Federal contract award
KZ03
IGF::CL,CT::IGF THIS TASK ORDER, KZ03, IS ISSUED PURSUANT TO THE BASIC CONTRACT, W15P7T-10-D-D421, ON A COST-PLUS-FIXED-FEE (CPFF) TERM AND COST (NO FEE) BASIS (TRAVEL/MATERIAL/ODC) FOR A PERIOD OF PERFORMANCE CONSISTS OF ONE (1) THIRTY (30) DAY TRANSITION PERIOD, ONE (1) ELEVEN (11) MONTH BASE PERIOD AND FOUR (4) TWELVE (12) MONTH OPTION PERIODS. THE PERIO OF PERFORMANCE FOR THE TRANSITION PERIOD STARTS ON 15 AUGUST 2017 THROUGH 14 SEPTEMBER 2017. THE PERIOD OF PERFORMANCE FOR THE BASE PERIOD STARTS ON 15 SEPTEMBER 2017 AND ENDS 14 AUGUST 2018. THE PERIOD OF PERFORMANCE FOR EACH FUNDING SLIN IS IDENTIFIED IN SECTION B. THE RAPID RESPONSE THIRD GENERATION (R2-3G) ORDER NUMBER ASSOCIATED WITH THIS TASK ORDER IS R23G-1002
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QK ACC-APG |
| NAICS | 541330 — Engineering Services |
| PSC | R425 — Engineering and Technical Services |
| Parent award / vehicle | W15P7T10DD421 |
| Set-aside | Not reported |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $145.1M |
| Current contract value | $175.3M |
| Potential contract value / ceiling | $175.3M |
| Start date | Aug 15, 2017 |
| Current end date | Jul 27, 2022 |
| Potential end date | Jul 27, 2022 |
| Latest award activity | May 6, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 115 of 115 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 6, 2026 | BE | $-3.9K | THIS EFFORT PROVIDES SYSTEM ENGINEERING TECHNICAL ASSISTANCE (SETA) SUPPORT TO EXISTING AND NEW SYSTEMS, FAMILY OF SYSTEM PLATFORM, SUBSYSTEMS, AND ITEMS. |
| Jul 1, 2025 | BD | $-112.1K | THIS EFFORT PROVIDES SYSTEM ENGINEERING TECHNICAL ASSISTANCE (SETA) SUPPORT TO EXISTING AND NEW SYSTEMS, FAMILY OF SYSTEM PLATFORM, SUBSYSTEMS AND ITEMS. |
| Mar 20, 2025 | BC | $-224.8K | THIS EFFORT PROVIDES SYSTEM ENGINEERING TECHNICAL ASSISTANCE (SETA) SUPPORT TO EXISTING AND NEW SYSTEMS, FAMILY OF SYSTEM PLATFORM, SUBSYSTEMS AND ITEMS. |
| Mar 7, 2025 | BB | $0 | THIS EFFORT PROVIDES SYSTEMS ENGINEERING TECHNICAL ASSISTANCE (SETA) SUPPORT TO EXISTING AND NEW SYSTEMS, FAMILY OF SYSTEMS, PLATFORMS, SUBSYSTEMS AND ITEMS. |
| Sep 26, 2024 | BA | $-426.4K | THIS MODIFICATION DE-OBLIGATES EXCESS FUNDS. |
| Sep 27, 2023 | B9 | $-3.8K | THIS MODIFICATION REMOVES EXCESS FUNDS. |
| May 30, 2023 | B8 | $-1.0M | THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDING. |
| Sep 14, 2022 | B7 | $-3.5M | THE PURPOSE OF THIS MODIFICATION (B7) IS TO 1) DE-OBLIGATE EXCESS FUNDS. |
| Jun 5, 2022 | B6 | $-42.3K | THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDS AND INCORPORATE A REVISED PERFORMANCE WORK STATEMENT (PWS). |
| Apr 27, 2022 | B5 | $1.6M | THIS MODIFICATION (B5) IS TO 1)ADD IN INCREMENTAL FUNDING, 2) REALIGN FUNDS, AND 3) INCORPORATE A REVISED GFP LIST. |
