Department of Defense$8.6M obligationsEnds Dec 11, 2026
Federal contract award
HTC71122CR002
SCHEDULED AND PREVENTATIVE MAINTENANCE
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | USTRANSCOM-AQ |
| NAICS | 811310 — Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance |
| PSC | 3950 — Winches, Hoists, Cranes, and Derricks |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $11.2M |
| Current contract value | $12.3M |
| Potential contract value / ceiling | $12.8M |
| Start date | May 24, 2022 |
| Current end date | Jul 8, 2026 |
| Potential end date | Jan 8, 2028 |
| Latest award activity | Jun 9, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 157 of 157 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 11, 2026 | P00156 | $10.2K | MOTSU MS107 INITIAL QUOTE AND TRANSPORTATION OF THE GENERATOR STATOR ASSEMBLY |
| Jun 9, 2026 | P00155 | $128.3K | MOTSU MS106 OSHA CERTIFIED 20FT SAFETY CAGES |
| Jun 4, 2026 | P00154 | $2.3K | NMII II018 CABLE WINCHES |
| May 21, 2026 | P00153 | $94.8K | MOTSU MS103 NIDEC ANNUAL SERVICE CONTRACT FOR 2026-2027 |
| May 19, 2026 | P00152 | $25.2K | MOTCO MC033 CRANE 1 480 BREAKER |
| May 14, 2026 | P00151 | $125.9K | NMII II017 NIDEC CM-HMI UPGRADE FOR BIG BLUE |
| May 5, 2026 | P00150 | $0 | INCORPORATE FAR CLAUSE 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS. |
| Apr 28, 2026 | P00149 | $29.5K | MOTCO MS105 DOOSAN 2 GENERATOR REAR MAIN SEAL |
| Apr 24, 2026 | P00148 | $5.9K | MOTSU MS104 MOTSU KONE TROLLEY BUMPER STOPS |
| Apr 23, 2026 | P00147 | $0 | CORRECT LOA (97X4930 FD30 6 E3 35 1101 TTTPR000000 4600 2571 W90GA926691680 389900) FOR P00143, CLIN 3003-14. |
| Apr 17, 2026 | P00146 | $142.3K | MOTSU MS101 DOOSAN 2 SPREADER BAR PLC COMPONENTS REPLACEMENT |
| Apr 13, 2026 | P00145 | $49.2K | MOTSU MS101 DOOSAN 2 SPREADER BAR PLC COMPONENTS REPLACEMENT |
| Apr 9, 2026 | P00144 | $2.1K | MOTSU MS100 DOOSAN 1 AND DOOSAN 2 AIR FILTER REPLACEMENT |
| Apr 7, 2026 | P00143 | $25.1K | MOTSU MS099 KONE FIXED SIDE GANTRY GEARBOX |
| Mar 25, 2026 | P00142 | $59.2K | MOTSU MS099 KONE FIXED SIDE GANTRY GEARBOX |
| Mar 17, 2026 | P00141 | $0 | EXTEND THE PERIOD OF PERFORMANCE FOR CLIN 2003 FROM 8 JULY 2025 TO 28 FEBRUARY 2026. |
| Mar 12, 2026 | P00140 | $74.5K | NMII II016 BIG BLUE LIFECYCLE SURVEY |
| Mar 3, 2026 | P00138 | $234 | MOTCO MC031 CRANE 1 HYDRAULIC HOSE |
| Mar 3, 2026 | P00139 | $2.4K | MOTCO MC031 CRANE 1 HYDRAULIC HOSE |
| Feb 4, 2026 | P00137 | $2.1K | MOTCO MC030 CRANE 2 APC SMART UPS BOXES |
| Feb 3, 2026 | P00136 | $2.0K | MOTCO MC030 CRANE 2 APC SMART UPS BOXES |
| Jan 21, 2026 | P00134 | $3.4K | MOTCO MC029 CRANE 1 APC SMART UPS BOXES |
