Federal contract award

KX04

THE PURPOSE OF THIS TASK ORDER FOR PRODUCT MANAGER AVIATION MISSION EQUIPMENT (PM AME)IS TO STUDY, DESIGN, AND IMPLEMENT ELEMENTS OF A-PNT WITH THE AN/ASN-128D DOPPLER GLOBAL POSITION SYSTEM NAVIGATION SET (DGNS) FOR THE UH-60A/L PLATFORM, TO INCLUDE RESILIENCY AND SOFTWARE ASSURANCE MODIFICATION (RSAM)AND PROVIDE UPGRADES TO THE SUITE E AND SUITE 1 SOFTWARE BASELINES.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QK ACC-APG
NAICS334511 — Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
PSCAC64 — DEFENSE ELECTRONICS AND COMMUNICATION EQUIPMENT - ENGINEERING DEVELOPMENT
Parent award / vehicleW15P7T13DE013
Set-asideNot reported
Pricing typeCOST PLUS FIXED FEE
Obligations$18.0M
Current contract value$18.1M
Potential contract value / ceiling$18.1M
Start dateMay 25, 2018
Current end dateMar 31, 2025
Potential end dateMar 31, 2025
Latest award activitySep 17, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 2 of 2 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 17, 202535$-42.4KCONTRACT CLOSE-OUT AND REMOVAL OF CANCELING FUNDS
Dec 10, 202434$0EXTEND PERIOD OF PERFORMANCE FOR CONTRACT LINE ITEMS 0602AA, 0602AB, 0602AC AND 0604AA AND RETURN GOVERNMENT FURNISHED PROPERTY ON TASK ORDER KX04 TO STUDY, DESIGN, AND IMPLEMENT ELEMENTS OF AN ASSURED POSITION, NAVIGATION AND TIME (A-PNT) GLOBAL POSITION SYSTEM (GPS) WITH THE AN/ASN-128D DOPPLER RADAR FOR THE UH-60L PLATFORM, SUCH AS RESILIENCY AND SOFTWARE ASSURANCE MODIFICATION (RSAM) UNDER THE SINGLE AWARD INDEFINITE DELIVERY INDEFINITE QUANTITY CONTRACT W15P7T-13-D-E013.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.