| Mar 29, 2022 | B4 | $307.6K | THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| Mar 1, 2022 | B3 | $1.7M | THIS MODIFICATION (B3) IS TO ADD IN INCREMENTAL FUNDING AND REALIGN FUNDS. |
| Jan 26, 2022 | B2 | $284.1K | THIS MODIFICATION IS TO (1) ADD IN INCREMENTAL FUNDING, (2) DE-OBLIGATE EXCESS FUNDS, (3) INCORPORATE A REVISED PERFORMANCE WORK STATEMENT AND (4) GOVERNMENT FURNISHED PROPERTY LIST. |
| Dec 15, 2021 | B1 | $3.6M | THIS MODIFICATION (B1) IS TO ADD $3,626,205.14 IN INCREMENTAL FUNDING. |
| Dec 7, 2021 | 99 | $0 | THIS MODIFICATION IS TO INCORPORATE A REVISED DD FORM 254. |
| Nov 23, 2021 | 98 | $3.6M | THE PURPOSE OF THIS MODIFICATION (98) IS TO ADD INCREMENTAL FUNDING TOTALING $3,639,948.44. |
| Oct 27, 2021 | 97 | $0 | THIS MODIFICATION IS TO CORRECT THE EFFECTIVE/SIGNED/START DATE ON MODIFICATION 96 FROM 10/21/2021 TO 10/27/2021. |
| Oct 21, 2021 | 96 | $3.5M | THIS MODIFICATION ADDS INCREMENTAL FUNDING AND INCORPORATES A REVISED GFP LIST. |
| Oct 19, 2021 | 95 | $0 | THIS MODIFICATION IS TO INCORPORATE DFARS CLAUSE 252.223-7999. |
| Sep 30, 2021 | 94 | $48.0K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING FOR SETA SUPPORT |
| Sep 29, 2021 | 93 | $0 | THIS MODIFICATION IS TO REALIGN FUNDING FROM OPTION PERIODS 1 AND 2 TO OPTION PERIOD 4. |
| Sep 27, 2021 | 91 | $140.5K | THE PURPOSE OF THIS MODIFICATION (91) IS TO ADD INCREMENTAL FUNDING. |
| Sep 27, 2021 | 92 | $9.9K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO SETA SUPPORT SERVICES. |
| Sep 21, 2021 | 90 | $511.9K | THIS MODIFICATION (90) IS TO (1) ADD INCREMENTAL FUNDING AND (2) INCORPORATE A REVISED DD FORM 254 AND ACCEPTABLE USE POLICY FORM. |
| Sep 16, 2021 | 89 | $5.1M | THIS MODIFICATION (89)ADDS INCREMENTAL FUNDING, REALIGNS FUNDING, INCORPORATES A REVISED PERFORMANCE WORK STATEMENT AND GFP LIST. |
| Aug 26, 2021 | 88 | $-57.4K | THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING, DE-OBLIGATE FUNDING, AND INCORPORATE THE GOVERNMENT FURNISHED PROPERTY LIST. |
| Aug 12, 2021 | 87 | $929.3K | THIS MODIFICATION (87) IS TO (1) ADD INCREMENTAL FUNDING AND (2) CORRECT THE ALLOCATION OF COST AND FEE FOR SLIN 4001BA ON THE PREVIOUS MODIFICATION (86). |
| Jul 28, 2021 | 86 | $3.6M | THIS MODIFICATION INCREASES THE CEILING BY $11,115,662.57, COMBINES OPTION PERIOD 4 AND THE TRANSITION-OUT PERIOD, ADDS/REALIGNS/DE-OBLIGATES FUNDS, AND ADJUSTS THE COST/FEE ON PREVIOUSLY OBLIGATED OPTION PERIOD 4 FUNDING. |
| Jul 15, 2021 | 85 | $20.0K | THIS MODIFICATION ADDS INCREMENTAL FUNDING, REALIGNS FUNDING, PROVIDES BILLING INSTRUCTIONS, CORRECTS THE SECTION A NARRATIVE ON PREVIOUS MODIFICATION 84, AND UPDATES THE DESIGNATED PRIMARY COR. |
| May 27, 2021 | 84 | $3.9M | THE PURPOSE OF THIS MODIFICATION (84) IS TO (1) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $4,246,382.88 AND (2) DEOBLIGATE FUNDING IN THE AMOUNT OF $374,096.02. |
