Federal contract award

INR17PC00023

POJOAQUE BASIN REGIONAL WATER SYSTEM IGF::OT::IGF

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of the Interior
OfficeUPPER COLORADO REGIONAL OFFICE
NAICS237110 — Water and Sewer Line and Related Structures Construction
PSCY1NE — CONSTRUCTION OF WATER SUPPLY FACILITIES
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$361.6M
Current contract value$361.6M
Potential contract value / ceiling$361.6M
Start dateFeb 21, 2017
Current end dateFeb 28, 2027
Potential end dateDec 31, 2028
Latest award activitySep 4, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 65 of 65 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 4, 2026P00064$20.8KPOJOAQUE BASIN REGIONAL WATER SYSTEM PHASE I
Aug 25, 2026P00063$2.0MPOJOAQUE BASIN REGIONAL WATER SYSTEM PHASE I
Aug 7, 2026P00062$1.9MPOJOAQUE BASIN REGIONAL WATER SYSTEM PHASE I
Jul 1, 2026P00061$6.0KEO 14398-POJOAQUE BASIN REGIONAL WATER SYSTEM PHASE I
Jun 24, 2026P00060$-290.7KPOJOAQUE BASIN REGIONAL WATER SYSTEM PHASE I
Jun 4, 2026P00059$694POJOAQUE BASIN REGIONAL WATER SYSTEM PHASE I
May 12, 2026P00058$89.8KPOJOAQUE BASIN REGIONAL WATER SYSTEM PHASE I
May 7, 2026P00057$30.5KPOJOAQUE BASIN REGIONAL WATER SYSTEM PHASE I
Apr 29, 2026P00056$180.7KPOJOAQUE BASIN REGIONAL WATER SYSTEM PHASE I
Apr 27, 2026P00055$19.7KPOJOAQUE BASIN REGIONAL WATER SYSTEM PHASE I
Apr 3, 2026P00054$11.3KPOJOAQUE BASIN REGIONAL WATER SYSTEM PHASE I
Mar 30, 2026P00053$71.9KPOJOAQUE BASIN REGIONAL WATER SYSTEM PHASE I
Jan 6, 2026P00052$0THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE COR
Sep 10, 2025P00050$6.2KTHE PURPOSE OF THIS MODIFICATION IS FOR THE CONTRACTOR (CDM) TO PERFORM MUSEUM AND ARCHIVAL SERVICES AT THE TEWA CENTER.
Sep 10, 2025P00051$25.2MTHE PURPOSE OF THIS MODIFICATION IS INCREMENTALLY FUND THE CONTRACT.
Aug 18, 2025P00049$0THE PURPOSE OF THIS MODIFICATION IS FOR THE CONTRACTOR (CDM) TO PERFORM A REDESIGN OF THE PBRWS DISTRIBUTION PIPELINE (REACH FWS46_SAN) TO GO AROUND THE NEW DEERTAIL HOUSING DEVELOPMENT.
Jul 28, 2025P00048$29.2KTHE PURPOSE OF THIS MODIFICATION IS FOR THE CONTRACTOR (CDM) TO PERFORM A REDESIGN OF THE PBRWS DISTRIBUTION PIPELINE (REACH FWS46_SAN) TO GO AROUND THE NEW DEERTAIL HOUSING DEVELOPMENT.
Jul 3, 2025P00047$0CORRECT THE PERIOD OF PERFORMANCE DATES OF CLINS IN THE PRISM SYSTEM.
Jul 2, 2025P00046$67.2KADDITIONAL VIBRATION MONITORING
May 16, 2025P00045$290.7KPERMANENT POWER
Feb 28, 2025P00044$0CORRECT THE PERIOD OF PERFORMANCE OF VARIOUS CLINS
Jan 15, 2025P00043$62.5MTHE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND THE CONTRACT.
Dec 13, 2024P00042$162.4KTHE PURPOSE OF THIS MODIFICATION IS TO COMPENSATE THE CONTRACTOR VIA AN (EQUITABLE ADJUSTMENT) FOR ADDITIONAL EXPENSES ASSOCIATED WITH THE DELAY OF THE GOVERNMENT TO EXECUTE THE BALANCE OF WORK BEFORE THE MEMBRANE SUPPLIER (WIGEN) PROPOSAL EXPIRED.
Dec 9, 2024P00041$10.3KTHE PURPOSE OF THIS MODIFICATION IS TO OBTAIN RADIO LICENSES FOR THE POJOAQUE REGIONAL WATER REGIONAL WATER AUTHORITY UPON ITS FORMATION.