| Jan 21, 2026 | P00135 | $3.4K | MOTCO MC030 CRANE 2 APC SMART UPS BOXES |
| Jan 9, 2026 | P00133 | $13.5K | MOTSU MS094 APC SMART UPS BOXES |
| Jan 8, 2026 | P00131 | $4.2K | MOTSU MS092 KONE GANTRY ELECTRIC MOTOR REBUILD |
| Jan 8, 2026 | P00132 | $2.9K | MOTSU MS092 KONE GANTRY ELECTRIC MOTOR REBUILD |
| Jan 5, 2026 | P00130 | $4.0K | MOTCO MC026 BRIDGE ASSEMBLIES |
| Nov 28, 2025 | P00129 | $132.3K | MOTCO MC026 BRIDGE ASSEMBLIES |
| Nov 25, 2025 | P00128 | $132.3K | MOTCO MC026 BRIDGE ASSEMBLIES |
| Nov 18, 2025 | P00127 | $47.6K | MOTCO MC026 BRIDGE ASSEMBLIES |
| Nov 7, 2025 | P00125 | $926 | MOTSU MS090 DOOSAN 1 E CARD |
| Nov 7, 2025 | P00126 | $131.4K | MOTSU MS091 NIDEC HMI UPGRADES AT MOTSU - DOOSAN CRANES |
| Oct 21, 2025 | P00124 | $12.1K | MOTSU MS089 DOOSAN 2 SPREADER REEL DRIVE |
| Oct 9, 2025 | P00123 | $3.1K | MOTCO MC025 SCR MODULES |
| Oct 3, 2025 | P00122 | $4.7K | MOTCO MC024 1400 AMP FUSE |
| Sep 30, 2025 | P00121 | $1.8K | MS078 - DOOSAN 1 E CARDS REPLACEMENT MS079 - DOOSAN 2 E CARDS REPLACEMENTMC023 - FILTERS |
| Sep 24, 2025 | P00120 | $94.7K | MS084 UPGRADE THE EMCPS ON DOOSAN 1 AND DOOSAN 2 MS085 SPREADER BAR 1 HYDRAULIC HOSE UPGRADEMS086 SPREADER BAR 2 HYDRAULIC HOSE UPGRADEMS087 SPREADER BAR 3 HYDRAULIC HOSE UPGRADEMS088 DOOSAN 1 AND 2 BOOM BUMPER STOPS |
| Sep 9, 2025 | P00119 | $0 | CORRECT WAGE DETERMINATION AT MOTSU FOR OP3 |
| Sep 5, 2025 | P00118 | $100.6K | NMII II015 ELEVATOR REPAIR |
| Aug 8, 2025 | P00116 | $1.2K | MOTSU MS080 DOOSAN 2 MAIN GENERATOR ALTERNATOR REPLACEMENT |
| Aug 8, 2025 | P00117 | $824 | MOTCO MC022 VARIOUS LIGHT BULBS FOR CRANES |
| Aug 7, 2025 | P00114 | $1.4K | MOTSU MS081 GENERATOR TROUBLESHOOT DOOSAN 2 |
| Aug 7, 2025 | P00115 | $8.4K | MOTSU MS082 DOOSAN 2 BAD VOLTAGE REGULATOR |
| Aug 6, 2025 | P00113 | $3.6K | II014 ELEVATOR REPAIR ASSESSMENT |
| Aug 5, 2025 | P00112 | $888 | MOTSU MS077 DOOSAN 2 CAB AC REPAIR |
| Jul 31, 2025 | P00111 | $1.2K | MOTSU MS076 DOOSAN 1 GENERATOR SHUT DOWN ISSUE |
| Jul 29, 2025 | P00110 | $0 | CONTRACT TO PROVIDE MAINTENANCE SERVICES FOR SHIP-TO-SHORE AND GANTRY CRANES AT MILITARY OCEAN TERMINALS CONCORD AND SUNNY POINT AS WELL AS AT NAVAL MAGAZINE INDIAN ISLAND. |
| Jul 11, 2025 | P00109 | $0 | CONTRACT TO PROVIDE MAINTENANCE SERVICES FOR SHIP-TO-SHORE AND GANTRY CRANES AT MILITARY OCEAN TERMINALS CONCORD AND SUNNY POINT AS WELL AS AT NAVAL MAGAZINE INDIAN ISLAND. |
| Jul 3, 2025 | P00108 | $1.1M | CONTRACT TO PROVIDE MAINTENANCE SERVICES FOR SHIP-TO-SHORE AND GANTRY CRANES AT MILITARY OCEAN TERMINALS CONCORD AND SUNNY POINT AS WELL AS AT NAVAL MAGAZINE INDIAN ISLAND. |