| Apr 27, 2021 | 83 | $9.8M | THIS MODIFICATION EXERCISES OPTION PERIOD 4 IAW FAR 52.217-9, "OPTION TO EXTEND THE TERM OF CONTRACT". THE PERIOD OF PERFORMANCE FOR OPTION PERIOD 4 IS 28 JULY 2021 THROUGH 27 JULY 2022, EVALUATED PRIOR TO CONTRACT AWARD AND VALUED AT $39,939,555.80. |
| Apr 21, 2021 | 82 | $802.0K | THIS MODIFICATION ADDS INCREMENTAL FUNDING, INCORPORATES A REVISED GFP LIST, AND CORRECTS AN ADMINISTRATIVE ERROR ON PREVIOUS MODIFICATIONS 80 AND 81. |
| Mar 23, 2021 | 81 | $4.0M | THE PURPOSE OF THIS MODIFICATION (81) IS TO ADD INCREMENTAL FUNDING TOTALING $3,989,046.04. |
| Mar 8, 2021 | 80 | $-15.0K | HE PURPOSE OF THIS MODIFICATION (80) IS TO (1) DE-OBLIGATE EXCESS FUNDING TOTALING $14,972.30 AND (2) CORRECT AN ADMINISTRATIVE ERROR ON THE PREVIOUS MODIFICATION (79). |
| Feb 26, 2021 | 79 | $2.7M | THE PURPOSE OF THIS MODIFICATION (79) IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $2,729,986.55. |
| Jan 26, 2021 | 78 | $1.6M | THIS MODIFICATION ADDS INCREMENTAL FUNDING IN THE AMOUNT OF $1,596,440.45 AND REALIGNS FUNDING IN THE AMOUNT OF $93,000.00. |
| Jan 20, 2021 | 77 | $-8.1K | THIS MODIFICATION INCORPORATES A LUMP SUM AGREEMENT AMOUNT THAT HAS BEEN NEGOTIATED AND AGREED TO BY AASKI AND THE GOVERNMENT AS WELL AS ALTERNATE I OF FAR CLAUSE 52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA-MODIFICATIONS. |
| Dec 16, 2020 | 76 | $498.9K | THIS MODIFICATION (76) IS TO (1) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $535,385.78 AND (2) DE-OBLIGATE FUNDING TOTALING $36,500.00 FROM OPTION PERIOD 2. |
| Nov 30, 2020 | 75 | $1.6M | THIS MODIFICATION ADDS INCREMENTAL FUNDING IN THE AMOUNT OF $1,587,000.00. |
| Oct 30, 2020 | 74 | $1.6M | THE PURPOSE OF THIS MODIFICATION (74) IS TO (1) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $1,571,538.79, (2) CORRECT AN ADMINISTRATIVE ERROR ON MODIFICATIONS 70 AND 71 AND (3) INCORPORATE A REVISED GOVERNMENT FURNISHED PROPERTY (GFP) LIST. |
| Sep 29, 2020 | 73 | $48.4K | THIS MODIFICATION (73) IS TO (1) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $48,375.53 AND (2) REALIGN TRAVEL FUNDING TOTALING $11,000.00 FROM OPTION PERIOD 3 TO OPTION PERIOD 2. |
| Sep 28, 2020 | 72 | $375.0K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| Sep 25, 2020 | 70 | $67.1K | THIS MODIFICATION ADDS INCREMENTAL FUNDING IN THE AMOUNT OF $67,123.79 AND REALIGNS A COMBINATION OF LABOR AND TRAVEL FUNDING TOTALING $3,492.000.00 FROM OPTION PERIOD 2 TO OPTION PERIOD 3. |
| Sep 25, 2020 | 71 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE RE-ALIGNMENT FROM MOD 70. |
| Sep 16, 2020 | 69 | $381.9K | THIS MODIFICATION ADDS INCREMENTAL FUNDING, REALIGNS FUNDING, DE-OBLIGATES FUNDING, AND ADDS AN ADDITIONAL SUBCONTRACTOR, |