Aug 29, 2024P00040$203.2KTHE PURPOSE OF THIS MODIFICATION IS TO IS TO COMPENSATE THE CONTRACTOR FOR ADDITIONAL EXPENSES ASSOCIATED WITH THE DIRECTION FROM RECLAMATION TO INSTALL PERMEANT POWER FROM JMEC'S (JEMEZ MOUNTAIN COOPERATIVE INC) SUBSTATION TO NM-502 AT ENTRADA
Aug 15, 2024P00038$25.8KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE MISCELLANEOUS DESIGN ALIGNMENT UPDATES INTO THE CONTRACT.
Aug 15, 2024P00039$125.0MTHE PURPOSE OF THIS MODIFICATION IS TO INCREMENTALLY FUND THE CONTRACT.
Jun 20, 2024P00037$0THE PURPOSE OF THIS MODIFICATION IS TO CORRECT THE PERIOD OF PERFORMANCE DATE OF CLIN 506 IN THE PRISM SYSTEM. THIS IS AN ADMINISTRATIVE MODIFICATION.
Apr 8, 2024P00036$0ADMINISTRATIVE MODIFICATION TO CORRECT THE PERIOD OF PERFORMANCE RECORDED IN THE CONTRACT WRITING SYSTEM (PRISM) USED BY THE BUREAU OF RECLAMATION.
Mar 1, 2024P00035$56.0KTHE PURPOSE OF THIS MODIFICATION IS TO INTEGRATE DESIGN CHANGES SPECIFICALLY ELEVATION CHANGES TO THE SOUTH FOREBAY TANK AND ELEVATION CHANGES TO THE EL RANCHO PIPELINE ALIGNMENTS.
Dec 15, 2023P00034$50.0MPBRWS P00034 - BALANCE OF CONSTRUCTION
Aug 14, 2023P00033$0POJOAQUE BASIN REGIONAL WATER SYSTEM
Mar 15, 2023P00032$0POJOAQUE BASIN REGIONAL WATER SYSTEM
Feb 9, 2023P00031$447.6KPOJOAQUE BASIN REGIONAL WATER SYSTEM
Dec 15, 2022P00030$0POJOAQUE BASIN REGIONAL WATER SYSTEM
Sep 23, 2022P00029$587.3KPOJOAQUE BASIN REGIONAL WATER SYSTEM
Sep 2, 2022P00028$0POJOAQUE BASIN REGIONAL WATER SYSTEM
Jun 13, 2022P00027$0POJOAQUE BASIN REGIONAL WATER SYSTEM
May 3, 2022P00026$0POJOAQUE BASIN REGIONAL WATER SYSTEM
Apr 27, 2022P00025$86.3KPOJOAQUE BASIN REGIONAL WATER SYSTEM
Nov 24, 2021P00024$0POJOAQUE BASIN REGIONAL WATER SYSTEM
Apr 22, 2021P00023$0POJOAQUE BASIN REGIONAL WATER SYSTEM
Mar 12, 2021P00022$66.5MPOJOAQUE BASIN REGIONAL WATER SYSTEM
Nov 23, 2020P00021$0POJOAQUE BASIN REGIONAL WATER SYSTEM
Oct 19, 2020P00020$0POJOAQUE BASIN REGIONAL WATER SYSTEM
Sep 4, 2020P00018$-8.3MPOJOAQUE BASIN REGIONAL WATER SYSTEM
Sep 4, 2020P00019$8.3MPOJOAQUE BASIN REGIONAL WATER SYSTEM
Aug 20, 2020P00017$2.5MPOJOAQUE BASIN REGIONAL WATER SYSTEM
May 13, 2020P00016$0POJOAQUE BASIN REGIONAL WATER SYSTEM
Mar 12, 2020P00015$0POJOAQUE BASIN REGIONAL WATER SYSTEM
Sep 11, 2019P00013$0POJOAQUE BASIN REGIONAL WATER SYSTEM
Sep 11, 2019P00014$10.0MPOJOAQUE BASIN REGIONAL WATER SYSTEM
Jul 17, 2019P00012$206.4KPOJOAQUE BASIN REGIONAL WATER SYSTEM
May 7, 2019P00011$1.6MPOJOAQUE BASIN REGIONAL WATER SYSTEM IGF::OT::IGF
Mar 15, 2019P00010$0POJOAQUE BASIN REGIONAL WATER SYSTEM IGF::OT::IGF
Jan 17, 2019P00009$0POJOAQUE BASIN REGIONAL WATER SYSTEM IGF::OT::IGF
Dec 11, 2018P00008$0POJOAQUE BASIN REGIONAL WATER SYSTEM IGF::OT::IGF
Sep 18, 2018P00007$211.9KPOJOAQUE BASIN REGIONAL WATER SYSTEM IGF::OT::IGF
Aug 27, 2018P00006$84.2KPOJOAQUE BASIN REGIONAL WATER SYSTEM IGF::OT::IGF
Aug 2, 2018P00005$0POJOAQUE BASIN REGIONAL WATER SYSTEM IGF::OT::IGF
Feb 27, 2018P00003$156.5KPOJOAQUE BASIN REGIONAL WATER SYSTEM IGF::OT::IGF
Feb 2, 2018P00004$39.2KPOJOAQUE BASIN REGIONAL WATER SYSTEM IGF::OT::IGF
Dec 7, 2017P00002$184.6KPOJOAQUE BASIN REGIONAL WATER SYSTEM IGF::OT::IGF
Jul 5, 20171$0POJOAQUE BASIN REGIONAL WATER SYSTEM IGF::OT::IGF
Feb 21, 20170$11.4MPOJOAQUE BASIN REGIONAL WATER SYSTEM IGF::OT::IGF

