Federal contract award

HHSN29200069

IGF::OT::IGF PERIOD OF PERFORMANCE 9/27/2017 TO 9/26/ 2018 C104573 REPLACEMENT OF STEAM AND CHILLED WATER IN TUNNEL FROM VALVE VAULT 2 TO VALVE VAULT 31C -

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Health and Human Services
OfficeNIH A E CONSTRUCTION
NAICS541330 — Engineering Services
PSCC1JZ — ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS BUILDINGS
Parent award / vehicleHHSN292201300009I
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$945.7K
Current contract value$945.7K
Potential contract value / ceiling$945.7K
Start dateSep 27, 2017
Current end dateJun 30, 2025
Potential end dateJun 30, 2025
Latest award activityApr 10, 2025
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 10, 2025P00005$0C104573 REPLACEMENT OF STEAM AND CHILLED WATER IN TUNNEL FROM VALVE VAULT 2 TO VALVE VAULT 31C - NO COST TIME EXTENSION (NCTE) TO 6/30/2025
Apr 4, 2024P00004$0C104573 REPLACEMENT OF STEAM AND CHILLED WATER IN TUNNEL FROM VALVE VAULT 2 TO VALVE VAULT 31C - NIH BETHESDA, MD CAMPUS
Apr 1, 2024P00003$0C104573 REPLACEMENT OF STEAM AND CHILLED WATER IN TUNNEL FROM VALVE VAULT 2 TO VALVE VAULT 31C - NIH BETHESDA, MD CAMPUS
Aug 3, 20182$0IGF::OT::IGF::C104573 REPLACEMENT OF STEAM AND CHILLED WATER IN TUNNEL FROM VALVE VAULT 2 TO VALVE VAULT 31C - NIH BETHESDA, MD CAMPUS
Dec 26, 20171$0IGF::OT::IGF PERIOD OF PERFORMANCE 9/27/2017 TO 9/26/ 2018 C104573 REPLACEMENT OF STEAM AND CHILLED WATER IN TUNNEL FROM VALVE VAULT 2 TO VALVE VAULT 31C -
Sep 27, 20170$945.7KIGF::OT::IGF PERIOD OF PERFORMANCE 9/27/2017 TO 9/26/ 2018 C104573 REPLACEMENT OF STEAM AND CHILLED WATER IN TUNNEL FROM VALVE VAULT 2 TO VALVE VAULT 31C -

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.