| Aug 26, 2020 | 67 | $0 | THIS MODIFICATION INCORPORATES FAR CLAUSE 52.204-25. |
| Aug 26, 2020 | 68 | $0 | THIS MODIFICATION CORRECTS THE EFFECTIVE DATE OF THE PREVIOUS MODIFICATION FROM 8/26/2020 TO 8/13/2020. |
| Aug 25, 2020 | 66 | $4.7M | THE PURPOSE OF THIS MODIFICATION (66) IS TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $4,718,841.36. |
| Aug 14, 2020 | 65 | $-1.8M | THIS MODIFICATION REALIGNS FUNDING FROM OPTION PERIOD 2 TO OPTION PERIOD 3, DE-OBLIGATES FUNDING FROM OPTION PERIOD 3, AS WELL AS INCORPORATES AN UPDATED GFP LIST. |
| Jul 29, 2020 | 64 | $312.2K | THIS MODIFICATION CORRECTS THE PERIOD OF PERFORMANCE START DATE FOR THE PREVIOUS MODIFICATION (63) AND ADDS INCREMENTAL FUNDING IN THE AMOUNT OF $312,176.90. |
| Jul 22, 2020 | 63 | $16.9M | THIS MODIFICATION EXERCISES OPTION PERIOD 3, IN ACCORDANCE WITH FAR 52.217-9, "OPTION TO EXTEND THE TERM OF CONTRACT". |
| Jul 15, 2020 | 62 | $-80.5K | THIS MODIFICATION DE-OBLIGATES EXCESS FUNDS. |
| Jul 8, 2020 | 61 | $0 | THIS MODIFICATION INCORPORATES A REDUCTION IN FEE IN THE AMOUNT OF $2,606.72 AS A RESULT OF DCAA AUDIT REPORT NO. 1341-2013A1010002, DATED 1 JUNE 2018 AND AUDIT REPORT NO. 01341-2014A10100002 AND 1341-2015A10100009, DATED 24 SEPTEMBER 2018. |
| May 29, 2020 | 60 | $-10.0K | THE PURPOSE OF THIS MODIFICATION (60) IS TO DE-OBLIGATE FUNDING IN THE AMOUNT OF $10,000.00 FROM OPTION YEAR 1. |
| Apr 28, 2020 | 59 | $332.4K | THE PURPOSE OF THIS MODIFICATION (59) IS TO (1) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $332,378.00, (2) REALIGN FUNDING IN THE AMOUNT OF $25,000.00, AND (3)CORRECT AN ADMINISTRATIVE ERROR ON A PREVIOUS MODIFICATION (58). |
| Mar 25, 2020 | 58 | $1.3M | THIS MODIFICATION (58) IS TO ADD INCREMENTAL FUNDING, DE OBLIGATE FUNDING, ADJUST THE CEILING AMOUNTS FOR THE CURRENT OPTION PERIOD,ADD ADDITIONAL GOVERNMENT FURNISHED PROPERTY, AND UPDATE THE DESIGNATED ALTERNATE CONTRACTING OFFICER REPRESENTATIVE. |
| Feb 28, 2020 | 57 | $2.8M | THIS MODIFICATION OBLIGATES FUNDING IN THE AMOUNT OF $2,826,189.72, ADDS ADDITIONAL GOVERNMENT FURNISHED PROPERTY, AND CORRECTS THE SLIN QUANTITY/UNIT OF MEASURE ON THE PREVIOUS MODIFICATION 56. |
| Jan 31, 2020 | 56 | $2.4M | THE PURPOSE OF THIS MODIFICATION (56) IS TO OBLIGATE FUNDING IN THE AMOUNT OF $2,395,024.00 AND ADJUST THE COST AND FEE ON THE PREVIOUS MODIFICATION (55). |
| Jan 17, 2020 | 55 | $-500.0K | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDING IN THE AMOUNT OF $500,000.00. |
| Dec 26, 2019 | 54 | $1.8M | HE PURPOSE OF THIS MODIFICATION (54) IS TO 1) ADD INCREMENTAL FUNDING IN THE AMOUNT OF $2,367,316.73, 2) DEOBLIGATING FUNDS IN THE AMOUNT OF $600,000.00 FROM SLIN 2001AB AND $16,000.00 FROM SLIN 2002AB, 3) AND ADD GFP DISPOSITION VERBIAGE TO OUR PWS. |
