE. |
| Dec 27, 2011 | PS16 | $-650.7K | ARRA MODIFICATION TAS::47 4543::TAS CONTRACT MODIFICATION TO DEOBLIGATE FUNDS FROM THIS CONTRACT AND CREATE AN OPTION TO BE EXERCISED AT A LATER DATE. |
| Dec 27, 2011 | PS17 | $-44.2K | ARRA MODIFICATION TAS::47 4543::TAS CONTRACT MODIFICATION TO DEOBLIGATE FUNDS FROM THIS CONTRACT AND CREATE AN OPTION TO BE EXCERCISED AND FUNDED AT A LATER DATE. |
| Dec 27, 2011 | PS18 | $-390.0K | ARRA MODIFICATION TAS::47 4543::TAS CONTRACT MODIFICATION TO DEOBLIGATE FUNDS FROM THIS CONTRACT AND CREATE AN OPTION TO BE EXCERCISED AND FUNDED AT A LATER DATE. |
| Dec 27, 2011 | PS19 | $-39.4K | ARRA MODIFICATION TAS::47 4543::TAS CONTRACT MODIFICATION TO DEOBLIGATE FUNDS FROM THIS CONTRACT AND CREATE AN OPTION TO BE EXCERCISED AND FUNDED AT A LATER DATE. |
| Dec 27, 2011 | PS20 | $-73.8K | ARRA MODIFICATION TAS::47 4543::TAS CONTRACT MODIFICATION TO DEOBLIGATE FUNDS FROM THIS CONTRACT AND CREATE AN OPTION TO BE EXCERCISED AND FUNDED AT A LATER DATE. |
| Oct 27, 2011 | PC15 | $-48.2K | ARRA TAS::47 4543::TAS CHANGE ORDER TO DEOBLIGATE DUPLICATED FUNDS AND CORRECT FUNDING CODE ON SF30 ONLY. |
| Sep 30, 2011 | PC12 | $0 | ARRA RECOVERY ACT MODIFICATION TAS::47 4543:: CONTRACTOR TO PERFORM ADDITIONAL A/E DESIGN SERVICES FOR DHS CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC. |
| Sep 28, 2011 | PA11 | $0 | ARRA RECOVERY ACT MODIFICATION TAS::47 4543:: ADMINISTRATIVE MODIFICATION TO CORRECT ACCOUNTING LINE. |
| Sep 28, 2011 | PS13 | $-1.9M | ARRA RECOVERY MODIFICATION TAS::47 4743::TAS DEOBLIGATION OF FUNDS FROM THE CONTRACT. |
| Sep 28, 2011 | PS14 | $-358.3K | ARRA RECOVERY ACT MODIFICATION TAS::47 4543:: DEOBLIGATION OF FUNDS FROM THE CONTRACT. |
| Jul 27, 2011 | PS09 | $-2.1M | ARRA RECOVERY ACT MODIFICATION TAS:47 4543::TAS MODIFICATION TO DEOBLIGATE FUNDING FOR A/E DESIGN SERVICES FOR PHASE 3 AND CREATE AN OPTION TO EXERCISE AND FUND AT A LATER DATE. |
| Jul 27, 2011 | PS10 | $-8.1M | ARRA RECOVERY ACT MODIFICATION TAS:47 4543::TAS MODIFICATION TO DEOBLIGATE FUNDING FOR A/E DESIGN SERVICES FOR PHASE 3 AND CREATE OPTIONS TO EXERCISE AND FUND AT A LATER DATE. |
| Jul 1, 2011 | PC07 | $0 | ARRA RECOVERY ACT MODIFICATION TAS::47 4543::TAS CONTRACTOR TO PROVIDE ADDITIONAL A/E DESIGN SERVICES FOR PHASE 3A DESIGN SCOPE CHANGES (WEST CAMPUS INFRASTRUCTURE) TO DEVELOP THE CAMPUS-WIDE LANDSCAPE DESIGN VISION FOR THE DHS CAMPUS. THIS WORK WILL BE PERFORMED WITH MONEY ALREADY OBLIGATED FOR THE PROJECT. |
| Jul 1, 2011 | PC08 | $48.2K | MODIFICATION FOR ADDITIONAL A/E SERVICES FOR THE DHS CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC |
| Sep 30, 2010 | PC05 | $698.0K | ARRA RECOVERY ACT MODIFICATION TAS::47 4543::TAS CONTRACTOR TO PROVIDE ADDITIONAL A/E DESIGN SERVICES FOR THE DHS CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS (FEMA, TSA, ICE, CBP) IN WASHINGTON, DC. |
| Sep 30, 2010 | PS06 | $2.7M | ARRA RECOVERY ACT MODIFICATION TAS::47 4543::TAS CONTRACTOR TO PROVIDE ADDITIONAL A/E DESIGN SERVICES FOR THE DHS CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS (FEMA, TSA, ICE, CBP) IN WASHINGTON, DC. |
| Mar 31, 2010 | PA04 | $0 | ADMINISTRATIVE MODIFICATION TO CORRECT COST ELEMENT CODE IN THE ACCOUNTING AND APPROPRIATION DATA. |
| Mar 30, 2010 | 0 | $7.9M | RECOVERY ACT AWARD ARRA FUNDED CODE: TAS::47 4543::TAS 1) CONTRACTOR TO PROVIDE ARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY (DHS) CONSOLIDATION PROJECT AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC PER THE SCOPE OF WORK DATED 3/19/2010. (FEMA, TSA, ICE, CBP) |
| Mar 30, 2010 | PA01 | $2.0M | NON-ARRA FUNDED AWARD CONTRACTOR TO PROVIDE ARCHITECT-ENGINEER DESIGN SERVICES FOR DEPARTMENT OF HOMELAND SECURITY (DHS) CONSOLIDATION PROJECT (FEMA, TSA, ICE, CBP) PER THE SCOPE OF WORK DATED 3/19/2010. |
| Mar 30, 2010 | PA02 | $22.2M | RECOVERY ACT AWARD ARRA FUNDED CODE: TAS::47 4543::TAS 1) CONTRACTOR TO PROVIDE ARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY (DHS) CONSOLIDATION PROJECT (FEMA, TSA, ICE, CBP) AT THE ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC PER THE SCOPE OF WORK DATED 3/19/2010. |
| Mar 30, 2010 | PA03 | $17.7M | RECOVERY ACT AWARD ARRA FUNDED CODE: TAS::70 9011::TAS 1) CONTRACTOR TO PROVIDE ARCHITECT-ENGINEER DESIGN SERVICES FOR THE DEPARTMENT OF HOMELAND SECURITY (DHS) CONSOLIDATION PROJECT(FEMA, TSA, ICE, CBP) AT ST. ELIZABETH'S WEST CAMPUS IN WASHINGTON, DC PER THE SCOPE OF WORK DATED 3/19/2010. |
Estimated positioning window
Aug 18, 2027 – Feb 18, 2028
60/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 60/100. Available recorded signals: 55 points.
- Contract end 2028-08-18 (656 days from calculation)
- +25 points
- 7 historical awards in this buyer and category group
- +15 points
- 176 recorded award transactions
- +10 points
- Latest award action: 2026-08-27
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Verify whether remaining options may extend performance beyond the current end date.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.