| Jul 2, 2025 | P00107 | $115.6K | CONTRACT TO PROVIDE MAINTENANCE SERVICES FOR SHIP-TO-SHORE AND GANTRY CRANES AT MILITARY OCEAN TERMINALS CONCORD AND SUNNY POINT AS WELL AS AT NAVAL MAGAZINE INDIAN ISLAND. |
| Jun 27, 2025 | P00106 | $91.9K | CONTRACT TO PROVIDE MAINTENANCE SERVICES FOR SHIP-TO-SHORE AND GANTRY CRANES AT MILITARY OCEAN TERMINALS CONCORD AND SUNNY POINT AS WELL AS AT NAVAL MAGAZINE INDIAN ISLAND. |
| Jun 26, 2025 | P00104 | $1.2K | CONTRACT TO PROVIDE MAINTENANCE SERVICES FOR SHIP-TO-SHORE AND GANTRY CRANES AT MILITARY OCEAN TERMINALS CONCORD AND SUNNY POINT AS WELL AS AT NAVAL MAGAZINE INDIAN ISLAND. |
| Jun 26, 2025 | P00105 | $3.8K | CONTRACT TO PROVIDE MAINTENANCE SERVICES FOR SHIP-TO-SHORE AND GANTRY CRANES AT MILITARY OCEAN TERMINALS CONCORD AND SUNNY POINT AS WELL AS AT NAVAL MAGAZINE INDIAN ISLAND. |
| Jun 25, 2025 | P00103 | $1.6K | CONTRACT TO PROVIDE MAINTENANCE SERVICES FOR SHIP-TO-SHORE AND GANTRY CRANES AT MILITARY OCEAN TERMINALS CONCORD AND SUNNY POINT AS WELL AS AT NAVAL MAGAZINE INDIAN ISLAND. |
| Jun 23, 2025 | P00102 | $2.6K | MOTSU MS068 RAM SPREADER BAR 2 POWER SUPPLY |
| Jun 17, 2025 | P00101 | $452 | MOTSU MS067 HOIST PUMP SOLENOID COIL |
| Jun 16, 2025 | P00100 | $660 | MOTCO MC019 FOUR HYDRAULIC HOSES |
| Jun 13, 2025 | P00099 | $2.6K | CONTRACT TO PROVIDE MAINTENANCE SERVICES FOR SHIP-TO-SHORE AND GANTRY CRANES AT MILITARY OCEAN TERMINALS CONCORD AND SUNNY POINT AS WELL AS AT NAVAL MAGAZINE INDIAN ISLAND. MOTCO MC021 LOAD MONITORING UNIT WITH TWO SENSOR INPUT |
| Jun 12, 2025 | P00098 | $0 | CONTRACT TO PROVIDE MAINTENANCE SERVICES FOR SHIP-TO-SHORE AND GANTRY CRANES AT MILITARY OCEAN TERMINALS CONCORD AND SUNNY POINT AS WELL AS AT NAVAL MAGAZINE INDIAN ISLAND. |
| Apr 4, 2025 | P00097 | $296 | UNSCHEDULED MAINTENANCE - MOTSU MS066 CRANE STORM PREPARATION |
| Apr 3, 2025 | P00096 | $2.5K | UNSCHEDULED MAINTENANCE - MOTSU MS061 STOKES BASKETS AND HARNESSES |
| Apr 2, 2025 | P00094 | $2.8K | UNSCHEDULED MAINTENANCE - NMII II011 STOKES BASKETS AND HARNESSES |
| Apr 2, 2025 | P00095 | $2.7K | UNSCHEDULED MAINTENANCE - MOTCO MC018 STOKES BASKETS AND HARNESSES |
| Apr 1, 2025 | P00093 | $4.4K | UNSCHEDULED MAINTENANCE - MOTSU MS062 WIRE DRAW MECHANISM |
| Mar 31, 2025 | P00092 | $1.3K | UNSCHEDULED MAINTENANCE - MOTSU MS064 DOOSAN 1 & 2 GENERATOR HOUSING FILTERS |
| Mar 26, 2025 | P00091 | $2.9K | UNSCHEDULED MAINTENANCE - MOTSU MS065 FIRE EXTINGUISHERS (25 10LB AND TWO 20LB ABC EXTINGUISHERS) |
| Mar 25, 2025 | P00090 | $2.1K | UNSCHEDULED MAINTENANCE - NMII II013 120V OUTPUT CARD AND ANALOG INPUT CARD |