| Nov 20, 2019 | 53 | $1.0M | THIS MODIFICATION ADDS INCREMENTAL FUNDING IN THE AMOUNT OF $1,012,434.77, REALIGNS FUNDS IN THE AMOUNT OF $10,020.50 FROM CLIN 2001 TO CLIN 2002, AND CORRECTS AN ADMINISTRATIVE ERROR ON MODIFICATION 51. |
| Sep 30, 2019 | 52 | $157.4K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| Sep 27, 2019 | 51 | $2.9M | THE PURPOSE OF THIS MODIFICATION (51) IS TO ADD INCREMENTAL FUNDING AND PROCESS AN ADMINISTRATIVE CHANGE TO UPDATE THE PROGRAM ON A PREVIOUS MODIFICATION. |
| Sep 16, 2019 | 50 | $39.6K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| Aug 30, 2019 | 49 | $1.2M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING FOR SETA SUPPORT SERVICES. |
| Aug 15, 2019 | 48 | $771.2K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. |
| Jul 24, 2019 | 47 | $19.0M | EXERCISES OPTION PERIOD 2, ADDS/REALIGNS INCREMENTAL FUNDING, AND UPDATES/IDENTIFIES THE CONTRACTING OFFICER REPRESENTATIVE AND ALTERNATE CONTRACTING OFFICER REPRESENTATIVE IN SUPPORT OF SYSTEMS ENGINEERING TECHNICAL ASSISTANCE SUPPORT SERVICES. |
| Jul 16, 2019 | 46 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CORRECT AN ADMINISTRATIVE ERROR IN SUPPORT OF SETA SERVICES. |
| May 31, 2019 | 45 | $35.8K | THE PURPOSE OF THE THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING IN SUPPORT OF ELECTRONIC WARFARE&CYBER (EW&C) SYSTEMS ENGINEERING TECHNICAL ASSISTANCE (SETA) SUPPORT SERVICES. |
| May 14, 2019 | 44 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE GOVERNMENT FURNISHED PROPERTY LIST IN SUPPORT OF ELECTRONIC WARFARE&CYBER (EW&C) SYSTEMS ENGINEERING TECHNICAL ASSISTANCE (SETA) SUPPORT SERVICES. |
| Apr 26, 2019 | 43 | $2.4M | THIS MODIFICATION ADDS INCREMENTAL FUNDING IN THE AMOUNT OF $2,416,211.44 AND DE-OBLIGATES FUNDING IN THE AMOUNT OF $380,000.00. |
| Apr 12, 2019 | 42 | $1.9M | THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE CEILING DUE TO AN INCREASE IN REQUIREMENT AND ADD ADDITIONAL FUNDING. |
| Apr 3, 2019 | 41 | $-140.0K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING AS WELL AS DE-OBLIGATE FUNDING. |
| Feb 7, 2019 | 40 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ADD THE REVISED PWS TO INCORPORATE SHARP LANGUAGE AND TO ADD GFP TO CONTRACT. |
| Dec 20, 2018 | 38 | $60.0K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING FOR SETA SUPPORT SERVICES. |
| Nov 30, 2018 | 37 | $2.0M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING FOR SETA SUPPORT SERVICES. |
| Nov 27, 2018 | 36 | $350.0K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING FOR SETA SUPPORT SERVICES. |
| Nov 20, 2018 | 35 | $380.0K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING FOR SETA SUPPORT SERVICES. |
| Oct 31, 2018 | 34 | $208.4K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING FOR SETA SUPPORT. |
