Federal contract award
HR001119C0006
THE MGM PROGRAM AIMS TO BRIDGE THE GAP FROM PROTOTYPING CAPABILITY TO VALIDATING PRODUCTION CAPABILITY, INCLUDING CYCLE TIME REDUCTION, YIELD IMPROVEMENTS, AND BOTTLENECK ALLEVIATION; DEVELOPMENT OF METAL-EMBEDDED CHIP ASSEMBLY FOR MICROWAVE INTEGRATED CIRCUITS (MECAMIC), A FOUNDATIONAL MANUFACTURING PLATFORM FOR RAPID TURN-AROUND, LOW-COST RF IC FABRICATION; AND A TRANSITION ACCELERATION STUDY, INCLUDING BUSINESS PLAN AND ROADMAP DEVELOPMENT.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | DCMA SOUTHERN CALIFORNIA |
| NAICS | 541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) |
| PSC | AD93 — OTHER DEFENSE - ADVANCED DEVELOPMENT |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $18.7M |
| Current contract value | $18.8M |
| Potential contract value / ceiling | $18.8M |
| Start date | Oct 29, 2018 |
| Current end date | Dec 23, 2022 |
| Potential end date | Dec 23, 2022 |
| Latest award activity | May 28, 2025 |
| Source loaded | Aug 15, 2026 |
Funding and modification history
Showing the latest 2 of 2 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 28, 2025 | A00002 | $-55.5K | UNDEFINITIZED ORDER |
| May 5, 2025 | A00001 | $-57.4K | UNDEFINITIZED ORDER |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.