| Mar 19, 2025 | P00089 | $0 | MAJOR PROJECTS |
| Feb 22, 2025 | P00088 | $14.9K | MAJOR PROJECTS - MOTSU MS060 REPLACE THE ELEVATOR ROLLERS ON DOOSAN 1 & 2 |
| Feb 20, 2025 | P00087 | $1.5K | UNSCHEDULED MAINTENANCE - MOTCO MC017 FLOODLIGHT BALLASTS REPLACEMENT |
| Feb 19, 2025 | P00086 | $2.6K | UNSCHEDULED MAINTENANCE - MOTCO MC016 HMI PC REPLACEMENT |
| Feb 13, 2025 | P00085 | $250.1K | MAJOR PROJECTS - MOTSU MS011 PLC AND HMI UPGRADES FOR DOOSAN 1 AND 2 |
| Jan 16, 2025 | P00084 | $5.6K | UNSCHEDULED MAINTENANCE - MOTSU MS058 SSL ADDITION OF 2EA FLIPPERS ONE LEFT, ONE RIGHT AND A TURNBUCKLE |
| Jan 15, 2025 | P00083 | $5.9K | UNSCHEDULED MAINTENANCE - MOTSU MS057 SPREADER BAR # 2, TURNBUCKLE AND 2 INSHORE FLIPPERS |
| Jan 10, 2025 | P00082 | $600 | UNSCHEDULED MAINTENANCE - MOTSU MS056 DOOSAN 1 EMERGENCY STOP BUTTON REPLACEMENT |
| Dec 23, 2024 | P00081 | $562 | UNSCHEDULED MAINTENANCE - MOTCO MC014 CRANE ELEVATOR DOOR SWITCH REPLACEMENT |
| Dec 19, 2024 | P00080 | $1.4K | UNSCHEDULED MAINTENANCE - MOTSU MS055 DOOSAN 1 PROXIMITY SWITCH REPLACEMENT (6 EACH) |
| Nov 14, 2024 | P00079 | $231 | UNSCHEDULED MAINTENANCE - MOTCO MC013 REPLACE FLEXIBLE COLLAR TO THE HOIST ENCODER AND DRUM |
| Nov 12, 2024 | P00078 | $47.5K | MAJOR PROJECTS - MOTSU MS043 UPGRADE FROM SCS2 TO SCS-MODULAR |
| Nov 6, 2024 | P00077 | $451 | UNSCHEDULED MAINTENANCE - MOTCO MC009 REPLACE TWO FAILED EMERGENCY EGRESS LIGHTING FIXTURES |
| Sep 25, 2024 | P00074 | $14.8K | MAJOR PROJECTS - MOTSU MS040 REPLACE THE WHEEL BRAKE HYDRAULIC TANKS ON DOOSANS 1 AND 2 |
| Sep 25, 2024 | P00075 | $2.6K | UNSCHEDULED MAINTENANCE - MOTSU MS041 REPLACE TLS VALVES ON DOOSAN 2 |
| Sep 25, 2024 | P00076 | $2.9K | UNSCHEDULED MAINTENANCE - MOTSU MS042 REPAIR GANTRY MOTOR ON DOOSAN 1 |
| Sep 24, 2024 | P00071 | $1.3K | UNSCHEDULED MAINTENANCE - NMII II008 USE HEATGUN, WIPE DOWN, AND INSTALL DESSICANT CONTAINERS ON BIG BLUE ELECTRIC PANELS TO REDUCE MOISTURE DAMAGE (DUE TO LACK OF SHORE POWER) |
| Sep 24, 2024 | P00072 | $9.7K | UNSCHEDULED MAINTENANCE - MOTSU MS035 REPLACE SPREADER BAR LIGHTS AND BUFFER PADS ON DOOSAN SPREADER BARS 1,2,AND 3 |
| Sep 24, 2024 | P00073 | $2.0K | UNSCHEDULED MAINTENANCE - MOTSU MS039 REPLACE SHORE POWER CONNECTORS FOR DOOSAN 1 AND 2 |
| Sep 23, 2024 | P00069 | $290.2K | MAJOR PROJECTS - MOTSU MS029 REPLACE ALL FOUR AIR CONDITIONERS ON ALL DOOSAN CRANES |
| Sep 23, 2024 | P00070 | $8.9K | UNSCHEDULED MAINTENANCE - II007 GANTRY BRAKE REPAIRS FOR GANTRIES #4, 8, 11, AND 18 |
| Sep 22, 2024 | P00067 | $3.0K | UNSCHEDULED MAINTENANCE - MOTSU MS027 REPLACE SPREADER BAR #3 PLC CPU AND MEMORY CARD |