| Oct 23, 2018 | 33 | $2.7M | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING FOR SETA SUPPORT SERVICES. |
| Sep 28, 2018 | 32 | $352.4K | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE DD FORM 254, REALIGN FUNDING, AND ADD INCREMENTAL FUNDING FOR SETA SUPPORT SERVICES. |
| Sep 14, 2018 | 31 | $384.8K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING, MAKE ADMINISTRATIVE CORRECTION, AND UPDATE THE GOVERNMENT FURNISHED PROPERTY LIST. |
| Aug 22, 2018 | 30 | $786.3K | THE PURPOSE OF THIS MODIFICATION IS TO APPLY INCREMENTAL FUNDING FOR SETA SUPPORT SERVICES AND INCORPORATE THE REVISED PERFORMANCE WORK STATEMENT. |
| Aug 10, 2018 | 29 | $3.1M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING, REALIGN FUNDING, AS WELL AS INCORPORATE THE UPDATED PERFORMANCE WORK STATEMENT AND CONTRACT SECURITY CLASSIFICATION SPECIFICATION FORM. |
| Jul 27, 2018 | 28 | $11.0M | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION PERIOD I AND REALIGN FUNDS FROM THE BASE PERIOD TO THE OPTION PERIOD. |
| Jul 25, 2018 | 27 | $0 | THIS MODIFICATION IS TO DELETE CONTRACT LINE ITEM NUMBERS (CLINS)FOR OPTION PERIOD I FROM THE CONTRACT. |
| Jul 17, 2018 | 26 | $-169.4K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING, DE-OBLIGATE FUNDS, AS WELL AS ADD AN ALTERNATE CONTRACTING OFFICER REPRESENTATIVE FOR SETA SUPPORT SERVICES. |
| Jun 14, 2018 | 25 | $648.3K | THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO SETA SUPPORT SERVICES. |
| Jun 5, 2018 | 24 | $-550.3K | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE FUNDING FOR SETA SUPPORT SERVICES. |
| May 31, 2018 | 23 | $47.0K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING TO SETA SUPPORT SERVICES. |
| Apr 12, 2018 | 22 | $745.0K | THE PURPOSE OF THIS MODIFICATION IS TO ADD ADDITIONAL FUNDING FOR SETA SUPPORT SERVICES AS WELL AS ADDITIONAL ITEMS TO THE GOVERNMENT FURNISHED PROPERTY (GFP) LIST. |
| Mar 29, 2018 | 21 | $197.1K | THE PURPOSE OF THIS MODIFICATION IS TO ADD ADDITIONAL FUNDING FOR SETA SUPPORT SERVICES. |
| Mar 20, 2018 | 20 | $438.2K | THE PURPOSE OF THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING FOR SETA SUPPORT SERVICES. |
| Mar 12, 2018 | 19 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ADD GOVERNMENT FURNISHED PROPERTY (GFP). |
| Mar 1, 2018 | 18 | $800.0K | THE PURPOSE OF MODIFICATION 18 IS TO ADD ADDITIONAL FUNDING FOR SETA SUPPORT SERVICES. |
| Feb 23, 2018 | 17 | $2.7M | THE PURPOSE OF MODIFICATION, 17, IS TO ADD ADDITIONAL FUNDING FOR SETA SUPPORT SERVICES. |
| Jan 31, 2018 | 16 | $1.3M | THE PURPOSE OF THIS MODIFICATION IS TO ADD GOVERNMENT FURNISHED EQUIPMENT AND ADDITIONAL FUNDING FOR SETA SUPPORT SERVICES. |
| Jan 17, 2018 | 15 | $177.5K | THE PURPOSE OF THIS MODIFICATION IS TO ADD ADDITIONAL FUNDING TO SETA SUPPORT SERVICES. |
