Federal contract award

GSFC0200211DNAS502200

THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyNational Aeronautics and Space Administration
OfficeNASA GODDARD SPACE FLIGHT CENTER
NAICS336414 — Guided Missile and Space Vehicle Manufacturing
PSCAR34 — SPACE FLIGHT - ENGINEERING DEVELOPMENT
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS AWARD FEE
Obligations$4.3B
Current contract value$4.3B
Potential contract value / ceiling$4.3B
Start dateOct 1, 2003
Current end dateDec 25, 2022
Potential end dateDec 25, 2022
Latest award activityAug 29, 2023
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 200 of 278 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 17, 2024308$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Mar 14, 2024307$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jan 16, 2024306$800.0KTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Aug 29, 2023305$2.8MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jul 31, 2023304$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Mar 4, 2023303$3.5MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Feb 28, 2023302$-3.5MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Dec 2, 2022301$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Oct 12, 2022300$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Sep 13, 2022299$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
May 13, 2022298$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Mar 11, 2022297$12.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Nov 19, 2021296$16.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Nov 8, 2021294$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Nov 8, 2021295$0E014042 THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jul 27, 2021293$67.2MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jul 25, 2021292$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Mar 12, 2021291$60.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Feb 3, 2021290$10.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Dec 15, 2020288$25.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Dec 15, 2020289$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Dec 10, 2020287$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Sep 17, 2020286$2.5MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Sep 1, 2020285$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Aug 24, 2020284$40.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Aug 4, 2020283$7.1MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jul 21, 2020281$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jul 21, 2020282$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jul 1, 2020280$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jun 10, 2020279$26.7MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Apr 24, 2020278$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Mar 17, 2020277$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Mar 12, 2020276$80.2MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jan 23, 2020275$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jan 14, 2020274$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jan 7, 2020273$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Dec 16, 2019272$40.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Sep 18, 2019271$75.1MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Aug 12, 2019270$700.0KTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jul 8, 2019268$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jul 8, 2019269$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jun 4, 2019267$36.8MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
May 16, 2019266$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Dec 18, 2018265$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Dec 17, 2018264$30.2MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Nov 15, 2018263$6.6MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Sep 13, 2018261$5.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Sep 12, 2018262$87.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jun 26, 2018259$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jun 26, 2018260$34.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jun 19, 2018258$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Apr 23, 2018257$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Mar 1, 2018256$41.2MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jan 18, 2018255$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Dec 15, 2017254$30.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Dec 8, 2017253$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Oct 23, 2017252$49.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Sep 19, 2017251$29.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Sep 14, 2017250$12.5MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jul 17, 2017249$15.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jul 10, 2017248$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jun 1, 2017247$35.4MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Apr 20, 2017246$25.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Feb 10, 2017245$2.5MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Feb 1, 2017243$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Feb 1, 2017244$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Dec 15, 2016242$110.9MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Oct 11, 2016241$74.7MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Sep 26, 2016240$1.7MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Aug 11, 2016239$2.3MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Aug 4, 2016238$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jul 25, 2016237$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jun 22, 2016236$35.8MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
May 6, 2016235$21.3MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Mar 29, 2016234$27.7MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Mar 1, 2016232$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Mar 1, 2016233$63.7MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jan 28, 2016231$32.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jan 5, 2016230$38.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jan 4, 2016229$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Dec 17, 2015228$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Dec 9, 2015227$17.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Oct 15, 2015226$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Oct 8, 2015225$73.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Sep 28, 2015224$5.5MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Sep 18, 2015223$-206.5KTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Aug 20, 2015222$8.5MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Aug 4, 2015221$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jul 9, 2015220$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