| Sep 22, 2024 | P00068 | $622 | UNSCHEDULED MAINTENANCE - MOTSU MS028 DOOSAN 1 E CARD REPLACEMENT |
| Sep 19, 2024 | P00066 | $558 | UNSCHEDULED MAINTENANCE - MOTSU MS026 REPLACE ELEVATOR CALL CIRCUIT BOARD FOR DOOSAN 2 |
| Sep 18, 2024 | P00065 | $13.6K | MAJOR PROJECTS - MOTSU MS025 REPLACE EMERGENCY HOIST BRAKE ASSEMBLY FOR DOOSAN 1 |
| Sep 5, 2024 | P00064 | $2.1K | UNSCHEDULED MAINTENANCE - MOTSU MS024 TEN PROXIMITY SWITCHES FOR SSL REPLENISHMENT |
| Aug 27, 2024 | P00063 | $1.6K | UNSCHEDULED MAINTENANCE - MOTSU MS022 REPLACE 8EA TPS BALL VALVES ON DOOSAN 1 |
| Aug 13, 2024 | P00062 | $3.9K | UNSCHEDULED MAINTENANCE - MOTSU MS007 WIND MONITOR REPLACEMENT FOR ALL CRANES |
| Aug 9, 2024 | P00061 | $88.0K | MAJOR PROJECTS - MOTSU MS023 NIDEC ANNUAL SUPPORT & SERVICE AGREEMENT |
| Jul 31, 2024 | P00060 | $3.5K | UNSCHEDULED MAINTENANCE - MOTSU MS005 BROMMA BAR TECHNICAL INSPECTION |
| Jul 29, 2024 | P00059 | $2.5K | UNSCHEDULED MAINTENANCE - NMII II006 REPLACE FOUR BATTERIES ON BIG BLUE |
| Jul 22, 2024 | P00058 | $0 | IMPLEMENTATION OF WAGE DETERMINATIONS 2015-5623, REVISION 23 2015-4435, REVISION 23 AND 2015-5545, REVISION 24. |
| Jul 1, 2024 | P00057 | $1.1M | CRANE MAINTENANCE II - OPTION PERIOD TWO (2) |
| Jun 25, 2024 | P00056 | $1.3K | UNSCHEDULED MAINTENANCE - MOTSU MS018 REPLACE WIRE DRAW MECHANISM ON THE SPREADER BAR FOR DOOSAN 2 |
| Jun 20, 2024 | P00055 | $5.9K | UNSCHEDULED MAINTENANCE - MOTSU MS019 REPLACE CHECKER CAB CC FOR DOOSAN 1 |
| Jun 17, 2024 | P00054 | $4.7K | UNSCHEDULED MAINTENANCE - MOTCO MC005 REPLACE CIRCUIT BREAKER TRIP UNIT FOR CRANE 1 |
| Jun 13, 2024 | P00053 | $6.5K | UNSCHEDULED MAINTENANCE - MOTSU MS021 REPLACE 3EA WHEEL BRAKE THRUSTERS FOR DOOSAN 2 |
| Jun 4, 2024 | P00052 | $13.0K | MAJOR PROJECTS - MOTCO MC003 REPLACE CABIN AIR CONDITIONER UNIT FOR CRANE 1 |
| May 21, 2024 | P00051 | $2.3K | UNSCHEDULED MAINTENANCE - MOTSU MS017 GENERATOR OIL BALL VALVE REPLACEMENT FOR DOOSAN 2 |
| May 17, 2024 | P00050 | $452 | FUNDING FOR UNSCHEDULED MAINTENANCE AND ADD THREE CLAUSES |
| May 14, 2024 | P00049 | $57.9K | MAJOR PROJECTS - MOTSU MS015 BUILD AND INSTALL 3 DOOSAN SPREADER BARS (HMI PANEL UPGRADE) |
| May 7, 2024 | P00048 | $11.2K | MAJOR PROJECTS - MOTSU MS014 ORDER DYNAMIC BRAKE MODULE TO ADD TO SSL |
| May 2, 2024 | P00047 | $823 | UNSCHEDULED MAINTENANCE - MOTSU MS013 REPLACE TWO FLOW CONTROL VALVES FOR SPREADER BAR #2 |
| May 1, 2024 | P00046 | $9.0K | UNSCHEDULED MAINTENANCE - MOTSU MS009 ADDING 2 DOOSAN GANTRY MOTORS TO SSL |
| Apr 30, 2024 | P00045 | $1.2K | UNSCHEDULED MAINTENANCE - MOTCO MC004 BEARINGS TO REPAIR A TRIM, LIST, SKEW PUMP MOTOR PLUS TWO EXTRA BEARINGS FOR SSL |
