Federal contract award

HTC71122CR002

SCHEDULED AND PREVENTATIVE MAINTENANCE

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeUSTRANSCOM-AQ
NAICS811310 — Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
PSC3950 — Winches, Hoists, Cranes, and Derricks
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$11.2M
Current contract value$12.3M
Potential contract value / ceiling$12.8M
Start dateMay 24, 2022
Current end dateJul 8, 2026
Potential end dateJan 8, 2028
Latest award activityJun 9, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 157 of 157 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 11, 2026P00156$10.2KMOTSU MS107 INITIAL QUOTE AND TRANSPORTATION OF THE GENERATOR STATOR ASSEMBLY
Jun 9, 2026P00155$128.3KMOTSU MS106 OSHA CERTIFIED 20FT SAFETY CAGES
Jun 4, 2026P00154$2.3KNMII II018 CABLE WINCHES
May 21, 2026P00153$94.8KMOTSU MS103 NIDEC ANNUAL SERVICE CONTRACT FOR 2026-2027
May 19, 2026P00152$25.2KMOTCO MC033 CRANE 1 480 BREAKER
May 14, 2026P00151$125.9KNMII II017 NIDEC CM-HMI UPGRADE FOR BIG BLUE
May 5, 2026P00150$0INCORPORATE FAR CLAUSE 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS.
Apr 28, 2026P00149$29.5KMOTCO MS105 DOOSAN 2 GENERATOR REAR MAIN SEAL
Apr 24, 2026P00148$5.9KMOTSU MS104 MOTSU KONE TROLLEY BUMPER STOPS
Apr 23, 2026P00147$0CORRECT LOA (97X4930 FD30 6 E3 35 1101 TTTPR000000 4600 2571 W90GA926691680 389900) FOR P00143, CLIN 3003-14.
Apr 17, 2026P00146$142.3KMOTSU MS101 DOOSAN 2 SPREADER BAR PLC COMPONENTS REPLACEMENT
Apr 13, 2026P00145$49.2KMOTSU MS101 DOOSAN 2 SPREADER BAR PLC COMPONENTS REPLACEMENT
Apr 9, 2026P00144$2.1KMOTSU MS100 DOOSAN 1 AND DOOSAN 2 AIR FILTER REPLACEMENT
Apr 7, 2026P00143$25.1KMOTSU MS099 KONE FIXED SIDE GANTRY GEARBOX
Mar 25, 2026P00142$59.2KMOTSU MS099 KONE FIXED SIDE GANTRY GEARBOX
Mar 17, 2026P00141$0EXTEND THE PERIOD OF PERFORMANCE FOR CLIN 2003 FROM 8 JULY 2025 TO 28 FEBRUARY 2026.
Mar 12, 2026P00140$74.5KNMII II016 BIG BLUE LIFECYCLE SURVEY
Mar 3, 2026P00138$234MOTCO MC031 CRANE 1 HYDRAULIC HOSE
Mar 3, 2026P00139$2.4KMOTCO MC031 CRANE 1 HYDRAULIC HOSE
Feb 4, 2026P00137$2.1KMOTCO MC030 CRANE 2 APC SMART UPS BOXES
Feb 3, 2026P00136$2.0KMOTCO MC030 CRANE 2 APC SMART UPS BOXES
Jan 21, 2026P00134$3.4KMOTCO MC029 CRANE 1 APC SMART UPS BOXES
Jan 21, 2026P00135$3.4KMOTCO MC030 CRANE 2 APC SMART UPS BOXES
Jan 9, 2026P00133$13.5KMOTSU MS094 APC SMART UPS BOXES
