Federal contract award
HSCG2316CAFR625
THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Homeland Security |
| Office | HQ CONTRACT OPERATIONS (CG-912)(000 |
| NAICS | 336611 — Ship Building and Repairing |
| PSC | 1905 — Combat Ships and Landing Vessels |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIXED PRICE WITH ECONOMIC PRICE ADJUSTMENT |
| Obligations | $2.1B |
| Current contract value | $2.1B |
| Potential contract value / ceiling | $2.2B |
| Start date | May 4, 2016 |
| Current end date | Jul 31, 2026 |
| Potential end date | Mar 23, 2028 |
| Latest award activity | Aug 5, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 75 of 75 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 5, 2026 | A00091 | $13.7M | THIS BILATERAL MODIFICATION OBLIGATES CALENDAR YEAR 2026 SECOND QUARTER ECONOMIC PRICE ADJUSTMENT REQUIRED UNDER H.9 OF CONTRACT HSCG23-16-C-AFR625. |
| Jul 23, 2026 | A00090 | $0 | THIS BILATERAL MODIFICATION INCORPORATES AN EXTENSION OF THE CONTRACTUAL DELIVERY DATE FOR FRC 1163, USCGC JEFFREY PALAZZO, AS DETAILED IN SECTION F.5, "TIME OF DELIVERY", DUE TO THE MAJOR DEFECTS OF THE SUPERSTRUCTURE WITH GALVANIC CORROSION DAMAGE. THESE CHANGES ARE IMPLEMENTED IN PART I, SECTION F, AT NO COST IN EXCHANGE FOR THE ITEMS OF CONSIDERATION FOR THE DELIVERY OF FRCS 1162, 1163, 1164, 1166, 1167, 1168, 1169, & 1170 PRESCRIBED AND DETAILED HEREIN AS APPLICABLE. THERE IS NO FURTHER DISRUPTION, CUMULATIVE DISRUPTION OR ANY DELAYS OR ANY OTHER COSTS OR CLAIMS ASSOCIATED WITH THE EXECUTION OF THIS BILATERAL MODIFICATION. |
| Feb 25, 2026 | A00087 | $35.9M | THIS BILATERAL MODIFICATION OBLIGATES FUNDS FOR ECONOMIC PRICE ADJUSTMENT INVOICE FRCEPA033. |
| Dec 9, 2025 | A00086 | $12.6M | THIS BILATERAL MODIFICATION OBLIGATES FUNDS FOR ECONOMIC PRICE ADJUSTMENT INVOICE FRCIIEPA032. FUNDS ARE OBLIGATED TO CLINS 40001G, 50001G, 50002G, 60002G, 60003G AND 70001G. |
| Aug 19, 2025 | A00084 | $7.4M | BILATERAL MODIFICATION OBLIGATES FUNDING PRIOR TO PAYMENT OF ECONOMIC PRICE ADJUSTMENT INVOICES 031 AND 032. |
| Aug 6, 2025 | A00083 | $0 | MODIFICATION INCREASES MAXIMUM CEILING QUANTITY FROM 39 TO 47 FAST RESPONSE CUTTERS. MODIFICATION ALSO UPDATED SECTION B.2.2 AS WELL AS REQUIREMENTS IN COR SECTION 400. |
| May 6, 2025 | A00081 | $0 | BILATERAL MODIFICATION EXTENDS OPTION PERIOD SEVEN FROM 04 MAY 2025 TO 30 SEPTEMBER 2025. MODIFICATION ALSO INCLUDES THE INCORPORATION OF FAR CLAUSE 52.225-8 ENTITLED "DUTY-FREE ENTRY" TO SECTION I. |
| Mar 6, 2025 | A00079 | $0 | EXCUSABLE DELAY OF 14 DAYS FOR THE DELIVERY OF FRC 1158 DUE TO HURRICANE FRANCINE. FAST RESPONSE CUTTER CONTRACT |
| Mar 6, 2025 | A00080 | $7.3M | BILATERAL MODIFICATION TO ADD FUNDS FOR ECONOMIC PRICE ADJUSTMENT 029 TO THE FAST RESPONSE CUTTER CONTRACT. DHS ACQUISITION ALERT 25-07 REV 1 SECTION 2 D CERTIFICATION APPLIES. |
| Mar 6, 2025 | A00082 | $6.9M | BILATERAL MODIFICATION TO ADD FUNDS FOR ECONOMIC PRICE ADJUSTMENT 030 TO THE FAST RESPONSE CUTTER CONTRACT. |
| Mar 5, 2025 | A00078 | $0 | ADMINISTRATIVE MODIFICATION TO CLOSE OUT CLIN 10001D SUPPLY SUPPORT. |
| Jan 6, 2025 | A00077 | $9.4M | BILATERAL MODIFICATION TO ADD FUNDS |
| Sep 5, 2024 | A00076 | $7.3M | BILATERAL MODIFICATION TO ADD FUNDS |
| Aug 19, 2024 | A00075 | $1.9M | BILATERAL MODIFICATION TO ADD FUNDS |
| Nov 29, 2023 | A00068 | $677.0K | BILATERAL MODIFICATION TO ADD FUNDS |
| Nov 21, 2023 | A00067 | $9.5M | BILATERAL MODIFICATION TO ADD FUNDS |
| Dec 21, 2022 | A00057 | $1.7M | BILATERAL MODIFICATION TO ADD FUNDS |
| Dec 21, 2022 | A00069 | $0 | BILATERAL MODIFICATION TO EXTEND HULL 1156'S DELIVERY DATE |
| Dec 21, 2022 | A00070 | $8.2M | BILATERAL MODIFICATION TO ADD FUNDS FOR EPA 025 |
| Dec 21, 2022 | A00071 | $0 | BILATERAL MODIFICATION TO INCREASE MAXIMUM CEILING QUANTITY FROM 33 TO 35, AND MODIFIES THE DELIVERY DATES FOR FRC 1159 - 1165. |
| Dec 21, 2022 | A00072 | $113.1M | BILATERAL MODIFICATION TO ADD FUNDS |
| Dec 21, 2022 | A00073 | $6.2M | BILATERAL MODIFICATION TO ADD FUNDS |
| Dec 21, 2022 | A00074 | $650.0K | BILATERAL MODIFICATION TO ADD FUNDS |
| Dec 7, 2022 | A00056 | $10.5M | BILATERAL MODIFICATION TO ADD FUNDS |
| Dec 6, 2022 | A00055 | $0 | BILATERAL MODIFICATION TO ADD FUNDS |
| Sep 20, 2022 | A00054 | $14.6M | BILATERAL MODIFICATION TO ADD FUNDS |
| Sep 8, 2022 | A00053 | $481.4K | BILATERAL MODIFICATION TO ADD FUNDS |
