Federal contract award

HR001117C0090

IGF::OT::IGF LOCKHEED MARTIN CHIPS PHASE 1. THE ASIP TECHNICAL APPROACH IS A THREE-PHASE PROGRAM THAT DEMONSTRATES TWO PRIMARY OBJECTIVES; (1) THE ABILITY OF THE CHIPLET DESIGN APPROACH TO MEET THE CHIPS GOALS OF A MODULAR DESIGN AND FABRICATION FLOW USING OPEN STANDARDS ACHIEVING A LOWER COST, LOWER RISK, SHORTER SCHEDULE , AND LOWER COMPLEXITY SOLUTION TO IC DESIGN, AND (2) THE ABILITY OF THE FUNCTIONAL AND PHYSICAL INTERFACES TO SUPPORT A VARIETY OF SYSTEMS SUBDIVIDED INTO FUNCTIONAL CIRCUIT BLOCKS OR CHIPLETS, SUFFICIENT INTERCONNECT DENSITY IS AVAILABLE, THE INTERCONNECT BANDWIDTHS ARE SCALABLE, THE ENERGY EFFICIENCY SUPPORTS LOW POWER CONNECTIVITY, LATENCIES ARE SUFFICIENTLY LOW, AND OVERALL FLEXIBILITY AND SCALABILITY IS PROVIDED FOR A VARIETY OF APPLICATIONS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeDCMA CONTRACT LIFECYCLE MGMT
NAICS541712
PSCAD92 — OTHER DEFENSE - APPLIED RESEARCH/EXPLORATORY DEVELOPMENT
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeCOST PLUS FIXED FEE
Obligations$4.0M
Current contract value$4.9M
Potential contract value / ceiling$12.7M
Start dateAug 22, 2017
Current end dateDec 31, 2019
Potential end dateDec 31, 2019
Latest award activityAug 9, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 1 of 1 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 9, 2025A00001$0UNDEFINITIZED ORDER

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.