Federal contract award

HQ072717F1629

IGF::OT::IGF ENGINEERING SERVICES, CET 17-788, E-4B ADVANCED EXTREMELY HIGH FREQUENCY (AEHF) INTEGRATION, PHASE 2 (E-4B INTEGRATION PHASE 2). THE PURPOSE OF THIS TASK IS TO DEVELOP AN INTEGRATED SOLUTION FOR FAB-T AND PNVC CAPABILITY INCLUDING HARDWARE AND SOFTWARE DESIGN ON THE E-4B PLATFORM INCLUDING CORRESPONDING TIME CHANGE TECHNICAL ORDERS (TCTOS), MODIFICATION KIT DEVELOPMENT, AND PROTOTYPE AIRCRAFT INSTALLATION.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeDCMA RADARS AND SENSORS
NAICS541330 — Engineering Services
PSCAC64 — DEFENSE ELECTRONICS AND COMMUNICATION EQUIPMENT - ENGINEERING DEVELOPMENT
Parent award / vehicleHQ072716D0006
Set-asideNot reported
Pricing typeCOST PLUS FIXED FEE
Obligations$37.8M
Current contract value$37.8M
Potential contract value / ceiling$37.8M
Start dateSep 20, 2017
Current end dateApr 30, 2022
Potential end dateApr 30, 2022
Latest award activityJul 21, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 1 of 1 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 21, 2025A00001$-358.8KENGINEERING SERVICES, CET 17-788, E-4B ADVANCED EXTREMELY HIGH FREQUENCY (AEHF) INTEGRATION, PHASE 2 (E-4B INTEGRATION PHASE 2). THE PURPOSE OF THIS TASK IS TO DEVELOP AN INTEGRATED SOLUTION FOR FAB-T AND PNVC CAPABILITY INCLUDING HARDWARE AND SOFTWARE DESIGN ON THE E-4B PLATFORM INCLUDING CORRESPONDING TIME CHANGE TECHNICAL ORDERS (TCTOS), MODIFICATION KIT DEVELOPMENT, AND PROTOTYPE AIRCRAFT INSTALLATION.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.