| Aug 25, 2022 | A00052 | $23.8M | BILATERAL MODIFICATION TO ADD FUNDS |
| Aug 9, 2022 | A00051 | $55.5M | BILATERAL MODIFICATION TO ADD FUNDS |
| Aug 5, 2022 | A00049 | $0 | BILATERAL MODIFICATION TO ADD FUNDS |
| Mar 21, 2022 | A00048 | $29.7M | BILATERAL MODIFICATION TO ADD FUNDS |
| Sep 12, 2021 | A00047 | $8.3M | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Sep 10, 2021 | A00046 | $3.6M | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Aug 4, 2021 | A00044 | $212.9M | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Jul 7, 2021 | A00043 | $0 | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| May 11, 2021 | A00042 | $5.0M | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Apr 22, 2021 | A00041 | $2.8M | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Mar 2, 2021 | A00040 | $-132.7K | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Feb 10, 2021 | A00039 | $200.0K | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Jan 4, 2021 | A00038 | $7.5M | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Dec 7, 2020 | A00036 | $39.4K | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Oct 8, 2020 | A00035 | $0 | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Sep 22, 2020 | A00033 | $0 | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Sep 22, 2020 | A00034 | $222.0M | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Sep 16, 2020 | A00032 | $2.0M | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Sep 9, 2020 | A00031 | $-4.4M | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Aug 24, 2020 | A00030 | $0 | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Aug 11, 2020 | A00029 | $846.5K | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Aug 5, 2020 | A00028 | $3.7M | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Jun 26, 2020 | A00027 | $7.8M | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| May 3, 2020 | A00025 | $902.0K | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Apr 10, 2020 | A00024 | $1.6M | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Feb 12, 2020 | A00023 | $867.7K | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Oct 23, 2019 | A00022 | $1.3M | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Sep 11, 2019 | A00020 | $148.7K | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Aug 28, 2019 | A00019 | $2.6M | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Jul 31, 2019 | A00018 | $297.5M | THIS UNILATERAL MODIFICATION EXERCISES OPTION PERIOD THREE FOR SIX FAST RESPONSE CUTTERS AND ASSOCIATED LINE ITEMS AND ONE LOT OF SYSTEM STOCK. |
| Jun 12, 2019 | A00017 | $1.7M | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Apr 23, 2019 | A00016 | $0 | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Apr 10, 2019 | A00015 | $-2.6M | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Mar 20, 2019 | A00014 | $849.0K | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Feb 21, 2019 | A00013 | $3.5M | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Dec 13, 2018 | A00012 | $1.9M | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Nov 14, 2018 | A00011 | $245.5K | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Oct 3, 2018 | A00010 | $68.8K | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Sep 18, 2018 | A00009 | $1.2M | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Aug 9, 2018 | A00008 | $294.5M | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Jun 7, 2018 | A00007 | $430.0K | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Jun 6, 2018 | A00006 | $1.3M | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Nov 16, 2017 | A00005 | $759.5K | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Jun 8, 2017 | A00004 | $289.0M | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH ECONOMIC PRICE ADJUSTMENT. |
| Mar 9, 2017 | A00003 | $0 | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| Sep 27, 2016 | A00002 | $23.9M | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). |
| Aug 10, 2016 | A00001 | $0 | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
| May 4, 2016 | 0 | $318.6M | THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS. |
Estimated positioning window
Mar 23, 2027 – Sep 23, 2027
70/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 70/100. Available recorded signals: 65 points.