| Apr 25, 2024 | P00044 | $1.1K | UNSCHEDULED MAINTENANCE - MOTSU MS012 BUILD, SHIP, AND INSTALL SECURITY GATE FOR MOTCO CRANES |
| Apr 17, 2024 | P00043 | $38.2K | MAJOR PROJECTS - MOTSU MS008 GEAR REDUCER REPLACEMENT FOR KONA CRANE |
| Apr 16, 2024 | P00042 | $860 | UNSCHEDULED MAINTENANCE - MOTCO MC001 RECHARGE CRANE RAIL BRAKE ACCUMULATORS |
| Apr 12, 2024 | P00041 | $7.1K | UNSCHEDULED MAINTENANCE - MOTSU MS010 SURGE PROTECTION DEVICE FOR DOOSAN 1 |
| Apr 11, 2024 | P00040 | $262 | UNSCHEDULED MAINTENANCE - MOTSU MS003 TRIM AND SKEW CONTACTORS FOR DOOSAN 2 |
| Apr 4, 2024 | P00038 | $651 | UNSCHEDULED MAINTENANCE - MOTCO MC002 INSPECT AND SERVICE FIRE EXTINGUISHERS ON TWO CRANES |
| Apr 4, 2024 | P00039 | $449 | UNSCHEDULED MAINTENANCE - MOTSU MS001 WHEEL BRAKE PROXIMITY SWITCHES FOR DOOSAN 2 |
| Apr 2, 2024 | P00037 | $16.1K | MAJOR PROJECTS - NMII II0002 MISSION SUPPORT PO |
| Mar 29, 2024 | P00036 | $1.6K | UNSCHEDULED MAINTENANCE - II003 NMII FED/OSHA CERTIFICATION OF CRANE. |
| Mar 21, 2024 | P00035 | $1.5K | UNSCHEDULED MAINTENANCE - MOTSU MS002 WHEEL BRAKE REBUILD KITS FOR DOOSAN 1 |
| Mar 15, 2024 | P00034 | $334 | UNSCHEDULED MAINTENANCE - MOTSU 12122023 KONE SPREADER BAR CENTER PROXIMITY SWITCHES |
| Mar 13, 2024 | P00033 | $4.2K | UNSCHEDULED MAINTENANCE - MS004 AUDIO MESSENGER FOR DOOSAN 2 |
| Mar 8, 2024 | P00032 | $1.2K | UNSCHEDULED MAINTENANCE - NMII 12292023 ELEVATOR COMPONENTS |
| Mar 7, 2024 | P00031 | $2.0K | UNSCHEDULED MAINTENANCE - MOTSU MS006 DB COOLING FAN MOTOR |
| Feb 2, 2024 | P00028 | $1.3K | UNSCHEDULED MAINTENANCE - MOTCO 08032023 CRANE 2 GANTRY HORN CIRCUIT BOARD |
| Feb 2, 2024 | P00029 | $6.0K | UNSCHEDULED MAINTENANCE - MOTSU 10312023 DOOSAN 1 GANTRY MOTORS 15 AND 5 REBUILD |
| Feb 2, 2024 | P00030 | $80.9K | MAJOR PROJECTS - MOTSU 12062023 CONVERTERS |
| Jan 30, 2024 | P00027 | $826 | UNSCHEDULED MAINTENANCE - MOTSU 10312023 DOOSAN 2 REPLACE PHOTOELECTRIC SENSORS AND CABLES |
| Dec 28, 2023 | P00025 | $5.5K | UNSCHEDULED MAINTENANCE - MOTSU 11172023 SSL ADDITION OF 5EA DRIVE FUSES |
| Dec 28, 2023 | P00026 | $2.5K | UNSCHEDULED MAINTENANCE - MOTSU 12052023 D 14-WHEEL BRAKE THRUSTER |
| Dec 27, 2023 | P00023 | $2.1K | UNSCHEDULED MAINTENANCE - MOTCO 09292023 FAILED CIRCUIT BOARDS |
| Dec 27, 2023 | P00024 | $424 | UNSCHEDULED MAINTENANCE - NMII 12122023 SECURITY GATE |
| Dec 26, 2023 | P00021 | $480 | UNSCHEDULED MAINTENANCE - MOTSU 11022023 REPLACE HYDRAULIC HOSES SPARE SPREADER BAR |
| Dec 26, 2023 | P00022 | $19.6K | MAJOR PROJECTS - MOTSU 11302023 KONE CRANE HINGE SIDE MOTOR AND GEARBOX REBUILD |