May 26, 2015219$27.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Apr 14, 2015218$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Apr 2, 2015217$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Feb 4, 2015216$143.9MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jan 22, 2015215$26.3MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jan 8, 2015213$26.3MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jan 8, 2015214$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Dec 9, 2014212$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Oct 14, 2014211$90.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Sep 26, 2014210$10.5MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Sep 17, 2014209$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jul 21, 2014208$1.6MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jul 10, 2014207$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jun 5, 2014206$41.6MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jun 2, 2014205$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Apr 17, 2014204$30.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Apr 7, 2014203$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Feb 26, 2014202$139.9MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Feb 3, 2014200$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Feb 3, 2014201$35.8MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jan 7, 2014199$10.8MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Dec 18, 2013198$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Nov 18, 2013197$40.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Oct 24, 2013196$50.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Sep 23, 2013195$19.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Aug 29, 2013194$16.9MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Aug 9, 2013193$4.5MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Aug 8, 2013192$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jul 2, 2013191$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jun 3, 2013190$59.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
May 7, 2013189$25.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Apr 4, 2013188$28.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Feb 28, 2013187$25.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jan 23, 2013186$25.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jan 22, 2013185$40.2MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Dec 13, 2012184$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Nov 28, 2012183$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Oct 18, 2012182$82.8MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Sep 14, 2012181$5.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Aug 13, 2012180$25.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jun 28, 2012179$42.2MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jun 7, 2012178$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Apr 23, 2012177$60.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Feb 23, 2012176$43.9MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jan 17, 2012175$40.2MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jan 12, 2012174$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Dec 9, 2011173$22.9MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Nov 23, 2011170$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Nov 23, 2011171$5.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Nov 23, 2011172$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Oct 21, 2011169$20.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Sep 21, 2011168$28.8MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Sep 1, 2011167$5.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Aug 12, 2011166$20.6MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jun 27, 2011165$21.2MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jun 23, 2011164$10.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jun 17, 2011163$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
May 24, 2011162$15.7MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
May 20, 2011161$4.1MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
May 9, 2011160$5.5MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Apr 21, 2011159$9.3MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Apr 15, 2011158$1.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Apr 8, 2011157$3.5MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Apr 7, 2011156$1.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Mar 24, 2011155$11.1MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Mar 10, 2011154$9.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jan 26, 2011152$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jan 26, 2011153$17.3MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jan 6, 2011151$14.1MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Dec 23, 2010150$5.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Dec 13, 2010149$4.8MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Dec 10, 2010147$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Dec 10, 2010148$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Oct 28, 2010146$20.4MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Oct 7, 2010145$43.1MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Sep 27, 2010144$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Sep 2, 2010143$4.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jul 26, 2010142$15.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jun 18, 2010141$14.7MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
May 25, 2010140$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
May 24, 2010139$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
May 17, 2010138$22.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
May 3, 2010137$1.2MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Apr 21, 2010136$22.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Apr 6, 2010135$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Apr 1, 2010134$-33.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Mar 12, 2010133$60.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Feb 17, 2010132$25.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jan 21, 2010131$25.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jan 14, 2010130$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Dec 24, 2009129$20.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Dec 17, 2009128$1.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Dec 11, 2009127$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Dec 3, 2009126$17.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Nov 25, 2009125$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Nov 6, 2009124$23.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Nov 5, 2009123$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Oct 27, 2009122$2.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Oct 22, 2009121$5.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Oct 9, 2009120$20.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Oct 2, 2009119$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Sep 11, 2009118$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Aug 25, 2009117$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Aug 12, 2009116$843.1KTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jul 14, 2009115$65.0MTAS::80 0119::TAS RECOVERY FUNDING FOR THE JAMES WEBB SPACE TELESCOPE OBSERVATORY NASA/GSFC HAS A REQUIREMENT FOR THE DESIGN, DEVELOPMENT AND LAUNCH OF THE JAMES WEBB SPACE TELESCOPE (JWST), WHICH IS PROCURED UNDER THIS CONTRACT. MODIFICATION 115 ADDS AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) FUNDS TO THE CONTRACT TO COVER AN APPROXIMATELY THREE MONTH PERIOD OF PERFORMANCE DURING WHICH CONTRACTOR WILL PERFORM SPECIFIC TASKS RELATED TO THE DESIGN, DEVELOPMENT AND FABRICATION FOR THE OPTICAL TELESCOPE ELEMENT, THE SUNSHIELD, AND VARIOUS SYSTEM AND SUBSYSTEM AREAS, AS WELL AS COMPLETE TASKS FOR INTEGRATION AND TESTING OF CRITICAL HARDWARE. NASA/GSFC IS PURCHASING THE ITEMS FROM NORTHROP GRUMMAN CORPORATION, REDONDO BEACH, CA UNDER THE EXISTING CONTRACT THAT WAS COMPETITIVELY AWARDED TO THE COMPANY ON 9/16/2002.
Jul 10, 2009114$2.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Jun 17, 2009113$5.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
May 22, 2009112$3.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
May 19, 2009111$0THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Apr 16, 2009110$60.0MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
Mar 19, 2009109$23.7MTHE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.