IGF::OT::IGF LOCKHEED MARTIN CHIPS PHASE 1. THE ASIP TECHNICAL APPROACH IS A THREE-PHASE PROGRAM THAT DEMONSTRATES TWO PRIMARY OBJECTIVES; (1) THE ABILITY OF THE CHIPLET DESIGN APPROACH TO MEET THE CHIPS GOALS OF A MODULAR DESIGN AND FABRICATION FLOW USING OPEN STANDARDS ACHIEVING A LOWER COST, LOWER RISK, SHORTER SCHEDULE , AND LOWER COMPLEXITY SOLUTION TO IC DESIGN, AND (2) THE ABILITY OF THE FUNCTIONAL AND PHYSICAL INTERFACES TO SUPPORT A VARIETY OF SYSTEMS SUBDIVIDED INTO FUNCTIONAL CIRCUIT BLOCKS OR CHIPLETS, SUFFICIENT INTERCONNECT DENSITY IS AVAILABLE, THE INTERCONNECT BANDWIDTHS ARE SCALABLE, THE ENERGY EFFICIENCY SUPPORTS LOW POWER CONNECTIVITY, LATENCIES ARE SUFFICIENTLY LOW, AND OVERALL FLEXIBILITY AND SCALABILITY IS PROVIDED FOR A VARIETY OF APPLICATIONS.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | DCMA CONTRACT LIFECYCLE MGMT |
| NAICS | 541712 |
| PSC | AD92 — OTHER DEFENSE - APPLIED RESEARCH/EXPLORATORY DEVELOPMENT |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $4.0M |
| Current contract value | $4.9M |
| Potential contract value / ceiling | $12.7M |
| Start date | Aug 22, 2017 |
| Current end date | Dec 31, 2019 |
| Potential end date | Dec 31, 2019 |
| Latest award activity | Aug 9, 2025 |
| Source loaded | Aug 15, 2026 |
Funding and modification history
Showing the latest 1 of 1 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 9, 2025 | A00001 | $0 | UNDEFINITIZED ORDER |
Research next steps