Jan 8, 2026P00131$4.2KMOTSU MS092 KONE GANTRY ELECTRIC MOTOR REBUILD
Jan 8, 2026P00132$2.9KMOTSU MS092 KONE GANTRY ELECTRIC MOTOR REBUILD
Jan 5, 2026P00130$4.0KMOTCO MC026 BRIDGE ASSEMBLIES
Nov 28, 2025P00129$132.3KMOTCO MC026 BRIDGE ASSEMBLIES
Nov 25, 2025P00128$132.3KMOTCO MC026 BRIDGE ASSEMBLIES
Nov 18, 2025P00127$47.6KMOTCO MC026 BRIDGE ASSEMBLIES
Nov 7, 2025P00125$926MOTSU MS090 DOOSAN 1 E CARD
Nov 7, 2025P00126$131.4KMOTSU MS091 NIDEC HMI UPGRADES AT MOTSU - DOOSAN CRANES
Oct 21, 2025P00124$12.1KMOTSU MS089 DOOSAN 2 SPREADER REEL DRIVE
Oct 9, 2025P00123$3.1KMOTCO MC025 SCR MODULES
Oct 3, 2025P00122$4.7KMOTCO MC024 1400 AMP FUSE
Sep 30, 2025P00121$1.8KMS078 - DOOSAN 1 E CARDS REPLACEMENT MS079 - DOOSAN 2 E CARDS REPLACEMENTMC023 - FILTERS
Sep 24, 2025P00120$94.7KMS084 UPGRADE THE EMCPS ON DOOSAN 1 AND DOOSAN 2 MS085 SPREADER BAR 1 HYDRAULIC HOSE UPGRADEMS086 SPREADER BAR 2 HYDRAULIC HOSE UPGRADEMS087 SPREADER BAR 3 HYDRAULIC HOSE UPGRADEMS088 DOOSAN 1 AND 2 BOOM BUMPER STOPS
Sep 9, 2025P00119$0CORRECT WAGE DETERMINATION AT MOTSU FOR OP3
Sep 5, 2025P00118$100.6KNMII II015 ELEVATOR REPAIR
Aug 8, 2025P00116$1.2KMOTSU MS080 DOOSAN 2 MAIN GENERATOR ALTERNATOR REPLACEMENT
Aug 8, 2025P00117$824MOTCO MC022 VARIOUS LIGHT BULBS FOR CRANES
Aug 7, 2025P00114$1.4KMOTSU MS081 GENERATOR TROUBLESHOOT DOOSAN 2
Aug 7, 2025P00115$8.4KMOTSU MS082 DOOSAN 2 BAD VOLTAGE REGULATOR
Aug 6, 2025P00113$3.6KII014 ELEVATOR REPAIR ASSESSMENT
Aug 5, 2025P00112$888MOTSU MS077 DOOSAN 2 CAB AC REPAIR
Jul 31, 2025P00111$1.2KMOTSU MS076 DOOSAN 1 GENERATOR SHUT DOWN ISSUE
Jul 29, 2025P00110$0CONTRACT TO PROVIDE MAINTENANCE SERVICES FOR SHIP-TO-SHORE AND GANTRY CRANES AT MILITARY OCEAN TERMINALS CONCORD AND SUNNY POINT AS WELL AS AT NAVAL MAGAZINE INDIAN ISLAND.
Jul 11, 2025P00109$0CONTRACT TO PROVIDE MAINTENANCE SERVICES FOR SHIP-TO-SHORE AND GANTRY CRANES AT MILITARY OCEAN TERMINALS CONCORD AND SUNNY POINT AS WELL AS AT NAVAL MAGAZINE INDIAN ISLAND.
Jul 3, 2025P00108$1.1MCONTRACT TO PROVIDE MAINTENANCE SERVICES FOR SHIP-TO-SHORE AND GANTRY CRANES AT MILITARY OCEAN TERMINALS CONCORD AND SUNNY POINT AS WELL AS AT NAVAL MAGAZINE INDIAN ISLAND.
Jul 2, 2025P00107$115.6KCONTRACT TO PROVIDE MAINTENANCE SERVICES FOR SHIP-TO-SHORE AND GANTRY CRANES AT MILITARY OCEAN TERMINALS CONCORD AND SUNNY POINT AS WELL AS AT NAVAL MAGAZINE INDIAN ISLAND.
