Federal contract award
HQ085022C0007
SDA TRANCHE 1 OPERATIONS AND INTEGRATION
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | FA2401 SPACE DEVELOPMENT AGENCY SDA |
| NAICS | 541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) |
| PSC | AC33 — NATIONAL DEFENSE R&D SERVICES; DEFENSE-RELATED ACTIVITIES; EXPERIMENTAL DEVELOPMENT |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS AWARD FEE |
| Obligations | $1.1B |
| Current contract value | $1.1B |
| Potential contract value / ceiling | $1.2B |
| Start date | May 26, 2022 |
| Current end date | Sep 30, 2029 |
| Potential end date | Sep 30, 2029 |
| Latest award activity | Jun 1, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 71 of 71 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 1, 2026 | PZ0070 | $61.7M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Apr 27, 2026 | P00069 | $6.8M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Apr 14, 2026 | P00068 | $5.7M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Mar 20, 2026 | PZ0067 | $0 | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Mar 5, 2026 | PZ0066 | $5.0M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Jan 30, 2026 | PZ0065 | $108.4M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Jan 13, 2026 | P00064 | $22.5K | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Dec 18, 2025 | P00063 | $48.8M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Dec 8, 2025 | P00062 | $9.6M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Sep 29, 2025 | P00061 | $13.6M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Sep 24, 2025 | P00060 | $15.9M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Sep 5, 2025 | P00059 | $1.5M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Aug 25, 2025 | P00058 | $12.2M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Aug 15, 2025 | P00057 | $8.8M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Jul 30, 2025 | P00056 | $229.9K | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Jul 22, 2025 | P00055 | $71.1M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Jul 18, 2025 | P00054 | $8.8M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Jul 17, 2025 | P00053 | $738.7K | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| May 29, 2025 | P00052 | $5.5M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| May 7, 2025 | PZ0051 | $6.5M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Mar 27, 2025 | P00050 | $0 | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Mar 25, 2025 | P00049 | $24.8M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Mar 14, 2025 | P00048 | $22.8M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Feb 6, 2025 | P00047 | $800.0K | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Jan 31, 2025 | P00046 | $1.8M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Jan 15, 2025 | P00045 | $1.5M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Dec 18, 2024 | P00044 | $117.4M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Nov 13, 2024 | P00043 | $2.8M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Nov 8, 2024 | P00042 | $51.8M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Oct 2, 2024 | P00041 | $0 | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Sep 25, 2024 | P00040 | $42.6M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Aug 30, 2024 | PZ0039 | $39.4M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Aug 19, 2024 | P00038 | $11.4M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Jul 26, 2024 | P00037 | $0 | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Jul 25, 2024 | P00036 | $15.7M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Jul 10, 2024 | PZ0035 | $822.0K | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Jun 18, 2024 | P00034 | $9.6M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| May 28, 2024 | P00033 | $28.7M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| May 1, 2024 | P00032 | $8.5M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Apr 17, 2024 | P00031 | $887.0K | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Apr 15, 2024 | P00030 | $579.2K | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Mar 27, 2024 | P00029 | $11.7M | THE CONTRACTOR SHALL FURNISH THE NECESSARY LABOR AND MATERIALS, INCLUDING ANY REQUIRED FACILITIES, AND SUPPORT REQUIRED TO PERFORM THE EFFORT IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK, ATTACHMENT 1, AND THE DOCUMENTS IDENTIFIED IN SECTION J. |
