Federal contract award
KX04
THE PURPOSE OF THIS TASK ORDER FOR PRODUCT MANAGER AVIATION MISSION EQUIPMENT (PM AME)IS TO STUDY, DESIGN, AND IMPLEMENT ELEMENTS OF A-PNT WITH THE AN/ASN-128D DOPPLER GLOBAL POSITION SYSTEM NAVIGATION SET (DGNS) FOR THE UH-60A/L PLATFORM, TO INCLUDE RESILIENCY AND SOFTWARE ASSURANCE MODIFICATION (RSAM)AND PROVIDE UPGRADES TO THE SUITE E AND SUITE 1 SOFTWARE BASELINES.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QK ACC-APG |
| NAICS | 334511 — Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing |
| PSC | AC64 — DEFENSE ELECTRONICS AND COMMUNICATION EQUIPMENT - ENGINEERING DEVELOPMENT |
| Parent award / vehicle | W15P7T13DE013 |
| Set-aside | Not reported |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $18.0M |
| Current contract value | $18.1M |
| Potential contract value / ceiling | $18.1M |
| Start date | May 25, 2018 |
| Current end date | Mar 31, 2025 |
| Potential end date | Mar 31, 2025 |
| Latest award activity | Sep 17, 2025 |
| Source loaded | Aug 15, 2026 |
Funding and modification history
Showing the latest 2 of 2 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 17, 2025 | 35 | $-42.4K | CONTRACT CLOSE-OUT AND REMOVAL OF CANCELING FUNDS |
| Dec 10, 2024 | 34 | $0 | EXTEND PERIOD OF PERFORMANCE FOR CONTRACT LINE ITEMS 0602AA, 0602AB, 0602AC AND 0604AA AND RETURN GOVERNMENT FURNISHED PROPERTY ON TASK ORDER KX04 TO STUDY, DESIGN, AND IMPLEMENT ELEMENTS OF AN ASSURED POSITION, NAVIGATION AND TIME (A-PNT) GLOBAL POSITION SYSTEM (GPS) WITH THE AN/ASN-128D DOPPLER RADAR FOR THE UH-60L PLATFORM, SUCH AS RESILIENCY AND SOFTWARE ASSURANCE MODIFICATION (RSAM) UNDER THE SINGLE AWARD INDEFINITE DELIVERY INDEFINITE QUANTITY CONTRACT W15P7T-13-D-E013. |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.