Jun 27, 2025P00106$91.9KCONTRACT TO PROVIDE MAINTENANCE SERVICES FOR SHIP-TO-SHORE AND GANTRY CRANES AT MILITARY OCEAN TERMINALS CONCORD AND SUNNY POINT AS WELL AS AT NAVAL MAGAZINE INDIAN ISLAND.
Jun 26, 2025P00104$1.2KCONTRACT TO PROVIDE MAINTENANCE SERVICES FOR SHIP-TO-SHORE AND GANTRY CRANES AT MILITARY OCEAN TERMINALS CONCORD AND SUNNY POINT AS WELL AS AT NAVAL MAGAZINE INDIAN ISLAND.
Jun 26, 2025P00105$3.8KCONTRACT TO PROVIDE MAINTENANCE SERVICES FOR SHIP-TO-SHORE AND GANTRY CRANES AT MILITARY OCEAN TERMINALS CONCORD AND SUNNY POINT AS WELL AS AT NAVAL MAGAZINE INDIAN ISLAND.
Jun 25, 2025P00103$1.6KCONTRACT TO PROVIDE MAINTENANCE SERVICES FOR SHIP-TO-SHORE AND GANTRY CRANES AT MILITARY OCEAN TERMINALS CONCORD AND SUNNY POINT AS WELL AS AT NAVAL MAGAZINE INDIAN ISLAND.
Jun 23, 2025P00102$2.6KMOTSU MS068 RAM SPREADER BAR 2 POWER SUPPLY
Jun 17, 2025P00101$452MOTSU MS067 HOIST PUMP SOLENOID COIL
Jun 16, 2025P00100$660MOTCO MC019 FOUR HYDRAULIC HOSES
Jun 13, 2025P00099$2.6KCONTRACT TO PROVIDE MAINTENANCE SERVICES FOR SHIP-TO-SHORE AND GANTRY CRANES AT MILITARY OCEAN TERMINALS CONCORD AND SUNNY POINT AS WELL AS AT NAVAL MAGAZINE INDIAN ISLAND. MOTCO MC021 LOAD MONITORING UNIT WITH TWO SENSOR INPUT
Jun 12, 2025P00098$0CONTRACT TO PROVIDE MAINTENANCE SERVICES FOR SHIP-TO-SHORE AND GANTRY CRANES AT MILITARY OCEAN TERMINALS CONCORD AND SUNNY POINT AS WELL AS AT NAVAL MAGAZINE INDIAN ISLAND.
Apr 4, 2025P00097$296UNSCHEDULED MAINTENANCE - MOTSU MS066 CRANE STORM PREPARATION
Apr 3, 2025P00096$2.5KUNSCHEDULED MAINTENANCE - MOTSU MS061 STOKES BASKETS AND HARNESSES
Apr 2, 2025P00094$2.8KUNSCHEDULED MAINTENANCE - NMII II011 STOKES BASKETS AND HARNESSES
Apr 2, 2025P00095$2.7KUNSCHEDULED MAINTENANCE - MOTCO MC018 STOKES BASKETS AND HARNESSES
Apr 1, 2025P00093$4.4KUNSCHEDULED MAINTENANCE - MOTSU MS062 WIRE DRAW MECHANISM
Mar 31, 2025P00092$1.3KUNSCHEDULED MAINTENANCE - MOTSU MS064 DOOSAN 1 & 2 GENERATOR HOUSING FILTERS
Mar 26, 2025P00091$2.9KUNSCHEDULED MAINTENANCE - MOTSU MS065 FIRE EXTINGUISHERS (25 10LB AND TWO 20LB ABC EXTINGUISHERS)
Mar 25, 2025P00090$2.1KUNSCHEDULED MAINTENANCE - NMII II013 120V OUTPUT CARD AND ANALOG INPUT CARD
Mar 19, 2025P00089$0MAJOR PROJECTS
Feb 22, 2025P00088$14.9KMAJOR PROJECTS - MOTSU MS060 REPLACE THE ELEVATOR ROLLERS ON DOOSAN 1 & 2