- Contract end 2028-03-23 (515 days from calculation)
- +25 points
- 9 historical awards in this buyer and category group
- +15 points
- 75 recorded award transactions
- +10 points
- Latest award action: 2026-08-05
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Buyer contacts from matching notices
Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.
| Contact | Role | Published contact methods | Evidence | Source date |
|---|---|---|---|---|
| Erica E. Fetter | Contracting Officer | Erica.Fetter@uscg.mil | Source | Jul 21, 2015 |
| Ryan J. Buck | Contract Specialist | ryan.j.buck@uscg.mil | Source | Jul 21, 2015 |
| Erica E. Fetter | Contracting Officer | Erica.Fetter@uscg.mil | Source | Jul 17, 2015 |
| Ryan J. Buck | Contract Specialist | ryan.j.buck@uscg.mil | Source | Jul 17, 2015 |
| Erica E. Fetter | Contracting Officer | Erica.Fetter@uscg.mil | Source | Jun 30, 2015 |
| Ryan J. Buck | Contract Specialist | ryan.j.buck@uscg.mil | Source | Jun 30, 2015 |
| Erica E. Fetter | Contracting Officer | Erica.Fetter@uscg.mil | Source | Jun 22, 2015 |
| Ryan J. Buck | Contract Specialist | ryan.j.buck@uscg.mil | Source | Jun 22, 2015 |
| Erica E. Fetter | Contracting Officer | Erica.Fetter@uscg.mil | Source | Jun 9, 2015 |
| Ryan J. Buck | Contract Specialist | ryan.j.buck@uscg.mil | Source | Jun 9, 2015 |
| Erica E. Fetter | Contracting Officer | Erica.Fetter@uscg.mil | Source | Jun 2, 2015 |
| Ryan J. Buck | Contract Specialist | ryan.j.buck@uscg.mil | Source | Jun 2, 2015 |
| Erica E. Fetter | Contracting Officer | Erica.Fetter@uscg.mil | Source | May 21, 2015 |
| Ryan J. Buck | Contract Specialist | ryan.j.buck@uscg.mil | Source | May 21, 2015 |
| Erica E. Fetter | Contracting Officer | Erica.Fetter@uscg.mil | Source | May 18, 2015 |
| Ryan J. Buck | Contract Specialist | ryan.j.buck@uscg.mil | Source | May 18, 2015 |
| Erica E. Fetter | Contracting Officer | Erica.Fetter@uscg.mil | Source | May 14, 2015 |
| Ryan J. Buck | Contract Specialist | ryan.j.buck@uscg.mil | Source | May 14, 2015 |
| Erica E. Fetter | Contracting Officer | Erica.Fetter@uscg.mil | Source | May 8, 2015 |
| Ryan J. Buck | Contract Specialist | ryan.j.buck@uscg.mil | Source | May 8, 2015 |
| Erica E. Fetter | Contracting Officer | Erica.Fetter@uscg.mil | Source | May 4, 2015 |
| Ryan J. Buck | Contract Specialist | ryan.j.buck@uscg.mil | Source | May 4, 2015 |
| Erica E. Fetter | Contracting Officer | Erica.Fetter@uscg.mil | Source | Apr 21, 2015 |
| Ryan J. Buck | Contract Specialist | ryan.j.buck@uscg.mil | Source | Apr 21, 2015 |
| Erica E. Fetter | Contracting Officer | Erica.Fetter@uscg.mil | Source | Apr 10, 2015 |
| Ryan J. Buck | Contract Specialist | ryan.j.buck@uscg.mil | Source | Apr 10, 2015 |
| Erica E. Fetter | Contracting Officer | Erica.Fetter@uscg.mil | Source | Apr 2, 2015 |
| Ryan J. Buck | Contract Specialist | ryan.j.buck@uscg.mil | Source | Apr 2, 2015 |
| Erica E. Fetter | Contracting Officer | Erica.Fetter@uscg.mil | Source | Mar 27, 2015 |
| Ryan J. Buck | Contract Specialist | ryan.j.buck@uscg.mil | Source | Mar 27, 2015 |
| Erica E. Fetter | Contracting Officer | Erica.Fetter@uscg.mil | Source | Mar 19, 2015 |
| Ryan J. Buck | Contract Specialist | ryan.j.buck@uscg.mil | Source | Mar 19, 2015 |
| Erica E. Fetter | Contracting Officer | Erica.Fetter@uscg.mil | Source | Mar 4, 2015 |
| Ryan J. Buck | Contract Specialist | ryan.j.buck@uscg.mil | Source | Mar 4, 2015 |
| Erica E. Fetter | Contracting Officer | Erica.Fetter@uscg.mil | Source | Feb 27, 2015 |
| Ryan J. Buck | Contract Specialist | ryan.j.buck@uscg.mil | Source | Feb 27, 2015 |
| Erica E. Fetter | Contracting Officer | Erica.Fetter@uscg.mil | Source | Feb 5, 2015 |
| Ryan J. Buck | Contract Specialist | ryan.j.buck@uscg.mil | Source | Feb 5, 2015 |
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Verify whether remaining options may extend performance beyond the current end date.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.