Estimated positioning window

Dec 31, 2027 – Jun 30, 2028

Recompete signal:
60/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 60/100. Available recorded signals: 55 points.

Contract end 2028-12-31 (798 days from calculation)
+15 points
15 historical awards in this buyer and category group
+15 points
65 recorded award transactions
+10 points
Latest award action: 2026-09-04
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Buyer contacts from matching notices

Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.

ContactRolePublished contact methodsEvidenceSource date
Durrant, JamesContactContact method not publishedSourceSep 7, 2016
Durrant, JamesContactContact method not publishedSourceSep 7, 2016
Durrant, JamesContactContact method not publishedSourceSep 7, 2016
Durrant, JamesContactContact method not publishedSourceSep 7, 2016
Durrant, JamesContactContact method not publishedSourceSep 7, 2016
Durrant, JamesContactContact method not publishedSourceAug 31, 2016
Durrant, JamesContactContact method not publishedSourceAug 31, 2016
Durrant, JamesContactContact method not publishedSourceAug 31, 2016
Durrant, JamesContactContact method not publishedSourceAug 31, 2016
Durrant, JamesContactContact method not publishedSourceAug 31, 2016
Durrant, JamesContactContact method not publishedSourceAug 23, 2016
Durrant, JamesContactContact method not publishedSourceAug 23, 2016
Durrant, JamesContactContact method not publishedSourceAug 23, 2016
Durrant, JamesContactContact method not publishedSourceAug 23, 2016
Durrant, JamesContactContact method not publishedSourceAug 23, 2016
Durrant, JamesContactContact method not publishedSourceJul 29, 2016
Durrant, JamesContactContact method not publishedSourceJul 29, 2016
Washington BennettContract Specialistwbennett@usbr.gov
801-524-3853
SourceMay 2, 2016

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Check the stated set-aside against the solicitation and current certifications.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.