Feb 20, 2025P00087$1.5KUNSCHEDULED MAINTENANCE - MOTCO MC017 FLOODLIGHT BALLASTS REPLACEMENT
Feb 19, 2025P00086$2.6KUNSCHEDULED MAINTENANCE - MOTCO MC016 HMI PC REPLACEMENT
Feb 13, 2025P00085$250.1KMAJOR PROJECTS - MOTSU MS011 PLC AND HMI UPGRADES FOR DOOSAN 1 AND 2
Jan 16, 2025P00084$5.6KUNSCHEDULED MAINTENANCE - MOTSU MS058 SSL ADDITION OF 2EA FLIPPERS ONE LEFT, ONE RIGHT AND A TURNBUCKLE
Jan 15, 2025P00083$5.9KUNSCHEDULED MAINTENANCE - MOTSU MS057 SPREADER BAR # 2, TURNBUCKLE AND 2 INSHORE FLIPPERS
Jan 10, 2025P00082$600UNSCHEDULED MAINTENANCE - MOTSU MS056 DOOSAN 1 EMERGENCY STOP BUTTON REPLACEMENT
Dec 23, 2024P00081$562UNSCHEDULED MAINTENANCE - MOTCO MC014 CRANE ELEVATOR DOOR SWITCH REPLACEMENT
Dec 19, 2024P00080$1.4KUNSCHEDULED MAINTENANCE - MOTSU MS055 DOOSAN 1 PROXIMITY SWITCH REPLACEMENT (6 EACH)
Nov 14, 2024P00079$231UNSCHEDULED MAINTENANCE - MOTCO MC013 REPLACE FLEXIBLE COLLAR TO THE HOIST ENCODER AND DRUM
Nov 12, 2024P00078$47.5KMAJOR PROJECTS - MOTSU MS043 UPGRADE FROM SCS2 TO SCS-MODULAR
Nov 6, 2024P00077$451UNSCHEDULED MAINTENANCE - MOTCO MC009 REPLACE TWO FAILED EMERGENCY EGRESS LIGHTING FIXTURES
Sep 25, 2024P00074$14.8KMAJOR PROJECTS - MOTSU MS040 REPLACE THE WHEEL BRAKE HYDRAULIC TANKS ON DOOSANS 1 AND 2
Sep 25, 2024P00075$2.6KUNSCHEDULED MAINTENANCE - MOTSU MS041 REPLACE TLS VALVES ON DOOSAN 2
Sep 25, 2024P00076$2.9KUNSCHEDULED MAINTENANCE - MOTSU MS042 REPAIR GANTRY MOTOR ON DOOSAN 1
Sep 24, 2024P00071$1.3KUNSCHEDULED MAINTENANCE - NMII II008 USE HEATGUN, WIPE DOWN, AND INSTALL DESSICANT CONTAINERS ON BIG BLUE ELECTRIC PANELS TO REDUCE MOISTURE DAMAGE (DUE TO LACK OF SHORE POWER)
Sep 24, 2024P00072$9.7KUNSCHEDULED MAINTENANCE - MOTSU MS035 REPLACE SPREADER BAR LIGHTS AND BUFFER PADS ON DOOSAN SPREADER BARS 1,2,AND 3
Sep 24, 2024P00073$2.0KUNSCHEDULED MAINTENANCE - MOTSU MS039 REPLACE SHORE POWER CONNECTORS FOR DOOSAN 1 AND 2
Sep 23, 2024P00069$290.2KMAJOR PROJECTS - MOTSU MS029 REPLACE ALL FOUR AIR CONDITIONERS ON ALL DOOSAN CRANES
Sep 23, 2024P00070$8.9KUNSCHEDULED MAINTENANCE - II007 GANTRY BRAKE REPAIRS FOR GANTRIES #4, 8, 11, AND 18
Sep 22, 2024P00067$3.0KUNSCHEDULED MAINTENANCE - MOTSU MS027 REPLACE SPREADER BAR #3 PLC CPU AND MEMORY CARD
Sep 22, 2024P00068$622UNSCHEDULED MAINTENANCE - MOTSU MS028 DOOSAN 1 E CARD REPLACEMENT