| Jan 7, 2018 | 39 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO REALIGN FUNDING FOR SETA SUPPORT SERVICES. |
| Jan 2, 2018 | 14 | $0 | THIS MODIFICATION WAS TO ADD GOVERNMENT FURNISHED PROPERTY FOR SETA SUPPORT SERVICES. |
| Dec 21, 2017 | 13 | $663.7K | THIS MODIFICATION IS TO ADD ADDITIONAL FUNDING. |
| Dec 14, 2017 | 12 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO ADD A SUBCONTRACTOR TO THE CONTRACT. |
| Dec 8, 2017 | 11 | $1.4M | THIS MODIFICATION IS TO ADD FUNDING TO SETA SUPPORT SERVICES. |
| Nov 30, 2017 | 10 | $825.0K | THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING AND UPDATE THE PERFORMANCE WORK STATEMENT (PWS). |
| Nov 14, 2017 | 9 | $71.5K | THIS MODIFICATION WAS TO ADD FUNDING FOR SETA SUPPORT SERVICES. |
| Oct 31, 2017 | 8 | $1.4M | THIS MODIFICATION IS TO PROVIDE FUNDING FOR SETA SUPPORT SERVICES. |
| Oct 10, 2017 | 7 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO RE-ALIGN FUNDING. |
| Sep 29, 2017 | 5 | $645.8K | IGF::CL,CT::IGF THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR SETA SUPPORT SERVICES. |
| Sep 29, 2017 | 6 | $717.2K | IGF::CL,CT::IGF THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR SETA SUPPORT SERVICES AND FIX AN ADMINISTRATIVE ERROR. |
| Sep 27, 2017 | 1A | $0 | IGF::CL,CT::IGF THE PURPOSE OF THIS MODIFICATION IS TO ADD TWO SUBCONTRACTORS AND FUNDING IN THE AMOUNT OF $100,000.00 TO SETA SUPPORT. |
| Sep 27, 2017 | 4 | $100.0K | IGF::CL,CT::IGF THE PURPOSE OF THIS MODIFICATION IS TO ADD TWO SUBCONTRACTORS AND FUNDING IN THE AMOUNT OF $100,000.00 TO SETA SUPPORT. |
| Sep 22, 2017 | 3 | $1.3M | IGF::CL,CT::IGF THE PURPOSE OF THIS MODIFICATION IS TO ADD ADDITIONAL FUNDING TO SETA SUPPORT SERVICES. |
| Sep 12, 2017 | 2 | $525.6K | IGF::CL,CT::IGF THE PURPOSE OF THIS MODIFICATION IS TO REALIGN FUNDING FROM THE TRANSITION-IN PERIOD TO THE BASE PERIOD AND TO ADD FUNDING TO THE BASE PERIOD AND TRANSITION PERIOD. |
| Aug 25, 2017 | 1 | $1.9M | IGF::CL,CT::IGF THE PURPOSE OF THIS MODIFICATION IS TO FIX SOME ADMINISTRATIVE ERRORS AND ADD FUNDING FOR SETA SUPPORT. |
| Aug 15, 2017 | 0 | $3.5M | IGF::CL,CT::IGF THIS TASK ORDER, KZ03, IS ISSUED PURSUANT TO THE BASIC CONTRACT, W15P7T-10-D-D421, ON A COST-PLUS-FIXED-FEE (CPFF) TERM AND COST (NO FEE) BASIS (TRAVEL/MATERIAL/ODC) FOR A PERIOD OF PERFORMANCE CONSISTS OF ONE (1) THIRTY (30) DAY TRANSITION PERIOD, ONE (1) ELEVEN (11) MONTH BASE PERIOD AND FOUR (4) TWELVE (12) MONTH OPTION PERIODS. THE PERIO OF PERFORMANCE FOR THE TRANSITION PERIOD STARTS ON 15 AUGUST 2017 THROUGH 14 SEPTEMBER 2017. THE PERIOD OF PERFORMANCE FOR THE BASE PERIOD STARTS ON 15 SEPTEMBER 2017 AND ENDS 14 AUGUST 2018. THE PERIOD OF PERFORMANCE FOR EACH FUNDING SLIN IS IDENTIFIED IN SECTION B. THE RAPID RESPONSE THIRD GENERATION (R2-3G) ORDER NUMBER ASSOCIATED WITH THIS TASK ORDER IS R23G-1002 |