| Dec 19, 2023 | P00020 | $414 | UNSCHEDULED MAINTENANCE - MOTSU 11022023 REPLACE HYDRAULIC HOSES SPARE SPREADER BAR |
| Dec 18, 2023 | P00019 | $2.6K | UNSCHEDULED MAINTENANCE - MOTSU 11012023 REPLACE SPARE SPREADER BAR ACTUATORS |
| Dec 14, 2023 | P00018 | $7.8K | UNSCHEDULED MAINTENANCE - MOTSU DOOSAN 1 TMS 2000 FUEL PANEL REPLACEMENT |
| Sep 28, 2023 | P00016 | $523 | UNSCHEDULED MAINTENANCE - MOTSU 09062023 DOOSAN 1 SOUTH LANDSIDE PHOTOELECTRIC SENSOR AND CABLE BAD |
| Sep 28, 2023 | P00017 | $8.0K | UNSCHEDULED MAINTENANCE - MOTSU D1, CONTAMINATED GANTRY GEAR OIL |
| Sep 27, 2023 | P00014 | $969 | UNSCHEDULED MAINTENANCE - MOTSU 07172023 NODE CABLE REPLACEMENT |
| Sep 27, 2023 | P00015 | $8.5K | UNSCHEDULED MAINTENANCE - NMII 09122023 MONTHLY MAINTENANCE |
| Sep 26, 2023 | P00012 | $8.0K | UNSCHEDULED MAINTENANCE - MOTSU D2 CONTAMINATED GANTRY GEAR OIL |
| Sep 26, 2023 | P00013 | $5.6K | UNSCHEDULED MAINTENANCE - MOTSU KONE CONTAMINATED GANTRY GEAR OIL |
| Sep 25, 2023 | P00011 | $1.3K | UNSCHEDULED MAINTENANCE - NMII 08032023 REPLACE A SHORTED PROXIMITY SWITCH BIG BLUE |
| Sep 15, 2023 | P00010 | $5.2K | MAJOR PROJECTS - MOTCO 08302023 GENERATOR RENTAL FOR WIRE REPLACEMENT |
| Sep 12, 2023 | P00009 | $3.1K | UNSCHEDULED MAINTENANCE - SLIN 1002-02 FOR $3,144.17. |
| Sep 11, 2023 | P00008 | $519.0K | MAJOR PROJECTS - SLIN 1003-01 FOR $518,976.68. |
| Aug 9, 2023 | P00007 | $729 | UNSCHEDULED MAINTENANCE - SLIN 1002-01 FOR $728.52. |
| Jun 5, 2023 | P00006 | $1.1M | CRANE MAINTENANCE II - OPTION PERIOD 1 |
| May 25, 2023 | P00005 | $845.5K | MAJOR PROJECTS |
| Apr 27, 2023 | P00004 | $1.3M | SCHEDULED AND PREVENTATIVE MAINTENANCE |
| Dec 20, 2022 | P00003 | $500.0K | SCHEDULED AND PREVENTATIVE MAINTENANCE |
| Sep 29, 2022 | P00002 | $200.0K | SCHEDULED AND PREVENTATIVE MAINTENANCE |
| Sep 26, 2022 | P00001 | $0 | SCHEDULED AND PREVENTATIVE MAINTENANCE |
| May 24, 2022 | 0 | $1.1M | SCHEDULED AND PREVENTATIVE MAINTENANCE |
Estimated positioning window
Jan 8, 2027 – Jul 8, 2027
Recompete signal: . Rule-based research score; positioning dates are estimates.
55/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 55/100. Available recorded signals: 50 points.
- Contract end 2028-01-08 (433 days from calculation)
- +25 points
- 1 historical awards in this buyer and category group
- +0 points
- 157 recorded award transactions
- +10 points
- Latest award action: 2026-06-09
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Verify whether remaining options may extend performance beyond the current end date.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.