Sep 19, 2024P00066$558UNSCHEDULED MAINTENANCE - MOTSU MS026 REPLACE ELEVATOR CALL CIRCUIT BOARD FOR DOOSAN 2
Sep 18, 2024P00065$13.6KMAJOR PROJECTS - MOTSU MS025 REPLACE EMERGENCY HOIST BRAKE ASSEMBLY FOR DOOSAN 1
Sep 5, 2024P00064$2.1KUNSCHEDULED MAINTENANCE - MOTSU MS024 TEN PROXIMITY SWITCHES FOR SSL REPLENISHMENT
Aug 27, 2024P00063$1.6KUNSCHEDULED MAINTENANCE - MOTSU MS022 REPLACE 8EA TPS BALL VALVES ON DOOSAN 1
Aug 13, 2024P00062$3.9KUNSCHEDULED MAINTENANCE - MOTSU MS007 WIND MONITOR REPLACEMENT FOR ALL CRANES
Aug 9, 2024P00061$88.0KMAJOR PROJECTS - MOTSU MS023 NIDEC ANNUAL SUPPORT & SERVICE AGREEMENT
Jul 31, 2024P00060$3.5KUNSCHEDULED MAINTENANCE - MOTSU MS005 BROMMA BAR TECHNICAL INSPECTION
Jul 29, 2024P00059$2.5KUNSCHEDULED MAINTENANCE - NMII II006 REPLACE FOUR BATTERIES ON BIG BLUE
Jul 22, 2024P00058$0IMPLEMENTATION OF WAGE DETERMINATIONS 2015-5623, REVISION 23 2015-4435, REVISION 23 AND 2015-5545, REVISION 24.
Jul 1, 2024P00057$1.1MCRANE MAINTENANCE II - OPTION PERIOD TWO (2)
Jun 25, 2024P00056$1.3KUNSCHEDULED MAINTENANCE - MOTSU MS018 REPLACE WIRE DRAW MECHANISM ON THE SPREADER BAR FOR DOOSAN 2
Jun 20, 2024P00055$5.9KUNSCHEDULED MAINTENANCE - MOTSU MS019 REPLACE CHECKER CAB CC FOR DOOSAN 1
Jun 17, 2024P00054$4.7KUNSCHEDULED MAINTENANCE - MOTCO MC005 REPLACE CIRCUIT BREAKER TRIP UNIT FOR CRANE 1
Jun 13, 2024P00053$6.5KUNSCHEDULED MAINTENANCE - MOTSU MS021 REPLACE 3EA WHEEL BRAKE THRUSTERS FOR DOOSAN 2
Jun 4, 2024P00052$13.0KMAJOR PROJECTS - MOTCO MC003 REPLACE CABIN AIR CONDITIONER UNIT FOR CRANE 1
May 21, 2024P00051$2.3KUNSCHEDULED MAINTENANCE - MOTSU MS017 GENERATOR OIL BALL VALVE REPLACEMENT FOR DOOSAN 2
May 17, 2024P00050$452FUNDING FOR UNSCHEDULED MAINTENANCE AND ADD THREE CLAUSES
May 14, 2024P00049$57.9KMAJOR PROJECTS - MOTSU MS015 BUILD AND INSTALL 3 DOOSAN SPREADER BARS (HMI PANEL UPGRADE)
May 7, 2024P00048$11.2KMAJOR PROJECTS - MOTSU MS014 ORDER DYNAMIC BRAKE MODULE TO ADD TO SSL
May 2, 2024P00047$823UNSCHEDULED MAINTENANCE - MOTSU MS013 REPLACE TWO FLOW CONTROL VALVES FOR SPREADER BAR #2
May 1, 2024P00046$9.0KUNSCHEDULED MAINTENANCE - MOTSU MS009 ADDING 2 DOOSAN GANTRY MOTORS TO SSL
Apr 30, 2024P00045$1.2KUNSCHEDULED MAINTENANCE - MOTCO MC004 BEARINGS TO REPAIR A TRIM, LIST, SKEW PUMP MOTOR PLUS TWO EXTRA BEARINGS FOR SSL