| Mar 15, 2024 | P00028 | $12.0M | SDA TRANCHE 1 OPERATIONS AND INTEGRATION |
| Mar 4, 2024 | P00027 | $0 | T1DES DESCOPE |
| Jan 29, 2024 | P00026 | $37.4M | PROLIFERATED WARFIGHTER SPACE ARCHITECTURE (PWSA) GROUND MANAGEMENT AND INTEGRATION (GMI) |
| Jan 18, 2024 | P00025 | $14.0M | SDA TRANCHE 1 OPERATIONS AND INTEGRATION |
| Nov 28, 2023 | P00024 | $2.4M | SDA TRANCHE 1 OPERATIONS ON INTEGRATION |
| Nov 2, 2023 | PZ0023 | $2.9M | SDA TRANCHE 1 OPERATIONS AND INTEGRATION |
| Oct 16, 2023 | P00022 | $2.6M | SDA TRANCHE 1 OPERATIONS AND INTEGRATION |
| Oct 6, 2023 | P00021 | $4.0M | SDA TRANCHE 1 OPERATIONS AND INTEGRATION |
| Sep 29, 2023 | P00020 | $20.6M | INCREMENTAL FUNDING + ODC CEILING INCREASE |
| Sep 13, 2023 | P00019 | $5.5M | GEP 737 AND T2 ICD STUDY |
| Jul 27, 2023 | P00018 | $19.1M | SDA TRANCHE 1 OPERATIONS AND INTEGRATION |
| Jun 30, 2023 | P00017 | $8.2M | SDA TRANCHE 1 OPERATIONS AND INTEGRATION |
| May 31, 2023 | P00016 | $11.7M | GROUND ENTRY POINTS (GEPS) DEVELOPMENT. COMMENCE WORK UNDEFINITIZED UNDER ESTABLISHED NTE. |
| Apr 20, 2023 | P00015 | $28.8M | T1 O&I FUNDING INCREASE. |
| Apr 12, 2023 | PZ0014 | $0 | DEFINITIZE UNPRICED CHANGE ORDER ISSUED VIA P00008. |
| Mar 21, 2023 | P00013 | $272.5K | NORWAY GROUND ENTRY POINT (GEP) TRADE STUDY |
| Mar 1, 2023 | P00012 | $2.5M | TRANCHE 1 OPERATIONS AND INTEGRATION |
| Feb 9, 2023 | P00011 | $31.8M | INCREASE FUNDING |
| Feb 3, 2023 | P00010 | $0 | CEILING INCREASE AND POP EXTENSION. |
| Jan 12, 2023 | P00009 | $6.0M | TRANSFER PMO SCOPE FROM CLIN 0018 TO 0001. REVISE ATTACHMENT 9 - AWARD FEE PLAN. INCREMENTALLY FUND $6M. |
| Dec 13, 2022 | P00008 | $10.0M | CONSTELLATION WIDE TRACKING DATA FUSION DEVELOPMENT. COMMENCE WORK UNDEFINITIZED UNDER ESTABLISHED NTE. |
| Nov 17, 2022 | P00007 | $0 | DEVELOPMENT AND INTEGRATION CLINS 0001 AND 0018 FUNDING REALIGNMENT |
| Nov 1, 2022 | P00006 | $8.0M | SDA T1 O&I DEVELOPMENT AND INTEGRATION |
| Sep 26, 2022 | P00005 | $634.3K | CLIN 0023 CONSTELLATION WIDE TRACKING DATA FUSION TRADE STUDY |
| Sep 9, 2022 | P00004 | $0 | REVISE AWARD FEE PLAN AT NO ADDITIONAL COST TO THE GOVERNMENT. |
| Sep 6, 2022 | P00003 | $399.2K | CLIN 0023 DIRECTED TRADE STUDIES - SSC MEO TRACK CUSTODY |
| Aug 5, 2022 | P00002 | $3.8M | EXERCISE OPTION CLINS 0006, 0011, 0012 AND 0017 AND COMBINE THEM TO CLINS 0001 AND 0024. |
| Jul 22, 2022 | P00001 | $4.0M | MODIFICATION TO PROVIDE INCREMENTAL FUNDING TO CLIN 0023 AND REVISE ATTACHMENTS 6, 7 AND 9 AT NO ADDITIONAL COST TO THE GOVERNMENT. |
| May 26, 2022 | 0 | $28.1M | SDA TRANCHE 1 OPERATIONS AND INTEGRATION |
Estimated positioning window
Sep 30, 2028 – Mar 30, 2029
55/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 55/100. Available recorded signals: 50 points.
- Contract end 2029-09-30 (1064 days from calculation)
- +15 points
- 3 historical awards in this buyer and category group
- +10 points
- 71 recorded award transactions
- +10 points
- Latest award action: 2026-06-01
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Buyer contacts from matching notices
Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.
| Contact | Role | Published contact methods | Evidence | Source date |
|---|---|---|---|---|
| osd.pentagon.ousd-r-e.mbx.hq085022r0002@mail.mil | Contact | osd.pentagon.ousd-r-e.mbx.hq085022r0002@mail.mil | Source | Feb 22, 2022 |
| osd.pentagon.ousd-r-e.mbx.hq085022r0002@mail.mil | Contact | osd.pentagon.ousd-r-e.mbx.hq085022r0002@mail.mil | Source | Feb 2, 2022 |
| osd.pentagon.ousd-r-e.mbx.hq085022r0002@mail.mil | Contact | osd.pentagon.ousd-r-e.mbx.hq085022r0002@mail.mil | Source | Jan 28, 2022 |
| osd.pentagon.ousd-r-e.mbx.hq085022r0002@mail.mil | Contact | osd.pentagon.ousd-r-e.mbx.hq085022r0002@mail.mil | Source | Jan 18, 2022 |
| osd.pentagon.ousd-r-e.mbx.hq085022r0002@mail.mil | Contact | osd.pentagon.ousd-r-e.mbx.hq085022r0002@mail.mil | Source | Jan 3, 2022 |
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.