Apr 25, 2024P00044$1.1KUNSCHEDULED MAINTENANCE - MOTSU MS012 BUILD, SHIP, AND INSTALL SECURITY GATE FOR MOTCO CRANES
Apr 17, 2024P00043$38.2KMAJOR PROJECTS - MOTSU MS008 GEAR REDUCER REPLACEMENT FOR KONA CRANE
Apr 16, 2024P00042$860UNSCHEDULED MAINTENANCE - MOTCO MC001 RECHARGE CRANE RAIL BRAKE ACCUMULATORS
Apr 12, 2024P00041$7.1KUNSCHEDULED MAINTENANCE - MOTSU MS010 SURGE PROTECTION DEVICE FOR DOOSAN 1
Apr 11, 2024P00040$262UNSCHEDULED MAINTENANCE - MOTSU MS003 TRIM AND SKEW CONTACTORS FOR DOOSAN 2
Apr 4, 2024P00038$651UNSCHEDULED MAINTENANCE - MOTCO MC002 INSPECT AND SERVICE FIRE EXTINGUISHERS ON TWO CRANES
Apr 4, 2024P00039$449UNSCHEDULED MAINTENANCE - MOTSU MS001 WHEEL BRAKE PROXIMITY SWITCHES FOR DOOSAN 2
Apr 2, 2024P00037$16.1KMAJOR PROJECTS - NMII II0002 MISSION SUPPORT PO
Mar 29, 2024P00036$1.6KUNSCHEDULED MAINTENANCE - II003 NMII FED/OSHA CERTIFICATION OF CRANE.
Mar 21, 2024P00035$1.5KUNSCHEDULED MAINTENANCE - MOTSU MS002 WHEEL BRAKE REBUILD KITS FOR DOOSAN 1
Mar 15, 2024P00034$334UNSCHEDULED MAINTENANCE - MOTSU 12122023 KONE SPREADER BAR CENTER PROXIMITY SWITCHES
Mar 13, 2024P00033$4.2KUNSCHEDULED MAINTENANCE - MS004 AUDIO MESSENGER FOR DOOSAN 2
Mar 8, 2024P00032$1.2KUNSCHEDULED MAINTENANCE - NMII 12292023 ELEVATOR COMPONENTS
Mar 7, 2024P00031$2.0KUNSCHEDULED MAINTENANCE - MOTSU MS006 DB COOLING FAN MOTOR
Feb 2, 2024P00028$1.3KUNSCHEDULED MAINTENANCE - MOTCO 08032023 CRANE 2 GANTRY HORN CIRCUIT BOARD
Feb 2, 2024P00029$6.0KUNSCHEDULED MAINTENANCE - MOTSU 10312023 DOOSAN 1 GANTRY MOTORS 15 AND 5 REBUILD
Feb 2, 2024P00030$80.9KMAJOR PROJECTS - MOTSU 12062023 CONVERTERS
Jan 30, 2024P00027$826UNSCHEDULED MAINTENANCE - MOTSU 10312023 DOOSAN 2 REPLACE PHOTOELECTRIC SENSORS AND CABLES
Dec 28, 2023P00025$5.5KUNSCHEDULED MAINTENANCE - MOTSU 11172023 SSL ADDITION OF 5EA DRIVE FUSES
Dec 28, 2023P00026$2.5KUNSCHEDULED MAINTENANCE - MOTSU 12052023 D 14-WHEEL BRAKE THRUSTER
Dec 27, 2023P00023$2.1KUNSCHEDULED MAINTENANCE - MOTCO 09292023 FAILED CIRCUIT BOARDS
Dec 27, 2023P00024$424UNSCHEDULED MAINTENANCE - NMII 12122023 SECURITY GATE
Dec 26, 2023P00021$480UNSCHEDULED MAINTENANCE - MOTSU 11022023 REPLACE HYDRAULIC HOSES SPARE SPREADER BAR
Dec 26, 2023P00022$19.6KMAJOR PROJECTS - MOTSU 11302023 KONE CRANE HINGE SIDE MOTOR AND GEARBOX REBUILD
Dec 19, 2023P00020$414UNSCHEDULED MAINTENANCE - MOTSU 11022023 REPLACE HYDRAULIC HOSES SPARE SPREADER BAR
Dec 18, 2023P00019$2.6KUNSCHEDULED MAINTENANCE - MOTSU 11012023 REPLACE SPARE SPREADER BAR ACTUATORS
Dec 14, 2023P00018$7.8KUNSCHEDULED MAINTENANCE - MOTSU DOOSAN 1 TMS 2000 FUEL PANEL REPLACEMENT
Sep 28, 2023P00016$523UNSCHEDULED MAINTENANCE - MOTSU 09062023 DOOSAN 1 SOUTH LANDSIDE PHOTOELECTRIC SENSOR AND CABLE BAD
Sep 28, 2023P00017$8.0KUNSCHEDULED MAINTENANCE - MOTSU D1, CONTAMINATED GANTRY GEAR OIL
Sep 27, 2023P00014$969UNSCHEDULED MAINTENANCE - MOTSU 07172023 NODE CABLE REPLACEMENT
Sep 27, 2023P00015$8.5KUNSCHEDULED MAINTENANCE - NMII 09122023 MONTHLY MAINTENANCE
Sep 26, 2023P00012$8.0KUNSCHEDULED MAINTENANCE - MOTSU D2 CONTAMINATED GANTRY GEAR OIL
Sep 26, 2023P00013$5.6KUNSCHEDULED MAINTENANCE - MOTSU KONE CONTAMINATED GANTRY GEAR OIL
Sep 25, 2023P00011$1.3KUNSCHEDULED MAINTENANCE - NMII 08032023 REPLACE A SHORTED PROXIMITY SWITCH BIG BLUE
Sep 15, 2023P00010$5.2KMAJOR PROJECTS - MOTCO 08302023 GENERATOR RENTAL FOR WIRE REPLACEMENT
Sep 12, 2023P00009$3.1KUNSCHEDULED MAINTENANCE - SLIN 1002-02 FOR $3,144.17.
Sep 11, 2023P00008$519.0KMAJOR PROJECTS - SLIN 1003-01 FOR $518,976.68.
Aug 9, 2023P00007$729UNSCHEDULED MAINTENANCE - SLIN 1002-01 FOR $728.52.
Jun 5, 2023P00006$1.1MCRANE MAINTENANCE II - OPTION PERIOD 1
May 25, 2023P00005$845.5KMAJOR PROJECTS
Apr 27, 2023P00004$1.3MSCHEDULED AND PREVENTATIVE MAINTENANCE
Dec 20, 2022P00003$500.0KSCHEDULED AND PREVENTATIVE MAINTENANCE
Sep 29, 2022P00002$200.0KSCHEDULED AND PREVENTATIVE MAINTENANCE
Sep 26, 2022P00001$0SCHEDULED AND PREVENTATIVE MAINTENANCE
May 24, 20220$1.1MSCHEDULED AND PREVENTATIVE MAINTENANCE

Estimated positioning window

Jan 8, 2027 – Jul 8, 2027

Recompete signal:
55/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 55/100. Available recorded signals: 50 points.

Contract end 2028-01-08 (433 days from calculation)
+25 points
1 historical awards in this buyer and category group
+0 points
157 recorded award transactions
+10 points
Latest award action: 2026-06-09
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Check the stated set-aside against the solicitation and current certifications.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.